Electrosteel Castings Srikalahasthi steel plant, also known as Srikalahasthi Works, is a steel plant in Srikalahasthi, Rachagunneri, Tirupati, Andhra Pradesh, India that operates blast furnace (BF) and induction furnace (IF) technology.
Location
The map below shows the exact location of the plant in Srikalahasthi, Rachagunneri, Tirupati, Andhra Pradesh, India:
- Location: Vill - Rachagunneri ,Mandal-Srikalahasthi, District - Tirupati, Andhra Pradesh , India, Pin - 517641
- Coordinates (WGS 84): 13.717188, 79.630588 (exact)
Background
Srikalahasthi Works (SW) of Electrosteel is an integrated facility spread across a 242 acres. The 4,00,000 TPA Ductile Iron Pipe Plant is integrated with the 5,25,000 TPA Mini Blast Furnace capacity, 2,80,000 TPA Coke Oven Plant, 22 MW Waste Heat Recovery captive Power Plant 2,00,000 TPA Cement Plant, 16,000 TPA Ferro Silicon Plant and 5 MLD Municipal Sewage Water Recycling Plant. The Blast Furnace Gas from the Mini Blast Furnace caters to various energy requirements, thereby reducing carbon emission significantly.[1] Srikalahasthi Pipes Limited was merged into Electrosteel Castings Limited in 2022.[2]
As of August 2025, the blast furnace was being operated at lower yield.[3]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Start date | Power source | Iron ore source | Coal source |
|---|---|---|---|
| 1994[4] | 22 MW Waste Heat Recovery Captive Power Plant[5] | unknown | unknown |
Table 2: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| Electrosteel Castings Ltd [100.0%] | 4295873171 [100.0%] | E100001012391 [100.0%] | Electrosteel Castings Ltd [100%][5] | 4295873171 | E100001012391 [100%] |
Table 3: Process and Products
| Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment |
|---|---|---|---|---|---|
| semi-finished, finished rolled[5] | di pipe, pig iron[6][5] | building and infrastructure[7] | 2023-12-10[8] | unknown | BF; IF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Induction furnace steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|
| announced | 0 | 0 |
| mothballed | 0 | 0 |
| operating | 0 | 0 |
| operating pre-retirement | 0 | 0 |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Blast furnace capacity | Nominal iron capacity (total) |
|---|---|---|
| operating | 575[9][5] | 575[9][5] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
| Sinter | Coke |
|---|---|
| 500[6] | 280[5] |
Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
| Year | Other/unknown steel production |
|---|---|
| 2019 | unknown |
| 2020 | unknown |
| 2021 | unknown |
| 2022 | unknown |
| 2023 | unknown |
| 2024 | unknown |
Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
| Year | BF production | Total (all routes) |
|---|---|---|
| 2019 | unknown | – |
| 2020 | 299[6] | 299[6] |
| 2021 | 259[6] | 259[6] |
| 2022 | unknown | – |
| 2023 | unknown | – |
| 2024 | unknown | – |
Unit Details
Table 9: Blast Furnace Details
| Unit name | Status | Announced date | Construction date | Start date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
|---|---|---|---|---|---|---|---|---|
| unknown BF (1) | operating[5] | – | – | 1994[4][6] | – | 275[10] | unknown | 2010[11] |
| unknown BF (2) | operating[12] | 2018[13] | 2020[6] | 2021[6] | 450.0[12] | 300[14][5] | – | – |
Table 10: Induction Furnace Details
| Unit name | Status | Announced date | Start date | Current capacity (ttpa) |
|---|---|---|---|---|
| IF (2) | operating pre-retirement[6] | – | – | 0 |
| IF (3) | mothballed[6] | – | – | 0 |
| unknown IF (1) | operating[6] | 2019[6] | 2021[6] | 0 |
| unknown IF (2) | announced[6] | 2019[6] | – | 0 |
Table 11: Induction Furnace Feedstock Details
| Unit name | Scrap-based | % scrap | % basic/merchant pig iron |
|---|---|---|---|
| IF (2) | unknown | – | – |
| IF (3) | unknown | – | – |
| unknown IF (1) | None | – | >0[15] |
| unknown IF (2) | None | unknown | – |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "Electrosteel Castings Limited (ECL) | Facilities". www.electrosteel.com. Retrieved 2024-10-16.
- ↑ "Electrosteel Castings Limited". www.electrosteel.com. Retrieved 2024-10-16.
- ↑ "Electrosteel Castings Limited Q1 FY '26 Earnings Conference Call" (PDF). Electrosteel. 2025-08-06. Retrieved 2025-10-01.
{{cite web}}: CS1 maint: url-status (link) - ↑ 4.0 4.1 https://www.goodreturns.in/company/srikalahasthi-pipes/history.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 https://web.archive.org/web/20240208202120/https://www.electrosteel.com/facilities/index.php. Archived from the original on 2024-02-08.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 6.14 6.15 (PDF) https://www.electrosteel.com/pdf/investors/compliance-report/Annual-Report/SriKalahasthi_AR_2020_21.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://www.hdfcsec.com/hsl.research.pdf/Electrosteel%20Castings%20Ltd%20-%20Stock%20Note%20-%2016.05.2023.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.electrosteel.com/quality/quality_certificates.php.
{{cite web}}: Missing or empty|title=(help) - ↑ 9.0 9.1 https://www.electrosteel.com/pdf/investors/shareholder-information/investor-presentation/SEpresnt.pdf;steelorbis.com/steel-news/latest-news/indias-srikalahasthi-pipes-shuts-down-mini-blast-furnace-to-complete-expansion-project-1209348.htm.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://www.electrosteel.com/pdf/investors/shareholder-information/investor-presentation/SEpresnt.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://www.electrosteel.com/pdf/investors/compliance-report/Annual-Report/SriKalahasthi_AR_2020_21.pdf https://www.goodreturns.in/company/srikalahasthi-pipes/history.html, https://www.electrosteel.com/pdf/investors/compliance-report/Annual-Report/SriKalahasthi_AR_2020_21.pdf.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 12.0 12.1 https://web.archive.org/web/20240208202919/https://pulkittmt.in/new-office-bearers-for-cii-tirupati-zone-2023-24/. Archived from the original on 2024-02-08.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.thehindubusinessline.com/companies/srikalahasthi-pipes-plans-to-install-new-mini-blast-furnace/article24581909.ece.
{{cite web}}: Missing or empty|title=(help) - ↑ steelorbis.com/steel-news/latest-news/indias-srikalahasthi-pipes-shuts-down-mini-blast-furnace-to-complete-expansion-project-1209348.htm
- ↑ (PDF) https://environmentclearance.nic.in/writereaddata/Online/TOR/13_Oct_2018_074050380V7JK1VODPrefeasibilityReport.pdf.
{{cite web}}: Missing or empty|title=(help)