The Ennore-Tuticorn-Bengalaru Gas Pipeline is an under construction natural gas pipeline.[1]

Location

The pipeline runs from Ennore to Madurai, Trichy and Tuticorin in Tamil Nadu and branches out to Bengaluru via Hosur in Karnataka.[2] The exact route can be seen in a July 2014 plan submitted to the Petroleum and Natural Gas Regulatory Board.[3]

Loading map...

Project Details

  • Operator: Indian Oil Corporation Ltd.[1]
  • Parent Company: Indian Oil Corporation Ltd.[1]
  • Proposed capacity: 84.67 MMSCMD[1]
  • Length: 889.18 miles / 1,431 kilometers[1]
  • Status: Construction[1]
  • Cost: $825 Million[4]
  • Start Year: 2022[4]

Background

The Petroleum and Natural Gas Regulatory Board authorized GTPIL to build the pipeline in October 2015.[5] Construction began in June 2018.[6] In March 2019 the Ennore LNG Terminal which will supply gas to the pipeline was commissioned.[2] As of March 3rd, 2021, the pipeline had been partially commissioned with 165.82 kilometers in operation and 1265.18 kilometers under construction.[1]

Articles and resources

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "Partially Commissioned Common Carrier Natural Gas Pipelines". PNGRB Data Bank. PNGRB. March 31, 2021.
  2. 2.0 2.1 Ennore LNG terminal to help Indian Oil fast-track city gas project, Live Mint, Mar. 8, 2019
  3. BID DOCUMENT NO. BID/NGPL/07/2014/1/ETBPNMTPL, PNGRB, July 2014
  4. 4.0 4.1 "Project Summary". www.cspm.gov.in. Retrieved 2021-09-01.
  5. Natural Gas Pipelines Under Construction, PNGRP, Jan. 15, 2016
  6. Ennore-Thirullavar-Madurai-Tuticorin pipeine to come up sooon, Projects Today, Jun. 25, 2018

Related GEM.wiki articles

External resources

External articles