Fangchenggang Qisha power station (中电广西防城港发电厂) is an operating power station of at least 2580-megawatts (MW) in Qisha, Gangkou, Fangchenggang, Guangxi, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Fangchenggang Qisha power station Qisha, Gangkou, Fangchenggang, Guangxi, China 21.5914, 108.3946 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5: 21.5914, 108.3946

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase I Unit 1 operating coal - bituminous 630 supercritical 2007
Phase I Unit 2 operating coal - bituminous 630 supercritical 2008
Phase II Unit 3 operating coal - bituminous 660 ultra-supercritical 2016
Phase II Unit 4 operating coal - bituminous 660 ultra-supercritical 2016
Phase III Unit 5 announced coal - bituminous 1000 ultra-supercritical

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase I Unit 1 CLP Guangxi Fangchenggang Energy Co Ltd [100.0%]
Phase I Unit 2 CLP Guangxi Fangchenggang Energy Co Ltd [100.0%]
Phase II Unit 3 CLP Guangxi Fangchenggang Energy Co Ltd [100.0%]
Phase II Unit 4 CLP Guangxi Fangchenggang Energy Co Ltd [100.0%]
Phase III Unit 5 CLP Guangxi Fangchenggang Energy Co Ltd [100.0%]

Project-level coal details

  • Permit(s): March 10, 2005, May 8, 2014

Background

The first two coal-fired units of Fangchenggang Qisha power station, totaling 1,260 MW, were brought online between 2007 and 2008. The plant is owned by CLP Group.[1]

In 2014, CLP Group said it was planning to build two additional coal-fired units at this plant, with a total planned capacity of 1,320 MW.[1][2][3] The units are planned to be ultra-supercritical, and are planned for completion in 2016.[4]

Unit 3 came online in November 2016, and unit 4 in December 2016.[5]

Expansion

In March 2020, a 1,000MW coal-fired expansion at the power station was listed as a preliminary project in the Guangxi "Energy Network Infrastructure Plan 2020-2022" (《广西“能源网”基础设施建设大会战实施方案(2020-2022年)》).[6]

In June 2023, officials were still meeting about the proposed expansion.[7]

Coal supply

The power station receives its coal supply from a dedicated terminal, the CLPGX coal terminal. CLP Group has a long-term coal supply from Indonesia for the power station.[4]