Fangchenggang Qisha power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Fangchenggang Qisha power station (中电广西防城港发电厂) is an operating power station of at least 2580-megawatts (MW) in Qisha, Gangkou, Fangchenggang, Guangxi, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Fangchenggang Qisha power station | Qisha, Gangkou, Fangchenggang, Guangxi, China | 21.5914, 108.3946 (exact) |
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5: 21.5914, 108.3946
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| Phase I Unit 1 | Operating | coal: bituminous[1] | 630 | supercritical | 2007 | False |
| Phase I Unit 2 | Operating | coal: bituminous[1] | 630 | supercritical | 2008 | False |
| Phase II Unit 3 | Operating | coal: bituminous[1] | 660 | ultra-supercritical | 2016 | False |
| Phase II Unit 4 | Operating | coal: bituminous[1] | 660 | ultra-supercritical | 2016 | False |
| Phase III Unit 5 | Shelved | coal: bituminous[1] | 1000 | ultra-supercritical | – | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase I Unit 1 | CLP Guangxi Fangchenggang Energy Co Ltd [100%] | China National Coal Group [70.0%]; China Energy Engineering Corp Ltd [30.0%] |
| Phase I Unit 2 | CLP Guangxi Fangchenggang Energy Co Ltd [100%] | China National Coal Group [70.0%]; China Energy Engineering Corp Ltd [30.0%] |
| Phase II Unit 3 | CLP Guangxi Fangchenggang Energy Co Ltd [100%] | China National Coal Group [70.0%]; China Energy Engineering Corp Ltd [30.0%] |
| Phase II Unit 4 | CLP Guangxi Fangchenggang Energy Co Ltd [100%] | China National Coal Group [70.0%]; China Energy Engineering Corp Ltd [30.0%] |
| Phase III Unit 5 | CLP Guangxi Fangchenggang Energy Co Ltd [100%] | China National Coal Group [70.0%]; China Energy Engineering Corp Ltd [30.0%] |
Project-level coal details
- Coal source(s): imported
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The first two coal-fired units of Fangchenggang Qisha power station, totaling 1,260 MW, were brought online between 2007 and 2008. The plant is owned by CLP Group.[2]
In 2014, CLP Group said it was planning to build two additional coal-fired units at this plant, with a total planned capacity of 1,320 MW.[2][3][4] The units are planned to be ultra-supercritical, and are planned for completion in 2016.[5]
Unit 3 came online in November 2016, and unit 4 in December 2016.[6]
Expansion
In March 2020, a 1,000MW coal-fired expansion at the power station was listed as a preliminary project in the Guangxi "Energy Network Infrastructure Plan 2020-2022" (《广西“能源网”基础设施建设大会战实施方案(2020-2022年)》).[7]
In June 2023, officials were still meeting about the proposed expansion.[8]
In December 2023, a government press conference noted that the project had completed site selection and was a priority coal power project for Guangxi[9].
In July 2024, a financial news report mentioned that a local branch of the People's Bank of China was guiding a bank to provide loans to support the project's construction[10]. No further solid news was found, and the project was shelved as of March 2025[11][12].
Coal supply
The power station receives its coal supply from a dedicated terminal, the CLPGX coal terminal. CLP Group has a long-term coal supply from Indonesia for the power station.[5]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 "中电广西防城港电力有限公司," Guangxi wikipedia, 2011/11/16
- ↑ "中电广西防城港电厂二期扩建工程正式展开," 中电新闻稿, 2014-6-24
- ↑ "防城港电厂二期扩建工程开工建设", 广西新闻网, 2014-6-19
- ↑ 5.0 5.1 "CLP Guangxi Fangchenggang Power Station Phase II to Start Construction," CLP Group, June 24, 2014
- ↑ "中电防城港电厂二期投产 总装机容量达2580MW," Guangxi, 2017-1-3
- ↑ "总投资445.6亿元!广西2020-2022年将推进7个煤电项目," Sohu, 2020-03-04
- ↑ 王树东会见防城港市委书记谭丕创, ChinaCoal, 2023-06-28
- ↑ "防城港市2023年全面深化改革工作新闻发布会". 防城港市人民政府. 2023-12-28. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "金融支持防城港电厂三期项目建设". 金融时报. 2024-07-03. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "防城港电厂一期#2汽轮机通流改造项目EPC总承包招标公告". BJX. 2025-06-27. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link) - ↑ "防城港电厂一期#2汽轮机通流改造项目(EPC总承包)中标候选人公示". BJX. 2025-08-15. Retrieved 2026-07-20.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.