Feralpi Calvisano steel plant
From Global Energy Monitor
| This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
Feralpi Calvisano steel plant, also known as Acciaieria Di Calvisano Lonato, is a steel plant in Calvisano, Lombardia, Italy that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Calvisano, Lombardia, Italy:
- Location: Via J.F. Kennedy, 101/A, 25012 Calvisano BS, Italy
- Coordinates (WGS 84): 45.371651, 10.331967 (exact)
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Start date | Workforce size | Power source |
|---|---|---|
| 1972[1] | 150[2] | Captive 3.9 MW solar PV[3] |
Table 2: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| Feralpi Holding SpA | 4298452820 | E100000130894 | Acciaierie di Calvisano SpA [100%][4] | 4297246896 | E100000130824 [100%] |
Table 3: Process and Products
| Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment |
|---|---|---|---|---|---|
| semi-finished[5][1] | billet[5][1] | building and infrastructure[6] | 2023-11-30[7] | 2025-08-31[7] | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|
| operating | 600[8] | 600[8] |
Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
| Year | EAF production | Other/unknown steel production | Total (all routes) |
|---|---|---|---|
| 2019 | 422[9] | –[9] | 422[9] |
| 2020 | unknown | unknown | – |
| 2021 | unknown | unknown | – |
| 2022 | unknown | unknown | – |
| 2023 | unknown | – | – |
| 2024 | 482[10] | –[10] | 482[10] |
Unit Details
Table 6: Electric Arc Furnace Details
| Unit name | Status | Current capacity (ttpa) | Current size (tonnes) |
|---|---|---|---|
| unknown EAF (1) | operating[5] | 600[8] | 80.0[1] |
Table 7: Electric Arc Furnace Feedstock Details
| Unit name | Scrap-based | % scrap |
|---|---|---|
| unknown EAF (1) | yes[5] | 100.00[5] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://www.viktormacha.com/nejnovejsi/acciaierie-di-calvisano-80t-eaf-1046.html.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://www.feralpigroup.com/sites/default/files/media/documents/2021-03/FERALPI_monografiaEN-LOW-2.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://www.feralpigroup.com/sites/default/files/media/documents/2024-11/CS_Feralpi_Investimenti%20Calvisano_8%20novembre%202024_def_2.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20220320123559/https://siprostahl.ch/en/steel-producers-feralpi-group/. Archived from the original on 2022-03-20.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 5.3 5.4 https://web.archive.org/web/20230127083027/https://www.feralpigroup.com/feralpi-experience/calvisano/index.html. Archived from the original on 2023-01-27.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20230921230342/https://www.feralpigroup.com/it/prodotti/acciai-edilizia/billette. Archived from the original on 2023-09-21.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 https://web.archive.org/web/20220727120225/https://www.feralpigroup.com/en/products/certification/system-certificates. Archived from the original on 2022-07-27.
{{cite web}}: Missing or empty|title=(help) - ↑ 8.0 8.1 8.2 "Map of EU steel production sites" (PDF). Eurofer. Archived from the original (PDF) on 2022-03-18.
- ↑ 9.0 9.1 9.2 (PDF) https://www.feralpigroup.com/sites/default/files/media/documents/2021-02/BILANCIO%20CONSOLIDATO%202019%20CON%20GRAFICA%20ING.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 10.0 10.1 10.2 https://report.feralpigroup.com/en.
{{cite web}}: Missing or empty|title=(help)
