Fujian Luoyuan Minguang Iron and Steel Co Ltd (福建罗源闽光钢铁有限责任公司) is a steel plant in Fuzhou, Fujian, China that operates blast furnace (BF) and basic oxygen furnace (BOF) technology.
Location
The map below shows the exact location of the plant in Fuzhou, Fujian, China:
- Location: Zone 1, Jingang Industrial Zone, Luoyuanwan Development Zone, Luoyuan County, Fuzhou City, Fujian Province
- Coordinates (WGS 84): 26.483815, 119.67105 (exact)
Background
The Sansteel Group's Luoyuan Minguang project, along with its supporting facilities, and the construction of a 1.3 million tons per year H-beam production line will be carried out in two phases. Main construction contents of Phase One: 1* 1280m3 blast furnace( into production in May 2022.[1][2]), 1 × 200m2 sintering production line, 3 × 600t/d twin-chamber kilns, 1 × 80,000m3 converter gas holder, a 50,000m3/d water treatment station, a 30,000m3/d wastewater treatment (with water recycling) station, implementing ultra-low emission transformation, and phasing out the existing 500m3 and 660m3 blast furnaces(discontinued in April 2021[3]), one each, and the existing 96m2 and 117m2 sintering production lines, as well as 6 × 180m3 and 1 × 550m3 lime kilns, with no additional production capacity.
Phase Two construction includes: 1*1250m3 blast furnace (into production in January 2021[4] ), 1 × 200m2 sintering production line supporting the production system, 1 × 120-ton BOF(into production in May 2022[5]), a set of 5-machine 5-strand continuous casting machines for irregular shapes, Phase Two of the integrated raw material yard, facilities for steel slag and water slag treatment, railway, pipeline, and other auxiliary systems.
At the same time, a 1.3 million tons per year H-beam production line will be built, adopting domestically advanced production processes and developing internationally advanced varieties of H-beam to achieve high-performance and high-quality products. Upon completion of the project, it will have an ironmaking capacity of 2.33 million tons and a steelmaking capacity of 2.65 million tons, with an annual output value of up to 15 billion yuan and a profit of 1 billion yuan.
According to the announcement of capacity replacement in October 2021, it is planned to build 1x110-tonne BOF and remove 2x50-tonne BOF.[6]
The company’s 1 × 110t BOF steelmaking system successfully completed its first furnace smelting and has now transitioned into continuous production.[7]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
Start date | Workforce size | Power source |
---|---|---|
2014[8] | 2509[9][10] | Self-owned power generation[11] |
Table 2: Ownership and Parent Company Information
State-owned entity status | Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|---|
Partial | Fujian Metallurgical Holding Co Ltd [53.4%]; unknown [46.6%] | unknown [53.4%]; not applicable [46.6%] | E100000124862 [53.4%]; E100000132388 [46.6%] | Fujian Luoyuan Minguang Iron & Steel Co Ltd [100%][10] | unknown | E100000123227 [100%] |
Table 3: Process and Products
Steel product category | Steel products | ISO 14001 | ISO 50001 | Responsible steel | Main production equipment |
---|---|---|---|---|---|
semi-finished, finished rolled[8] | billet, round bar, rebar[8] | 2023-05-30[12] | 2023-05-30[12] | unknown | BF; BOF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
operating | 2650[13][14] | 2650[13][14] |
retired | 1800[8] | 1800[8] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Blast furnace capacity | Nominal iron capacity (total) |
---|---|---|
operating | 2330[13] | 2330[13] |
retired | 1334[13] | 1334[13] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Sinter | Coke | Pellets |
---|---|---|
2230[15] | NF | NF |
Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year | BOF production | Other/unknown steel production | Total (all routes) |
---|---|---|---|
2019 | unknown | unknown | – |
2020 | 1994[16] | –[16] | 1994[16] |
2021 | unknown | unknown | – |
2022 | unknown | unknown | – |
2023 | – | unknown | – |
Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
Year | BF production | DRI production | Other/unknown iron production | Total (all routes) |
---|---|---|---|---|
2019 | unknown | unknown | unknown | – |
2020 | 1699[16] | –[16] | –[16] | 1699[16] |
2021 | unknown | – | unknown | – |
2022 | unknown | – | unknown | – |
2023 | – | – | unknown | – |
Unit Details
Table 9: Blast Furnace Details
Unit name | Status | Announced date | Start date | Retired date | Current size | Current capacity (ttpa) | Decarbonization technology |
---|---|---|---|---|---|---|---|
BF 1 | operating[17] | 2020[13] | 2021[17] | – | 1250.0 m3[13] | 1150[13] | unknown |
BF 2 | operating[18][13] | 2017[13] | 2019[13] | – | 1280.0 m3[13] | 1180[13] | unknown |
unknown BF (1) | retired[13] | – | – | 2019[13] | 500.0 m3[19] | 600[13] | unknown |
unknown BF (2) | retired[13] | – | – | 2019[13] | 660.0 m3[19] | 734[13] | unknown |
Table 10: Basic Oxygen Furnace Details
Unit name | Status | Announced date | Construction date | Start date | Retired date | Current capacity (ttpa) | Current size |
---|---|---|---|---|---|---|---|
unknown BOF (1) | retired[14] | – | – | – | 2024-09[20] | 900[8] | 50.0 tonnes[13] |
unknown BOF (2) | retired[14] | – | – | – | 2024-09[20] | 900[8] | 50.0 tonnes[13] |
unknown BOF (3) | operating[14][21] | 2021-10[14] | 2023-04[22] | 2024[21] | – | 1250[14] | 110.0 tonnes[14][13] |
unknown BOF (4) | operating[13] | – | 2020[13] | 2022[23][24] | – | 1400[13] | 120.0 tonnes[13] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ 马春林 (2022-05-16). "罗源闽光钢铁2#高炉点火投产" (in 中文). Retrieved 2022-09-28.
{{cite web}}
: Text "中冶集团" ignored (help)CS1 maint: url-status (link) - ↑ 企业简介, 福建罗源闽光钢铁有限责任公司网站, Accessed July 2021
- ↑ "福建三钢闽光股份有限公司产能置换(罗源闽光部分)及配套项目环境影响报告书" (PDF). 2022年2月.
{{cite news}}
: Check date values in:|date=
(help) - ↑ "中冶华天总承包罗源闽光钢铁1号高炉顺行、低耗、高产 - 中冶华天工程技术有限公司". www.mcc-ht.com. 2021-10-26. Retrieved 2023-01-25.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "深耕"绿色+智造" 罗源湾钢铁基地加速跑". 金台资讯. 2022-08-05.
- ↑ 福建三钢闽光股份有限公司产能置换方案公告,福建省工业和信息化厅,October 26, 2021
- ↑ "福建罗源110t炼钢工程顺利热试". mysteel.com. 2024-10-14.
- ↑ 8.0 8.1 8.2 8.3 8.4 8.5 8.6 https://web.archive.org/web/20220121111423/http://www.sgmgnet.com/lymg/index.htm. Archived from the original on 2022-01-21.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.tianyancha.com/company/962627489.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 https://web.archive.org/web/20220110202046/https://www.qcc.com/firm/3af95b5600fac0a4792e66ca847c860e.html. Archived from the original on 10 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220702143022/http://www.1fdjz.com/new/new-74-259.html. Archived from the original on 2022-07-02.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 https://web.archive.org/web/20231004162954/http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E7%A6%8F%E5%BB%BA%E7%BD%97%E6%BA%90%E9%97%BD%E5%85%89%E9%92%A2%E9%93%81%E6%9C%89%E9%99%90%E8%B4%A3%E4%BB%BB%E5%85%AC%E5%8F%B8&fromIndex=true. Archived from the original on 2023-10-04.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.00 13.01 13.02 13.03 13.04 13.05 13.06 13.07 13.08 13.09 13.10 13.11 13.12 13.13 13.14 13.15 13.16 13.17 13.18 13.19 13.20 13.21 13.22 13.23 13.24 13.25 13.26 (PDF) http://sthjt.fujian.gov.cn/zwgk/gsgg/202202/P020220208597265737540.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 14.3 14.4 14.5 14.6 14.7 https://web.archive.org/web/20220124204138/https://factory.mysteel.com/21/1027/10/CE1CB15DD7E28BC3.html. Archived from the original on 2022-01-24.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20231205144925/https://business.sohu.com/a/682135044_121123751. Archived from the original on 2023-12-05.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 16.0 16.1 16.2 16.3 16.4 16.5 16.6 https://web.archive.org/web/20220318111259/http://lymgsbjy.com/extranet/article?contId=16709. Archived from the original on 2022-03-18.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 https://www.mcc-ht.com/tpxw/202110/t20211026_263274.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.cnfeol.com/gangtie/n_152543359864.aspx.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 19.0 19.1 "全国规范钢铁企业拟增至263家(附全名单及其装备)". finance.sina.com.cn. 2020-03-02. Archived from the original on 2022-02-07. Retrieved 2024-11-19.
- ↑ 20.0 20.1 https://baijiahao.baidu.com/s?id=1810722483443270622&wfr=spider&for=pc.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 21.0 21.1 https://news.mysteel.com/a/24101416/28C97B37BEE2DBE6.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240905154813/https://baijiahao.baidu.com/s?id=1764260739226174955&wfr=spider&for=pc. Archived from the original on 2024-09-05.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240115055732/https://mp.weixin.qq.com/s?__biz=MjM5NzY4ODI0MA==&mid=2650834481&idx=8&sn=10e592f84bc64fbf1d64ea10498d34dd&chksm=bd2200ee8a5589f8b7fc552fcad94faa782facdcbcac040855e0ffc9c7b870a2d39c64542711&scene=27. Archived from the original on 2024-01-15.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240911001831/https://wappass.baidu.com/static/captcha/tuxing.html?ak=572be823e2f50ea759a616c060d6b9f1&backurl=https%253A%252F%252Fmbd.baidu.com%252Fnewspage%252Fdata%252Flandingsuper%253Fid%253D1740279983691371995%2526wfr%253Dspider%2526for%253Dpc%2526third%253Dbaijiahao%2526baijiahao_id%253D1740279983691371995%2526c_source%253Dkunlun%2526c_score%253D0.999000×tamp=1726013910&signature=8b723ed0fa2e16a64879a040a52de92c. Archived from the original on 2024-09-11.
{{cite web}}
: Missing or empty|title=
(help)