Southeast Gateway Gas Pipeline
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
The Southeast Gateway Gas Pipeline (known locally as Gasoducto Puerta al Sureste) is an operating natural gas pipeline in Mexico.[1][2][3][4]
Location
From its northern terminus in Tuxpan (Veracruz state), the pipeline runs primarily offshore, following Mexico's Gulf coast southeast for hundreds of kilometers before making landfall again at Coatzacoalcos (Veracruz state) and Dos Bocas (Tabasco state).[1]
Project Details
- Operator: TC Energía
- Owner: TC Energía; Comisión Federal de Electricidad (CFE)[1]
- Parent company: TC Energy; Comisión Federal de Electricidad (CFE)
- Capacity: 1.3 billion cubic feet per day[1][5]
- Length: 715 km[1][5] to 778 km[6]
- Diameter: 36 inches[7][8]
- Status: Operating[5][9]
- Start year: 2025[1][5][9][10][11]
- Cost: US$4.5 billion[1][4][12]
- Financing: FID (August 2022)[1]
- Associated infrastructure:
Background
In July 2022, the Canadian firm TC Energy announced a partnership with Mexico's CFE (Comisión Federal de Electricidad) to build an extension to TC Energy's existing Sur de Texas-Tuxpan Gas Pipeline.[13][14] The estimated budget for constructing the new pipeline was initially estimated at US$5 billion.[13][14] The new offshore pipeline, known as the Southeast Gateway Gas Pipeline, would transport natural gas from the existing pipeline's southern terminus in Tuxpan to the port of Coatzacoalcos in Veracruz state. An additional section of offshore pipeline would extend east from Coatzacoalcos, making landfall again at the Dos Bocas refinery in Tabasco state.[1]
The Southeast Gateway pipeline was designed to supply fossil gas to new power plants on Mexico's Yucatán Peninsula, including the 565 MW CCC Mérida power station and the 1.1 GW CCC Riviera Maya (Valladolid) power station.[9] Gas from the pipeline was also expected to eventually feed the expanded Jáltipan-Salina Cruz Gas Pipeline for transport across the Tehuantepec Isthmus to the proposed Salina Cruz LNG Export Terminal.[13][14]
The new pipeline was to initially be owned 85% by TC Energy and 15% by CFE, with CFE's ownership stake increasing to 49% by 2026.[14]
Final Investment Decision (2022)
In August 2022, TC Energy and the Mexican Comisión Federal de Electricidad (CFE) reached an FID to build the project, as part of a broader strategic alliance consolidating other infrastructure, including the Tula-Villa de Reyes Gas Pipeline and Tuxpan-Tula Gas Pipeline.[1] On August 10, 2022, TC Energy announced a public offering of common shares to help fund the project.[4]
According to TC Energy, the pipeline was to be 715 kilometers in length[1]; CFE, in its 2022 annual report, described the pipeline as slightly longer (778 kilometers).[6]
Construction Begins (2023)
As of July 2023, TC Energy reported that onshore pipeline construction was already underway, with the installation of offshore segments scheduled to begin in late 2023[15][16], and start-up of commercial operations expected during the first quarter of 2025.[16]
In May 2024 TC Energy reported that all three landfall sites for the Southeast Gateway Pipeline were 100% complete, with deepwater offshore pipe installation more than 70% complete, and steady progress underway in the construction of onshore facilities.[17][18] The pipeline project reportedly remained on budget and on schedule for a mid-2025 start-up date.[12]
Start-up of Commercial Operations (2025)
The Southeast Gateway pipeline began operating in May 2025[9][19], following completion of offshore pipe installation and mechanical work earlier in the year.[7][8] In June 2025 TC Energy reported that the pipeline's successful completion took less than three years from the original FID date, and at a cost roughly 13% lower than originally estimated.[5] A company press release noted that TC Energy had already received payment from CFE for initial shipments of gas through the pipeline during the month of May, while gas supply to other customers remained contingent on regulated rate approval from Mexico's Comisión Nacional de Energía.[5]
Opposition and environmental concerns
Following the August 2022 final investment decision on the Southeast Gateway pipeline, 18 organizations led by the Centro Mexicano de Derecho Ambiental (CEMDA) warned of the pipeline's grave risk to the surrounding coral reef corridor. They alleged that TC Energy and CFE were trying to avoid scrutiny of the project's total impact by filing separate statements for two sections of the pipeline, and urged oil and gas regulator Agencia de Seguridad, Energía y Ambiente (ASEA) to order TC Energy and CFE to submit a single impact statement for the project as a whole.[20]
Environmentalists and others have noted that implementation of the Southeast Gateway pipeline will increase demand for gas in the Yucatán, raise emissions, and lock Mexico into fossil fuel dependence for another generation.[21]
Articles and resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 "TC Energy and Mexico's Comisión Federal de Electricidad announce a first-of-its-kind strategic partnership to develop world-class energy infrastructure in Mexico". TC Energy. August 4, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "TC Energy, Mexico to build 1.3 bcfd Southeast Gateway pipeline". OGJ (Oil & Gas Journal). August 8, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "TC Energy, CFE to build $4.5bn Southeast Gateway Pipeline in Mexico". NS Energy. August 4, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 4.0 4.1 4.2 "TC Energy Corp. completes public offering of common shares". CTV News Calgary. August 10, 2022.
- ↑ 5.0 5.1 5.2 5.3 5.4 5.5 "TC Energy commences collection of tolls on Southeast Gateway pipeline". TC Energy. 2025-06-27.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 6.0 6.1 "Informe Anual 2022 (p 24)" (PDF). CFE (Comisión Federal de Electricidad). April 27, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 7.0 7.1 Lenton, Christopher (2025-06-11). "Southeast Gateway Pipeline, Power Plant Startups Signal More Natural Gas Demand at Agua Dulce". NGI - Natural Gas Intelligence.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 8.0 8.1 "Allseas delivers Southeast Gateway Pipeline ahead of schedule". Allseas. 2025-01-07.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 9.0 9.1 9.2 9.3 Mariano, Efrain (2025-08-13). "Gasoducto Puerta al Sureste redefine la seguridad energética en México". Energy & Commerce.
- ↑ "TC Energy, Mexico to build 1.3 bcfd Southeast Gateway pipeline". Oil & Gas Journal. August 8, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "TC Energy reports strong first quarter 2023 results". TC Energy. April 28, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 12.0 12.1 "TC Energy Nears Commercial Start-Up of Coastal GasLink, Advances Southeast Gateway Offshore Pipeline". NGI (Natural Gas Intel). 2024-05-09.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 13.0 13.1 13.2 "Mexico Touts Multi-Billion Dollar Public-Private Natural Gas Projects". NGI (Natural Gas Intelligence). July 5, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 14.0 14.1 14.2 14.3 "CFE and TC Energy Join Forces to Build US$5 billion Pipeline". Mexico Business News. July 6, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "TC Energy reports solid second quarter 2023 results, while significantly advancing Coastal GasLink and Southeast Gateway projects to planned cost and schedule". TC Energy. July 27, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 16.0 16.1 "El gasoducto Puerta al Sureste, que desarrollarán la CFE y TC Energía, operará a finales del primer trimestre de 2025". Costa Veracruz. July 21, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "First quarter 2024 conference call" (PDF). TC Energy. 2024-05-03.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "TC Energy reports strong first quarter 2024 operating and financial results". TC Energy. 2024-05-03. Retrieved 2024-07-03.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Realiza CFE primer pago por gas a TC Energía". Energía A Debate. 2025-06-27.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Baker, Andrew (30 August 2022). "Mexico Environmental Groups Call for Tighter Scrutiny of Proposed $4.5B Natural Gas Pipeline". Natural Gas Intelligence. Retrieved 28 October 2022.
- ↑ "The Climate Scientist Who Leads Mexico Is Betting on Decades of Fossil Fuel". EnergyNow. 2024-10-22.