Gohar Zamin Bardsir steel plant
From Global Energy Monitor
| This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
Gohar Zamin Bardsir steel plant (پروژه احیای مستقیم بردسیر شرکت گهر زمین, مجتمع فولاد شرکت گهر زمین در بردسیر), also known as Gohar Zamin Bardsir DRI plant, Gohar Zamin Mining and Industrial Company, is a steel plant in Bardsir, Kerman, Iran that operates direct reduced iron (DRI) and electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Bardsir, Kerman, Iran:
- Location: Bardsir - Baghin Highway, Barsir, Kerman, Iran
- Coordinates (WGS 84): 29.953217, 56.699701 (exact)
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Start date |
|---|
| 2025-11[1] |
Table 2: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| Gohar Zamin Mining and Industrial Company [100.0%] | unknown [100.0%] | E100002020551 [100.0%] | Gohar Zamin Mining and Industrial Company [100%][2] | unknown | E100002020551 [100%] |
Table 3: Process and Products
| Steel product category | Steel products | ISO 14001 | ISO 50001 | Responsible steel | Main production equipment |
|---|---|---|---|---|---|
| crude | DRI[1] | unknown | unknown | unknown | DRI; EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|
| announced | 4720[2] | 4720[2] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Sponge iron/DRI capacity | Nominal iron capacity (total) |
|---|---|---|
| operating | 3440[3][1][4] | 3440[3][1][4] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
| Sinter | Pellets |
|---|---|
| NF | NF |
Unit Details
Table 7: Direct Reduced Iron Furnace Details
| Unit name | Status | Start date | Furnace manufacturer and model | Current capacity (ttpa) |
|---|---|---|---|---|
| unknown DRI (1) | operating[1] | 2025[1] | Fakoor Sanat Tehran (FSTCO)[4] | 1720[1][4] |
| unknown DRI (2) | operating[1] | 2025[1] | Fakoor Sanat Tehran (FSTCo)[3] | 1720[3][1] |
Table 8: Electric Arc Furnace Details
| Unit name | Status | Current capacity (ttpa) |
|---|---|---|
| unknown EAF (1) | announced[2] | 3000[2] |
| unknown EAF (2) | announced[2] | 1720[2] |
Table 9: Electric Arc Furnace Feedstock Details
| Unit name | Scrap-based |
|---|---|
| unknown EAF (1) | unknown |
| unknown EAF (2) | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 https://felezatkhavarmianeh.ir/fa/news/390714/%DA%AF%D8%A7%D9%85-%D8%A8%D9%84%D9%86%D8%AF-%DA%AF%D9%87%D8%B1%D8%B2%D9%85%DB%8C%D9%86-%D8%A8%D8%B1%D8%A7%DB%8C-%D8%AA%DA%A9%D9%85%DB%8C%D9%84-%D8%B2%D9%86%D8%AC%DB%8C%D8%B1%D9%87-%D9%81%D9%88%D9%84%D8%A7%D8%AF-%D8%A2%D8%BA%D8%A7%D8%B2-%D8%AA%D9%88%D9%84%DB%8C%D8%AF-%D8%A2%D9%87%D9%86-%D8%A7%D8%B3%D9%81%D9%86%D8%AC%DB%8C-%D8%AF%D8%B1-%D8%A8%D8%B1%D8%AF%D8%B3%DB%8C%D8%B1.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 (PDF) https://www.goharzamin.com/403/tafsiri403.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 https://fstco.com/en/projects/group/detail/Implementation-of-two-Direct-Reduction-Iron-units/91/view/.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 https://www.fstco.com/en/projects/group/detail/Implementation-of-two-Direct-Reduction-Iron-units/91/view/.
{{cite web}}: Missing or empty|title=(help)
