Golgohar Iron and Steel Company Kerman

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Golgohar Iron and Steel Company Kerman (شرکت توسعه آهن و فولاد گل گهر), also known as Gol Gohar Steelmaking Complex, Golgohar Iron and Steel Development Company, GISCO, GISDCO, is a steel plant in Sirjan, Kerman, Iran that operates electric arc furnace (EAF) and direct reduced iron (DRI) technology.

Location

The map below shows the exact location of the plant in Sirjan, Kerman, Iran:

Loading map...
  • Location: Sirjan, Kerman Province, Iran
  • Coordinates (WGS 84): 29.134614, 55.360773 (exact)

Background

Since it opened in 2015, the Gol Gohar Iron and Steel plant has taken iron from the Gol Gohar mines and processed it into Direct Reduced Iron (DRI) and crude steel. The plant includes three DRI units with a total capacity of 5.55 million tons per year, making this one of the largest DRI plants in Iran and in the world.[1] It also includes two Electric Arc Furnace (EAF) units, with 3.3 million tons per year in steelmaking capacity.[2]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Plant Details

Table 1: General Plant Details

Start date Workforce size Power source Iron ore source
2015[3][4] 3000[5] Hadid Power Post (1000 MWA)[4] Gol Gohar Mine (P100000128556)[6][7]

Table 2: Ownership and Parent Company Information

State-owned entity status Parent company Parent company PermID Parent GEM entity ID Owner Owner company PermID Owner GEM entity ID
Partial Golgohar Mining and Industrial Co [35.0%]; Golgohar Investment and Development Co [15.0%]; National bank employees' pension fund [10.0%]; small shareholder(s) [6.1%]; Social Insurance Fund of Farmers and Villagers [1.9%]; Retirement, Pension and Disability Fund of Banks [1.7%]; Sadr Tamin Investment Co [0.8%]; Iranian Mines & Mining Industries Development & Renovation Organization [0.8%]; Justice Shares Broker Co [0.6%]; Mobarakeh Steel Co [0.6%]; Rafeh Capital Development Co [0.5%]; Ghadir Industrial and Mining Development International Co; Ghadir Investment Company PJSC; Iron Alloy Steel Co; Mines & Metals Development Investment Co; Provincial Investment Co; Sepah Bank; Shahrood Steel Co 5058647259 [35.0%]; unknown [15.0%]; unknown [10.0%]; not applicable [6.1%]; unknown [1.9%]; unknown [1.7%]; 5074708740 [0.8%]; 5000935267 [0.8%]; unknown [0.6%]; 5001102887 [0.6%]; unknown [0.5%]; unknown; 5035729783; unknown; unknown; unknown; 5000066848; unknown E100000000544 [35.0%]; E100002021998 [15.0%]; E100002022001 [10.0%]; E100001015587 [6.1%]; E100002022014 [1.9%]; E100002022015 [1.7%]; E100001011683 [0.8%]; E100000000547 [0.8%]; E100002011231 [0.6%]; E100000001959 [0.6%]; E100002026856 [0.5%]; E100002022013; E100000000543; E100002022012; E100001011682; E100001011239; E100002011718; E100001016092 Golgohar Iron and Steel Development Co [100%][4] 5083506527 E100001000427 [100%]

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Responsible steel Main production equipment
crude, semi-finished, finished rolled[8][4] slab, hot rolled coil, DRI, cold DRI, hot DRI[5][4] unknown yes[9] yes[9] unknown DRI; EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 3300[10][11][12] 3300[10][11][12]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Sponge iron/DRI capacity Nominal iron capacity (total)
operating 5550[13][9][3][14] 5550[13][9][3][14]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter Pellets
NF 5000[15]

Table 7: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)

Year DRI production Other/unknown iron production Total (all routes)
2019 unknown unknown –
2020 unknown unknown –
2021 2876[16] –[16] 2876[16]
2022 unknown unknown –
2023 unknown unknown –
2024 unknown unknown –

Unit Details

Table 8: Direct Reduced Iron Furnace Details

Unit name Status Construction date Start date Furnace manufacturer and model Furnace type Current capacity (ttpa)
DRI 1 Gohar operating[14] – 2015[17] MMTE Midrex[18][19][17] shaft furnace[17] 1700[14][13]
DRI 2 Kausar operating[14] – 2018[17] MMTE, Arya Hadid Midrex[20][17] shaft furnace[17] 2000[3][13]
DRI 3 Touba operating[21] 2019[4] 2024[4] MMTE, Arya Hadeed Midrex[22][4] shaft furnace[23] 1850[9]

Table 9: Direct Reduced Iron Furnace Reductant Details

Unit name Current or initial reductant Gas reductant
DRI 1 Gohar gas[24] syngas (reformed methane)[24]
DRI 2 Kausar gas[24] syngas (reformed methane)[24]
DRI 3 Touba gas gas (unknown type)

Table 10: Electric Arc Furnace Details

Unit name Status Start date Furnace manufacturer and model Current capacity (ttpa) Current size (tonnes)
unknown EAF (1) operating[11] 2023[11] Fakoor Sanat, Saralle[11] 1800[12][11] 240.0[11]
unknown EAF (2) operating[10] 2024[10] Fakoor Sanat[10] 1500[12][10] 200.0[10]

Table 11: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap % DRI % HBI % sponge iron (unknown if DRI or HBI) % basic/merchant pig iron % granulated pig iron % pig iron (unknown if basic/merchant or granulated) % other iron
unknown EAF (1) no[25] 0[9][25] 100.00[25] 0[25] >0[25] 0[25] 0[25] 0[25] 0[25]
unknown EAF (2) no[9] 0[9] 100.00 – – – – – –

Articles and Resources

Additional data

To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. ↑ "کارخانه ها و پروژه ها – شرکت توسعه آهن و فولاد گل گهر". gisdco.com. Retrieved 2025-12-03.
  2. ↑ "اولین قوس الکتریکى کوره ٢۴٠ تنى شرکت توسعه آهن و فولاد گلگهر توسط مهندسان فکور صنعت تهران اجرایی شد | ماین نیوز". www.akhbaremadan.ir. Retrieved 2025-12-03.
  3. ↑ 3.0 3.1 3.2 3.3 "2020 World Direct Reduction Statistics" (PDF). Midrex. 2021-09-14. Archived from the original (PDF) on 2021-11-29.
  4. ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 https://web.archive.org/web/20250213222450/https://gisdco.com/en/. Archived from the original on 2025-02-13. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 https://barsoo.com/en/project/golgohar-iron-and-steel-development/. {{cite web}}: Missing or empty |title= (help)
  6. ↑ https://www.goharzamin.com/. {{cite web}}: Missing or empty |title= (help)
  7. ↑ https://www.gem.wiki/Gol_Gohar_Mine. {{cite web}}: Missing or empty |title= (help)
  8. ↑ https://gisdco.com/%d9%85%d8%b9%d8%b1%d9%81%db%8c-%d8%b4%d8%b1%da%a9%d8%aa/. {{cite web}}: Missing or empty |title= (help)
  9. ↑ 9.0 9.1 9.2 9.3 9.4 9.5 9.6 9.7 https://gisdco.com/%d9%85%d8%b3%d8%a6%d9%88%d9%84%db%8c%d8%aa-%d9%87%d8%a7%db%8c-%d8%a7%d8%ac%d8%aa%d9%85%d8%a7%d8%b9%db%8c/. {{cite web}}: Missing or empty |title= (help)
  10. ↑ 10.0 10.1 10.2 10.3 10.4 10.5 10.6 https://charkheghtesadnews.ir/%D9%85%D9%88%D9%81%D9%82%DB%8C%D8%AA-%D9%81%DA%A9%D9%88%D8%B1-%D8%B5%D9%86%D8%B9%D8%AA-%D8%AF%D8%B1-%D8%B1%D8%A7%D9%87-%D8%A7%D9%86%D8%AF%D8%A7%D8%B2%DB%8C-%D8%A7%D9%88%D9%84%DB%8C/. {{cite web}}: Missing or empty |title= (help)
  11. ↑ 11.0 11.1 11.2 11.3 11.4 11.5 11.6 https://www.akhbaremadan.ir/news/70007/%D8%A7%D9%88%D9%84%DB%8C%D9%86-%D9%82%D9%88%D8%B3-%D8%A7%D9%84%DA%A9%D8%AA%D8%B1%DB%8C%DA%A9%D9%89-%DA%A9%D9%88%D8%B1%D9%87-%D9%A2%DB%B4%D9%A0-%D8%AA%D9%86%D9%89-%D8%B4%D8%B1%DA%A9%D8%AA-%D8%AA%D9%88%D8%B3%D8%B9%D9%87-%D8%A2%D9%87%D9%86-%D9%81%D9%88%D9%84%D8%A7%D8%AF-%DA%AF%D9%84%DA%AF%D9%87%D8%B1-%D8%AA%D9%88%D8%B3%D8%B7-%D9%85%D9%87%D9%86%D8%AF%D8%B3%D8%A7%D9%86-%D9%81%DA%A9%D9%88%D8%B1-%D8%B5%D9%86%D8%B9%D8%AA-%D8%AA%D9%87%D8%B1%D8%A7%D9%86-%D8%A7%D8%AC%D8%B1%D8%A7%DB%8C%DB%8C. {{cite web}}: Missing or empty |title= (help)
  12. ↑ 12.0 12.1 12.2 12.3 (PDF) https://web.archive.org/web/20230410190908/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2022.pdf (PDF). {{cite web}}: Check |archive-url= value (help); Missing or empty |title= (help)
  13. ↑ 13.0 13.1 13.2 13.3 https://gisdco.com/%d9%be%d8%b1%d9%88%da%98%d9%87-%d9%87%d8%a7%db%8c-%d8%b4%d8%b1%da%a9%d8%aa/. {{cite web}}: Missing or empty |title= (help)
  14. ↑ 14.0 14.1 14.2 14.3 14.4 "2022 World Direct Reduction Statistics" (PDF). Midrex. 2023-09-12. Archived from the original (PDF) on 2023-11-03.
  15. ↑ "Gol-E-Gohar Pelletizing Plant II - KAYSON INC". KAYSON INC. Archived from the original on 2026-02-03. Retrieved 2025-01-23.
  16. ↑ 16.0 16.1 16.2 https://journal.issiran.com/article_702055.html. {{cite web}}: Missing or empty |title= (help)
  17. ↑ 17.0 17.1 17.2 17.3 17.4 17.5 (PDF) https://www.midrex.com/wp-content/uploads/MidrexSTATSBook2023.Final_.pdf. {{cite web}}: Missing or empty |title= (help)
  18. ↑ "Gohar Mega-Module Direct Reduction Plant - Abtin Steel Technology Co". en.astec.ir. Archived from the original on 2025-03-18. Retrieved 2024-11-26.
  19. ↑ https://mmte.ir/?portfolio=oil-pipeline-project. {{cite web}}: Missing or empty |title= (help)
  20. ↑ https://www.aryahadeed.com/fa/%D9%BE%D8%B1%D9%88%DA%98%D9%87-%D9%87%D8%A7/%D9%BE%D8%B1%D9%88%DA%98%D9%87-%D8%A7%D8%AD%D8%AF%D8%A7%D8%AB-%DA%A9%D8%A7%D8%B1%D8%AE%D8%A7%D9%86%D9%87-%D8%A7%D8%AD%DB%8C%D8%A7%D8%A1-%D9%85%D8%B3%D8%AA%D9%82%DB%8C%D9%85-%D9%85%DA%AF%D8%A7%D9%85%D8%AF%D9%88%D9%84-%DA%A9%D9%88%D8%AB%D8%B1/. {{cite web}}: Missing or empty |title= (help)
  21. ↑ https://web.archive.org/web/20230322040138/https://www.en.eghtesadonline.com/Section-economy-4/31589-iran-steel-production-capacity-expansion-on-right-track. {{cite web}}: Missing or empty |title= (help)
  22. ↑ https://aryahadeed.com/fa/%D9%BE%D8%B1%D9%88%DA%98%D9%87-%D9%87%D8%A7/%D9%BE%D8%B1%D9%88%DA%98%D9%87-%D8%A7%D8%AD%DB%8C%D8%A7-%D9%85%D8%B3%D8%AA%D9%82%DB%8C%D9%85-%D9%85%DA%AF%D8%A7%D9%85%D8%AF%D9%88%D9%84-%D8%B7%D9%88%D8%A8%DB%8C/. {{cite web}}: Missing or empty |title= (help)
  23. ↑ https://web.archive.org/web/20240125004918/https://gisdco.com/%D9%85%D8%B9%D8%B1%D9%81%DB%8C/. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  24. ↑ 24.0 24.1 24.2 24.3 https://gisdco.com/%D9%85%D8%AF%DB%8C%D8%B1%DB%8C%D8%AA-%D8%AA%DA%A9%D9%86%D9%88%D9%84%D9%88%DA%98%DB%8C/. {{cite web}}: Missing or empty |title= (help)
  25. ↑ 25.0 25.1 25.2 25.3 25.4 25.5 25.6 25.7 25.8 https://web.archive.org/web/20230904145001/https://gisdco.com/en/introduction/. Archived from the original on 2023-09-04. {{cite web}}: Missing or empty |title= (help)

Resources