Golgohar Iron and Steel Company Kerman
| This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
Golgohar Iron and Steel Company Kerman (شرکت توسعه آهن و فولاد گل گهر), also known as Gol Gohar Steelmaking Complex, Golgohar Iron and Steel Development Company, GISCO, GISDCO, is a steel plant in Sirjan, Kerman, Iran that operates electric arc furnace (EAF) and direct reduced iron (DRI) technology.
Location
The map below shows the exact location of the plant in Sirjan, Kerman, Iran:
- Location: Sirjan, Kerman Province, Iran
- Coordinates (WGS 84): 29.134614, 55.360773 (exact)
Background
Since it opened in 2015, the Gol Gohar Iron and Steel plant has taken iron from the Gol Gohar mines and processed it into Direct Reduced Iron (DRI) and crude steel. The plant includes three DRI units with a total capacity of 5.55 million tons per year, making this one of the largest DRI plants in Iran and in the world.[1] It also includes two Electric Arc Furnace (EAF) units, with 3.3 million tons per year in steelmaking capacity.[2]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Start date | Workforce size | Power source | Iron ore source |
|---|---|---|---|
| 2015[3][4] | 3000[5] | Hadid Power Post (1000 MWA)[4] | Gol Gohar Mine (P100000128556)[6][7] |
Table 2: Ownership and Parent Company Information
| State-owned entity status | Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|---|
| Partial | Golgohar Mining and Industrial Co [35.0%]; Golgohar Investment and Development Co [15.0%]; National bank employees' pension fund [10.0%]; small shareholder(s) [6.1%]; Social Insurance Fund of Farmers and Villagers [1.9%]; Retirement, Pension and Disability Fund of Banks [1.7%]; Sadr Tamin Investment Co [0.8%]; Iranian Mines & Mining Industries Development & Renovation Organization [0.8%]; Justice Shares Broker Co [0.6%]; Mobarakeh Steel Co [0.6%]; Rafeh Capital Development Co [0.5%]; Ghadir Industrial and Mining Development International Co; Ghadir Investment Company PJSC; Iron Alloy Steel Co; Mines & Metals Development Investment Co; Provincial Investment Co; Sepah Bank; Shahrood Steel Co | 5058647259 [35.0%]; unknown [15.0%]; unknown [10.0%]; not applicable [6.1%]; unknown [1.9%]; unknown [1.7%]; 5074708740 [0.8%]; 5000935267 [0.8%]; unknown [0.6%]; 5001102887 [0.6%]; unknown [0.5%]; unknown; 5035729783; unknown; unknown; unknown; 5000066848; unknown | E100000000544 [35.0%]; E100002021998 [15.0%]; E100002022001 [10.0%]; E100001015587 [6.1%]; E100002022014 [1.9%]; E100002022015 [1.7%]; E100001011683 [0.8%]; E100000000547 [0.8%]; E100002011231 [0.6%]; E100000001959 [0.6%]; E100002026856 [0.5%]; E100002022013; E100000000543; E100002022012; E100001011682; E100001011239; E100002011718; E100001016092 | Golgohar Iron and Steel Development Co [100%][4] | 5083506527 | E100001000427 [100%] |
Table 3: Process and Products
| Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Responsible steel | Main production equipment |
|---|---|---|---|---|---|---|
| crude, semi-finished, finished rolled[8][4] | slab, hot rolled coil, DRI, cold DRI, hot DRI[5][4] | unknown | yes[9] | yes[9] | unknown | DRI; EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|
| operating | 3300[10][11][12] | 3300[10][11][12] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Sponge iron/DRI capacity | Nominal iron capacity (total) |
|---|---|---|
| operating | 5550[13][9][3][14] | 5550[13][9][3][14] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
| Sinter | Pellets |
|---|---|
| NF | 5000[15] |
Table 7: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
| Year | DRI production | Other/unknown iron production | Total (all routes) |
|---|---|---|---|
| 2019 | unknown | unknown | – |
| 2020 | unknown | unknown | – |
| 2021 | 2876[16] | –[16] | 2876[16] |
| 2022 | unknown | unknown | – |
| 2023 | unknown | unknown | – |
| 2024 | unknown | unknown | – |
Unit Details
Table 8: Direct Reduced Iron Furnace Details
| Unit name | Status | Construction date | Start date | Furnace manufacturer and model | Furnace type | Current capacity (ttpa) |
|---|---|---|---|---|---|---|
| DRI 1 Gohar | operating[14] | – | 2015[17] | MMTE Midrex[18][19][17] | shaft furnace[17] | 1700[14][13] |
| DRI 2 Kausar | operating[14] | – | 2018[17] | MMTE, Arya Hadid Midrex[20][17] | shaft furnace[17] | 2000[3][13] |
| DRI 3 Touba | operating[21] | 2019[4] | 2024[4] | MMTE, Arya Hadeed Midrex[22][4] | shaft furnace[23] | 1850[9] |
Table 9: Direct Reduced Iron Furnace Reductant Details
| Unit name | Current or initial reductant | Gas reductant |
|---|---|---|
| DRI 1 Gohar | gas[24] | syngas (reformed methane)[24] |
| DRI 2 Kausar | gas[24] | syngas (reformed methane)[24] |
| DRI 3 Touba | gas | gas (unknown type) |
Table 10: Electric Arc Furnace Details
| Unit name | Status | Start date | Furnace manufacturer and model | Current capacity (ttpa) | Current size (tonnes) |
|---|---|---|---|---|---|
| unknown EAF (1) | operating[11] | 2023[11] | Fakoor Sanat, Saralle[11] | 1800[12][11] | 240.0[11] |
| unknown EAF (2) | operating[10] | 2024[10] | Fakoor Sanat[10] | 1500[12][10] | 200.0[10] |
Table 11: Electric Arc Furnace Feedstock Details
| Unit name | Scrap-based | % scrap | % DRI | % HBI | % sponge iron (unknown if DRI or HBI) | % basic/merchant pig iron | % granulated pig iron | % pig iron (unknown if basic/merchant or granulated) | % other iron |
|---|---|---|---|---|---|---|---|---|---|
| unknown EAF (1) | no[25] | 0[9][25] | 100.00[25] | 0[25] | >0[25] | 0[25] | 0[25] | 0[25] | 0[25] |
| unknown EAF (2) | no[9] | 0[9] | 100.00 | – | – | – | – | – | – |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "کارخانه ها و پروژه ها – شرکت توسعه آهن و فولاد گل گهر". gisdco.com. Retrieved 2025-12-03.
- ↑ "اولین قوس الکتریکى کوره ٢۴٠ تنى شرکت توسعه آهن و فولاد گلگهر توسط مهندسان فکور صنعت تهران اجرایی شد | ماین نیوز". www.akhbaremadan.ir. Retrieved 2025-12-03.
- ↑ 3.0 3.1 3.2 3.3 "2020 World Direct Reduction Statistics" (PDF). Midrex. 2021-09-14. Archived from the original (PDF) on 2021-11-29.
- ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 https://web.archive.org/web/20250213222450/https://gisdco.com/en/. Archived from the original on 2025-02-13.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 https://barsoo.com/en/project/golgohar-iron-and-steel-development/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.goharzamin.com/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.gem.wiki/Gol_Gohar_Mine.
{{cite web}}: Missing or empty|title=(help) - ↑ https://gisdco.com/%d9%85%d8%b9%d8%b1%d9%81%db%8c-%d8%b4%d8%b1%da%a9%d8%aa/.
{{cite web}}: Missing or empty|title=(help) - ↑ 9.0 9.1 9.2 9.3 9.4 9.5 9.6 9.7 https://gisdco.com/%d9%85%d8%b3%d8%a6%d9%88%d9%84%db%8c%d8%aa-%d9%87%d8%a7%db%8c-%d8%a7%d8%ac%d8%aa%d9%85%d8%a7%d8%b9%db%8c/.
{{cite web}}: Missing or empty|title=(help) - ↑ 10.0 10.1 10.2 10.3 10.4 10.5 10.6 https://charkheghtesadnews.ir/%D9%85%D9%88%D9%81%D9%82%DB%8C%D8%AA-%D9%81%DA%A9%D9%88%D8%B1-%D8%B5%D9%86%D8%B9%D8%AA-%D8%AF%D8%B1-%D8%B1%D8%A7%D9%87-%D8%A7%D9%86%D8%AF%D8%A7%D8%B2%DB%8C-%D8%A7%D9%88%D9%84%DB%8C/.
{{cite web}}: Missing or empty|title=(help) - ↑ 11.0 11.1 11.2 11.3 11.4 11.5 11.6 https://www.akhbaremadan.ir/news/70007/%D8%A7%D9%88%D9%84%DB%8C%D9%86-%D9%82%D9%88%D8%B3-%D8%A7%D9%84%DA%A9%D8%AA%D8%B1%DB%8C%DA%A9%D9%89-%DA%A9%D9%88%D8%B1%D9%87-%D9%A2%DB%B4%D9%A0-%D8%AA%D9%86%D9%89-%D8%B4%D8%B1%DA%A9%D8%AA-%D8%AA%D9%88%D8%B3%D8%B9%D9%87-%D8%A2%D9%87%D9%86-%D9%81%D9%88%D9%84%D8%A7%D8%AF-%DA%AF%D9%84%DA%AF%D9%87%D8%B1-%D8%AA%D9%88%D8%B3%D8%B7-%D9%85%D9%87%D9%86%D8%AF%D8%B3%D8%A7%D9%86-%D9%81%DA%A9%D9%88%D8%B1-%D8%B5%D9%86%D8%B9%D8%AA-%D8%AA%D9%87%D8%B1%D8%A7%D9%86-%D8%A7%D8%AC%D8%B1%D8%A7%DB%8C%DB%8C.
{{cite web}}: Missing or empty|title=(help) - ↑ 12.0 12.1 12.2 12.3 (PDF) https://web.archive.org/web/20230410190908/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2022.pdf (PDF).
{{cite web}}: Check|archive-url=value (help); Missing or empty|title=(help) - ↑ 13.0 13.1 13.2 13.3 https://gisdco.com/%d9%be%d8%b1%d9%88%da%98%d9%87-%d9%87%d8%a7%db%8c-%d8%b4%d8%b1%da%a9%d8%aa/.
{{cite web}}: Missing or empty|title=(help) - ↑ 14.0 14.1 14.2 14.3 14.4 "2022 World Direct Reduction Statistics" (PDF). Midrex. 2023-09-12. Archived from the original (PDF) on 2023-11-03.
- ↑ "Gol-E-Gohar Pelletizing Plant II - KAYSON INC". KAYSON INC. Archived from the original on 2026-02-03. Retrieved 2025-01-23.
- ↑ 16.0 16.1 16.2 https://journal.issiran.com/article_702055.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 17.0 17.1 17.2 17.3 17.4 17.5 (PDF) https://www.midrex.com/wp-content/uploads/MidrexSTATSBook2023.Final_.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ "Gohar Mega-Module Direct Reduction Plant - Abtin Steel Technology Co". en.astec.ir. Archived from the original on 2025-03-18. Retrieved 2024-11-26.
- ↑ https://mmte.ir/?portfolio=oil-pipeline-project.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.aryahadeed.com/fa/%D9%BE%D8%B1%D9%88%DA%98%D9%87-%D9%87%D8%A7/%D9%BE%D8%B1%D9%88%DA%98%D9%87-%D8%A7%D8%AD%D8%AF%D8%A7%D8%AB-%DA%A9%D8%A7%D8%B1%D8%AE%D8%A7%D9%86%D9%87-%D8%A7%D8%AD%DB%8C%D8%A7%D8%A1-%D9%85%D8%B3%D8%AA%D9%82%DB%8C%D9%85-%D9%85%DA%AF%D8%A7%D9%85%D8%AF%D9%88%D9%84-%DA%A9%D9%88%D8%AB%D8%B1/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20230322040138/https://www.en.eghtesadonline.com/Section-economy-4/31589-iran-steel-production-capacity-expansion-on-right-track.
{{cite web}}: Missing or empty|title=(help) - ↑ https://aryahadeed.com/fa/%D9%BE%D8%B1%D9%88%DA%98%D9%87-%D9%87%D8%A7/%D9%BE%D8%B1%D9%88%DA%98%D9%87-%D8%A7%D8%AD%DB%8C%D8%A7-%D9%85%D8%B3%D8%AA%D9%82%DB%8C%D9%85-%D9%85%DA%AF%D8%A7%D9%85%D8%AF%D9%88%D9%84-%D8%B7%D9%88%D8%A8%DB%8C/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20240125004918/https://gisdco.com/%D9%85%D8%B9%D8%B1%D9%81%DB%8C/. Archived from the original on 2024-01-25.
{{cite web}}: Missing or empty|title=(help) - ↑ 24.0 24.1 24.2 24.3 https://gisdco.com/%D9%85%D8%AF%DB%8C%D8%B1%DB%8C%D8%AA-%D8%AA%DA%A9%D9%86%D9%88%D9%84%D9%88%DA%98%DB%8C/.
{{cite web}}: Missing or empty|title=(help) - ↑ 25.0 25.1 25.2 25.3 25.4 25.5 25.6 25.7 25.8 https://web.archive.org/web/20230904145001/https://gisdco.com/en/introduction/. Archived from the original on 2023-09-04.
{{cite web}}: Missing or empty|title=(help)
