Gondkhari Coal Mine

From Global Energy Monitor
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

Gondkhari Coal Mine is a proposed coal mine in Gondkhairi, Nagpur, Maharashtra, India.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Gondkhari Coal Mine Gondkhairi, Nagpur, Maharashtra, India 21.180922, 78.912583 (approximate)

The map below shows the approximate location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Project Type Opening Year Closing Year
Proposed[1] Construction[2] New 2027 (planned)[3] –

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
0.9 – – Underground[4] – 9.77[4] 300* –

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
41.747[4] – 98.71[4] Kamptee Subbituminous Thermal –

Table 5: Ownership and parent company

Note: To access more comprehensive data on energy ownership, please visit the Global Energy Ownership Tracker.
Owner Parent Company Headquarters
Adani Power Maharashtra Ltd [100.0%][5] Adani Group India

Note: The above sections were automatically generated and are based on data from the Global Coal Mine Tracker August 2026 release.

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background on Mine

Gondhkari Underground Coal Mining Project began as an Underground Coal Mine of the capacity 1 MTPA proposed by M/s Gondhkari Coal Mining Ltd., in Kamptee coalfields, district Nagpur, Maharashtra. The Terms of Reference (ToR) for the proposed project were granted by the Ministry of Environment and Forest (MoEF) on 23rd September 2010. [6].

The mine was inially allotted to Gondhkhari coal mining limited a joint venture of three companies, namely, M/s Maharastra Seamless Ltd, M/s Dhariwal Infrastructure Pvt Ltd and M/s Kesoram Industries Ltd. However, due to non-development of mine the coal block was deallocated and then listed for auction again in January 2020 by Ministry of Coal.[7].

The mine was allowed to Adani Power Maharashtra Limited

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. ↑ https://www.adaniwatch.org/setback_for_adani_s_gondkhairi_coal_project_due_to_public_outcry. {{cite web}}: Missing or empty |title= (help)
  2. ↑ (PDF) https://coal.gov.in/sites/default/files/2023-06/opt/MoM25-11-2024a.pdf. {{cite web}}: Missing or empty |title= (help)
  3. ↑ (PDF) https://coal.gov.in/sites/default/files/2023-06/MoM-09042025.pdf. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.0 4.1 4.2 4.3 (PDF) https://www.mstcecommerce.com/auctionhome/coalblock/RenderFileCoalBlock.jsp?file=I-131_Gondkhari_coal_block_Mine_Summary.pdf. {{cite web}}: Missing or empty |title= (help)
  5. ↑ https://timesofindia.indiatimes.com/city/nagpur/amid-outcry-public-hearing-on-gondkhairi-coal-mine-next-month/articleshow/101149040.cms?from=mdr. {{cite web}}: Missing or empty |title= (help)
  6. ↑ ToR for proposed 1 MTPA Gondhkari UG Coal Mine, India MoEF, 23rd September 2010
  7. ↑ Article in The Hitavada dated 20th January 2020