Binzhou Boxing power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Binzhou Boxing power station (国家能源集团博兴发电厂) is an operating power station of at least 2000-megawatts (MW) in Chunhua Town, Boxing, Binzhou, Shandong, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Binzhou Boxing power station | Chunhua Town, Boxing, Binzhou, Shandong, China | 37.27629, 118.330855 (exact)[1] |
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 37.27629, 118.330855
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| Phase I Unit 1 | Operating[2] | coal: unknown[3][4] | 1000[2] | ultra-supercritical[2] | 2024[2] | False |
| Phase I Unit 2 | Operating[5] | coal: unknown[3][4] | 1000[2] | ultra-supercritical[2] | 2024[5] | False |
| Phase II Unit 3 | Shelved[1] | coal: unknown[3][1] | 1000[1] | ultra-supercritical[1] | – | False |
| Phase II Unit 4 | Shelved[1] | coal: unknown[3][1] | 1000[1] | ultra-supercritical[1] | – | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase I Unit 1 | National Energy Boxing Power Generation Co Ltd [100%] | GD POWER Development Co Ltd [61.0%]; China Energy Investment Corp [17.0%]; Power Construction Corporation of China Ltd [8.0%]; Boxing County Investment and Financing Service Center [5.0%]; State Power Investment Corp Ltd [4.2%]; Shanghai Luyuan Investment Co Ltd [2.8%]; Shanghai Dingjing Investment Co Ltd [1.7%]; unknown [0.4%] |
| Phase I Unit 2 | National Energy Boxing Power Generation Co Ltd [100%] | GD POWER Development Co Ltd [61.0%]; China Energy Investment Corp [17.0%]; Power Construction Corporation of China Ltd [8.0%]; Boxing County Investment and Financing Service Center [5.0%]; State Power Investment Corp Ltd [4.2%]; Shanghai Luyuan Investment Co Ltd [2.8%]; Shanghai Dingjing Investment Co Ltd [1.7%]; unknown [0.4%] |
| Phase II Unit 3 | National Energy Boxing Power Generation Co Ltd [100%] | GD POWER Development Co Ltd [61.0%]; China Energy Investment Corp [17.0%]; Power Construction Corporation of China Ltd [8.0%]; Boxing County Investment and Financing Service Center [5.0%]; State Power Investment Corp Ltd [4.2%]; Shanghai Luyuan Investment Co Ltd [2.8%]; Shanghai Dingjing Investment Co Ltd [1.7%]; unknown [0.4%] |
| Phase II Unit 4 | National Energy Boxing Power Generation Co Ltd [100%] | GD POWER Development Co Ltd [61.0%]; China Energy Investment Corp [17.0%]; Power Construction Corporation of China Ltd [8.0%]; Boxing County Investment and Financing Service Center [5.0%]; State Power Investment Corp Ltd [4.2%]; Shanghai Luyuan Investment Co Ltd [2.8%]; Shanghai Dingjing Investment Co Ltd [1.7%]; unknown [0.4%] |
Project-level coal details
- Coal source(s): domestic
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Since 2006 China Guodian and partners have announced plans for a two-unit coal-fired power plant with a total planned capacity of 2,000 MW in Shandong Province,[6][7][8] which was still reported as active in 2012.[9]
An EIA was submitted in 2015.[10] The plant was permitted in December 2015. Operation is planned for 2019.[11] [12]
Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity
In January 2017 China's National Energy Administration suspended over 100 planned and under-construction coal power projects in 13 provinces, including Binzhou Boxing. It is unclear when or if the projects will be revived.[13]
For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.
2021: Project revived
In May 2021, the plant's construction was put up for bidding, indicating plans have been revived.[14] Construction was planned for 2021.[15]
Construction began in July 2022.[16]
As of March 2023, construction was expected to be complete in 2024.[17]
Phase I
In 2023, the project issued EPC tenders and began concrete pouring.[18] Cooling towers were completed in December 2023.[19]
On November 22, 2024, Phase I Unit 1 achieved first grid connection; On December 21, 2024, Unit 1 passed 168‑hour trial.[20][21]
Phase I Unit 2 completed its 168‑hour trial on 29 December 2024.[22]
Phase I Unit 2 completed boiler water pressure test in July 2024, first ignition in November 2024, and 168‑hour trial on 29 December 2024.[23][24]
Phase II
In May 2023, a 2 x 1,000 MW Phase II was announced at the Binzhou Boxing power station. The expansion was approved by the Shandong Provincial Development and Reform Commission first in December 2015 and again in May 2023.[25]
Phase II Unit 3 was on Shandong's key projects list in 2024[26]. In 2025–2026, no news or ground movement was found, and the project was shelved in June 2026[27].
Ownership
On August 28 2017, China's State-owned Assets Supervision and Administration Commission of the State Council (SASAC) announced that China Guodian Corporation and Shenhua Group will be jointly restructured. Shenhua Group will become China National Energy Investment Group and will absorb China Guodian Corporation. It will be the largest power company in the world by installed capacity, as well as the world's largest coal producer.[28][29] The merger was completed on November 28, 2017.[30]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 "国能博兴公司二期2×1000兆瓦燃煤发电机组扩建工程获得核准-北极星火力发电网". news.bjx.com.cn. 2023-05-18. Archived from the original on 2024-01-25. Retrieved 2023-11-27.
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 "国能博兴一期2×1000MW新建工程1号机组通过168小时满负荷试运-北极星火力发电网". news.bjx.com.cn. 2024-12-24. Archived from the original on 2025-04-21. Retrieved 2025-01-08.
- ↑ 3.0 3.1 3.2 3.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 https://news.bjx.com.cn/html/20210412/1146636.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 "国能博兴一期2×1000兆瓦新建工程2号机组通过168小时满负荷试运行-北极星火力发电网". news.bjx.com.cn. 2024-12-30. Archived from the original on 2025-04-21. Retrieved 2025-01-08.
- ↑ “关于国电博兴电厂一期2×1000兆瓦超超临界机组工程环境影响报告书的批复,” 中华人民共和国环境保护部, 2006-09-20
- ↑ “国电博兴电厂2×1000MW工程初步设计预审查会议召开,” accessed September 2014
- ↑ “公司2012年十件大事,” 中国国电山东电力有限公司, accessed September 2014
- ↑ “国电博兴电厂项目突破建设瓶颈,” 北极星电力网, 2012-08-14
- ↑ "国电博兴电厂一期(2×1000MW)机组工程环境影响评价第一次信息公示," 2015-05-14
- ↑ "国电集团在鲁首个百万千瓦机组项目获核准," 中国国电集团公司, 2015-12-23
- ↑ "山东滨州市博兴县国电博兴电厂区域考古发掘工作全面完成"齐鲁网 2016-07-12
- ↑ "能源局下发13省市新建火电机组停建清单(附文件)," Polaris, Jan 16, 2017
- ↑ "博兴发电公司2×1000MW新建工程2项招标中标候选人公示," 北极星电力网新闻中心, 2021/5/19
- ↑ "国家能源集团博兴发电2×1000MW工程计划6月30日开工," BJX, 2021-04-12
- ↑ "国家能源博兴发电有限公司 2×1000兆瓦新建工程项目正式开工," Power In-En, 2022-07-18
- ↑ "https://www.prcvalve.com/PC/NewsDet-46235.html," prcvalve.com, 2023-03-01
- ↑ "国家能源集团山东博兴项目混凝土浇筑超10方". 北极星电力网. 2023-03-20. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "博兴项目1号、2号冷却塔外筒壁双到顶". 北极星电力网. 2023-12-04. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "博兴公司一期1号机组首次并网一次成功". 北极星电力网. 2024-11-25. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "博兴公司1号机组通过168小时试运". 微信公众号. 2025-01-08. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国家能源博兴公司2号机组顺利通过168小时试运行". 微信公众号. 2025-01-08. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国能博兴电厂2号机组汽轮机扣缸工作圆满完成". 微信公众号. 2024-07-28. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "博兴一期项目2号锅炉首次点火一次成功". 北极星电力网. 2024-11-15. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国能博兴公司二期2×1000兆瓦燃煤发电机组扩建工程获得核准," news.bjx, 2023-05-18
- ↑ "山东2024年重点项目名单". 北极星电力网. 2024-01-16. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "博兴电厂二期项目搁置". 北极星电力网. 2026-06-18. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Factbox: Shenhua and Guodian - China's latest state marriage". Reuters. 29 August 2017. Retrieved 30 August 2017.
- ↑ "China Is Creating the World's Largest Power Company". Bloomberg News. 28 August 2017. Retrieved 29 August 2017.
- ↑ "China’s Newly-Established National Energy Investment Group Sets World Records in Its Sector, With Assets of Over CNY1.8 Trillion," Yicai Global, 11-28-2017
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.