Guodian Zhunger Changtan power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Guodian Zhunger Changtan power station (国电建投内蒙古能源公司长滩发电厂) is an operating power station of at least 1320-megawatts (MW) in Changtan, Junggar, Ordos, Inner Mongolia, China. It is also known as 建投准能公司.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Guodian Zhunger Changtan power station Changtan, Junggar, Ordos, Inner Mongolia, China 39.544153, 111.363209 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1: 39.544153, 111.363209
  • Unit 2: 39.542966, 111.362297

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Unit 1 Operating coal: unknown 660 ultra-supercritical 2023
Unit 2 Operating[1] coal: unknown 660[1] ultra-supercritical[1] 2023

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Guodian & Jiantou Inner Mongolia Energy Investment Co Ltd [100%] GD POWER Development Co Ltd [50.0%]; Hebei Construction & Investment Group Co Ltd [50.0%]
Unit 2 Guodian & Jiantou Inner Mongolia Energy Investment Co Ltd [100%] GD POWER Development Co Ltd [50.0%]; Hebei Construction & Investment Group Co Ltd [50.0%]

Background on Project

Hebei Construction & Investment Group and China Guodian (now National Energy Investment Group) have proposed a coal-fired power plant with a total planned capacity of 1,320 MW in Inner Mongolia Autonomous Region. China Guodian said it eventually plans to expand the power station to a total of 3,960 MW.[2] Its EIA report received approval from then National Environmental Protection General Bureau in 2007.[3] Due to not beginning construction within 5 years, the project applied environment clearance again and received EIA approval again in November 2018[4]. The proposal began feasibility study in 2013.[2][5]

The plant was permitted for construction in April 2018 as a "supporting power project for the Mengxi-Tianjin Nantu high-voltage transmission channel".[6]

A ceremony for the construction-begin was held in October 2019.[7] However, the actual construction only began in April 2021.[8]

On 28 July 2023, Unit 1 successfully passed 168 hours test run and entered commercial operation.[9][10]

Articles and Resources

References

  1. 1.0 1.1 1.2 "建投准能2×660MW机组工程竣工投产-北极星火力发电网". news.bjx.com.cn. 2023-11-08. Archived from the original on 2024-01-25. Retrieved 2023-11-08.
  2. 2.0 2.1 "国电建投长滩一期项目可研报告通过评审," China Guodian Corporation press release, 2013/11/27
  3. "国电建投内蒙古能源有限公司长滩电厂2×66 万千瓦机组工程环境影响报告书" (PDF). Inner Mongolia Ecology and Environment Bureau. 2018-11-01.{{cite web}}: CS1 maint: url-status (link)
  4. "内蒙古自治区环境保护厅关于国电建投内蒙古能源有限公司长滩电厂2×66万千瓦机组工程环境影响评价文件受理情况的公示". Inner Mongolia Ecology and Environmental Protection Bureau. 2018-11-20. Retrieved 2021-06-04.{{cite web}}: CS1 maint: url-status (link)
  5. "李忠军会见准格尔旗政府领导," 晶阳公司, 2015-05-22
  6. "国电建投内蒙古能源有限公司长滩电厂2×66万千瓦机组工程获自治区发改委核准," 鄂尔多斯市发展和改革委员会, 2018-04-19
  7. "长滩电厂2×660MW机组项目正式开工!," 北极星电力网新闻中心 来源:准格尔旗融媒体中心 2019/10/21
  8. "内蒙古长滩电厂2台66万千瓦超超临界燃煤机组工程开工-国际煤炭网". coal.in-en.com. 2021-04-09. Retrieved 2021-06-04.{{cite web}}: CS1 maint: url-status (link)
  9. "66万!内蒙古又一台大型煤电机组投产!". 北极星电力网. 2023-07-31. Retrieved 2023-8-21. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  10. "建投准能2X660兆瓦燃煤机组工程1号机组一次性通过168小时试运行,实现高标准投产". 火电之声. 中能建建筑集团. Retrieved 2023-8-21. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.