Haiphong FSRU
| Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Haiphong FSRU is an in-construction LNG import terminal in Vietnam.
Location
Table 1: Location details
| Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Haiphong FSRU | Vietnam[1] | 20.831692, 106.684464 (approximate) |
The map below shows the approximate location of the terminal:
Project Details
Table 2: Infrastructure details
| Name | Facility type | Status | Capacity | Total terminal capacity | Offshore | Associated infrastructure |
|---|---|---|---|---|---|---|
| Haiphong FSRU | import[2] | construction[2] | – | – | True | Haiphong LNG power station[2] |
Table 3: Cost
| Name | Facility type | Cost | Total known terminal costs |
|---|---|---|---|
| Haiphong FSRU | import[2] | – | – |
Financing
No financing data available.
Table 4: Project timeline
| Name | Facility type | Status | Proposal year | FID year | Construction year | Operating year | Inactive year |
|---|---|---|---|---|---|---|---|
| Haiphong FSRU | import[2] | construction[2] | –[2] | – | 2025[2] | – | – |
Ownership
Table 5: Ownership
| Name | Facility type | Status | Owners | Parent companies | Operator |
|---|---|---|---|---|---|
| Haiphong FSRU | import[2] | construction[2] | VinEnergo JSC; Vingroup JSC[2][2] | VinEnergo JSC; Vingroup JSC | – |
Background
In September 2025, construction began on an industrial park with an LNG power plant, known as Haiphong LNG power station, and an import terminal consisting of a floating storage unit with a regasification system (FSRU). Total investment in the complex was estimated to be US$7.12 billion. The first phase of the power plant, with a capacity of 1600 MW, is planned to be operating no later than 2030, suggesting that the import terminal will be operating by that time.[3]
The project is being developed by Vingroup and VinEnergo Energy JSC.[3] It is distinct from the Cat Hai FSRU proposal, also known as Hai Phong FSRU, which had been under development by a consortium including Exxon Mobil and JERA and is inferred to be cancelled.
Vingroup and VinEnergo broke ground on the Hai Phong LNG power plant project on September 26, 2025, within the Tan Trao industrial park. The associated LNG import infrastructure is planned at the mouth of the Van Uc River, where water depth of -16 m would accommodate LNG carriers of 180,000 m3 or more, with one berth, one FSRU, and a pipeline to the 4,800 MW (2x phases) power plant, which is targeted to be operational by the end of 2030.[4][5][6]
Articles and Resources
Additional data
To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.
References
- ↑ https://www.google.com/maps/place/20%C2%B049'54.1%22N+106%C2%B041'04.1%22E/@20.831697,106.6818837,1156m/data=!3m2!1e3!4b1!4m4!3m3!8m2!3d20.831692!4d106.684464?entry=ttu&g_ep=EgoyMDI1MTAwOC4wIKXMDSoASAFQAw%3D%3D.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 https://vir.com.vn/haiphong-breaks-ground-on-landmark-industrial-park-and-lng-power-plant-137477.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 "Haiphong breaks ground on landmark industrial park and LNG power plant". vir.com.vn. Retrieved 2025-10-10.
- ↑ "https://lngprime.com/lng-terminals/vietnams-vingroup-kicks-off-work-on-lng-power-plant/164546/".
{{cite web}}: External link in(help)CS1 maint: url-status (link)|title= - ↑ "Construction on $7.7 bln LNG power plant project in northern Vietnam to begin this month". theinvestor.vn. Retrieved 2026-07-08.
- ↑ "Vingroup breaks ground on Tân Trào IP and Hải Phòng LNG plant". vietnamnews.vn. Retrieved 2026-07-08.