Halyvourgiki Eleusis steel plant is a steel plant in Eleusis, Attikí, Greece that operates electric arc furnace (EAF), basic oxygen furnace (BOF), and blast furnace (BF) technology.
Location
The map below shows the exact location of the plant in Eleusis, Attikí, Greece:
Location: 20 km Athens, Korinthos National Road, 19200, Elefsina, Greece
Coordinates (WGS 84 ): 38.043873, 23.508083 (exact)
Background
This steel plant was idled in 2015 and closed in 2018.[ 1]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker , a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
Table 2: Ownership and Parent Company Information
Parent company
Parent company PermID
Parent GEM entity ID
Owner
Owner company PermID
Owner GEM entity ID
Halyvourgiki SA [100.0%]
4296662145 [100.0%]
E100000130787 [100.0%]
Halyvourgiki SA [100%][ 6]
4296662145
E100000130787 [100%]
Table 3: Process and Products
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
1 Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1
Basic oxygen furnace steelmaking capacity
Electric arc furnace steelmaking capacity
Nominal crude steel capacity (total)
retired
400[ 7]
800[ 3]
1200[ 7] [ 3]
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
1 Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1
Blast furnace capacity
Nominal iron capacity (total)
retired
2500[ 8] [ 9]
2500[ 8] [ 9]
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Ferronickel
Sinter
Coke
Pellets
NF
NF
NF
NF
Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year
BOF production
EAF production
Other/unknown steel production
2022
–
unknown
unknown
2023
unknown
unknown
unknown
Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
Year
BF production
Other/unknown iron production
2022
unknown
unknown
2023
unknown
unknown
Unit Details
Table 9: Blast Furnace Details
Unit name
Status
Start date
Retired date
Current capacity (ttpa)
Decarbonization technology
unknown BF (1)
retired[ 10] [ 2]
1963[ 9]
2023[ 10] [ 2]
400[ 8]
unknown
unknown BF (2)
retired[ 10] [ 2]
1975[ 9]
2023[ 4]
2100[ 9]
unknown
Table 10: Electric Arc Furnace Details
Unit name
Status
Current capacity (ttpa)
unknown EAF (1)
retired[ 4]
800[ 3]
Table 11: Electric Arc Furnace Feedstock Details
Unit name
Scrap-based
% scrap
unknown EAF (1)
yes[ 11]
100.00[ 11]
Table 12: Basic Oxygen Furnace Details
Unit name
Status
Current capacity (ttpa)
unknown BOF (1)
retired[ 4]
400[ 7]
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
Resources