Henan Angang Zhoukou Iron and Steel Co Ltd (河南安钢周口钢铁有限责任公司) is a steel plant in Zhoukou, Henan, China that operates electric arc furnace (EAF), basic oxygen furnace (BOF), and blast furnace (BF) technology.
The company plans to build in stages: one 1860m³ blast furnace, one 155-ton converter[1], one 100-ton electric arc furnace, one 2000m³ blast furnace, and supporting facilities. The planned total production capacity is 10 million tons of steel per year, with construction divided into two phases and three stages. On May 18, 2021, with the successful ignition of the No. 1 blast furnace in the first phase of the Zhoukou capacity replacement project of Anyang Iron and Steel, the 1860m³ blast furnace entered the stage of full production.[2]
The steelmaking project was successfully put into operation on June 25, 2021.[3]
According to the Capacity Transfer Public Notice issued by the Anyang Municipal Bureau of Industry and Information Technology on November 3, 2023, the company will acquire 1.3 million tons of capacity from Anyang Iron & Steel Co., Ltd. and construct a 160-ton electric arc furnace.[4]
Anyang Iron & Steel Co Ltd [76.9%]; Zhoukou Investment Group Co Ltd [9.1%]; Henan Agric. Synthesis Exploitation Co Ltd [4.6%]; unknown [4.4%]; Sanmenxia Investment Group Co Ltd [2.4%]; Kaifeng Construction Lnvestment Co Ltd [1.2%]; Xinxiang Muye Development Management Co Ltd [0.9%]; Hoyer GmbH [0.2%]; China Logistics Group Co Ltd [0.1%]; Beijing Guanglong Enterprise Management Consulting Center LP [0.1%]; Guangxi Yingtongtong Investment Co Ltd [0.1%]; Huludao Hongyun Group Co Ltd [0.0%]; Sichuan Development Holding Co Ltd [0.0%]; Wuhan Industrial Investment Holding Group Co Ltd [0.0%]; Shihezi Shangde Equity Investment Partnership LP [0.0%]
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.