Huangnanzhou Gas Pipeline Phase I (Lajishan-Jianzha)

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Huangnanzhou Gas Pipeline Phase I (Lajishan-Jianzha) 黄南州天然气利用项目管道输气一期工程(拉脊山-尖扎) is a construction gas pipeline in Qinghai province, China.[1]

Location

The trunl pipeline runs from the Lajishan distribution station of the Sebei-Xining-Lanzhou Gas Pipeline to the Jianzhatan Pipe Cleaning Station in Jianzha County, passing through Guide County, Hainan Prefecture; the two branch lines start from the Jianzhatan Pipe Cleaning Station in Jianzha County, ending at Jianzhamen Station in Maketang Town, Jianzha County and Tongrenmen Station in Nianduhu Township, Tongren City.[1]

Loading map...

Project details

  • Operator:
  • Owner: Qinghai Heze Gas Co., Ltd.[2]
  • Parent company:
  • Capacity: 0.135 bcm/y[1]
  • Length: 175.58 km (101.02 km of the trunk line; 74.56 km of the two branches line)[1]
  • Diameter:
  • Status: Construction[1]
  • Start year:
  • Cost:
  • Financing:
  • Associated infrastructure: Sebei-Xining-Lanzhou Gas Pipeline[1]

Background

The pipeline will end the history of Huangnan Prefecture without a natural gas pipeline network and benefit 100,000 people in Tongren City and Jianzha County.[1]

Articles and resources

References