Hybar Arkansas steel plant
From Global Energy Monitor
| This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
Hybar Arkansas steel plant, also known as Highbar Osceola, is a steel plant in Osceola, Arkansas, United States that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Osceola, Arkansas, United States:
- Location: 1 Green Way, Osceola, AR 72370
- Coordinates (WGS 84): 35.686814, -89.961981 (exact)
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Announced date | Construction date | Start date | Workforce size | Power source |
|---|---|---|---|---|
| 2023-02[1] | 2023-08[2] | 2025-06[2][3] | 140[4] | Green & Clean Power LLC (GCP) will construct 105-megawatt solar installation and a 160 megawatt-hour battery energy storage system.[2][5] |
Table 2: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| Green & Clean Holdings LLC [100.0%] | unknown [100.0%] | E100001012114 [100.0%] | Hybar LLC [100%][6] | 5086714348 | E100001012112 [100%] |
Table 3: Process and Products
| Steel product category | Steel products | Main production equipment |
|---|---|---|
| finished rolled[1] | rebar[1] | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|
| operating | 544[1][2] | 544[1][2] |
Unit Details
Table 5: Electric Arc Furnace Details
| Unit name | Status | Construction date | Start date | Furnace manufacturer and model | Current capacity (ttpa) | Current size (tonnes) |
|---|---|---|---|---|---|---|
| unknown EAF (1) | operating[3] | 2023[1] | 2025[3][7] | SMS Group[1] | 544[2][1] | 105.0[8] |
Table 6: Electric Arc Furnace Feedstock Details
| Unit name | Scrap-based | % scrap | % DRI | % HBI | % sponge iron (unknown if DRI or HBI) | % basic/merchant pig iron | % granulated pig iron | % pig iron (unknown if basic/merchant or granulated) | % other iron |
|---|---|---|---|---|---|---|---|---|---|
| unknown EAF (1) | yes[9] | 100.00[9] | unknown | unknown | unknown | unknown | unknown | unknown | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://web.archive.org/web/20240119034902/https://www.sms-group.com/en-jp/press-and-media/press-releases/press-release-detail/highbar-llc-demonstrates-its-trusts-in-the-expertise-of-sms-group. Archived from the original on 2024-01-19.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20241005092502/https://www.aist.org/404. Archived from the original on 2024-10-05.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 https://web.archive.org/web/20250627233119/https://www.aist.org/hybar-celebrates-first-steel-rebar-production. Archived from the original on 2025-06-27.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20231202033856/https://www.arkansasedc.com/news-events/newsroom/detail/2023/08/02/hybar-begins-construction-on-steel-rebar-mill-in-northeast-arkansas-to-create-200-high-paying-jobs. Archived from the original on 2023-12-02.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20231014052248/https://www.climatebonds.net/2023/09/sustainable-steel-hybar-historic-certification. Archived from the original on 2023-10-14.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20240912183548/https://www.globalprincipal.com/hybar. Archived from the original on 2024-09-12.
{{cite web}}: Missing or empty|title=(help) - ↑ www.recyclingtoday.com https://web.archive.org/web/20260204170743/https://www.recyclingtoday.com/news/hybar-gcp-steel-mill-solar-installation-recycling-arkansas-funding/. Archived from the original on 2026-02-04. Retrieved 2025-01-27.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.steelorbis.com/steel-news/latest-news/us-based-hybar-llc-produces-first-rebar-at-new-mini-mill-1394429.htm.
{{cite web}}: Missing or empty|title=(help) - ↑ 9.0 9.1 https://web.archive.org/web/20240905173258/https://www.recyclingtoday.com/news/hybar-highbar-steel-arkansas-tpg-funding-scrap-recycling-arkansas/. Archived from the original on 2024-09-05.
{{cite web}}: Missing or empty|title=(help)
