JSW Bengal Steel Salboni plant is a steel plant in Salboni, Pashchim Medinipur, West Bengal, India that operates basic oxygen furnace (BOF) and blast furnace (BF) technology.

Location

The map below shows the approximate location of the plant in Salboni, Pashchim Medinipur, West Bengal, India:

Loading map...
  • Location: Salboni, West Bengal, India
  • Coordinates (WGS 84): 22.575726, 87.310258 (approximate)

Background

The JSW Steel Bengal steel plant was first proposed in 2007. JSW Steel planned to build the 10,000 ttpa plant and a nearby 1,600 MW captive power plant for a Rs 35,000 crore investment. It was delayed after disputes with the local government over the land acquisition (the plant would take 4,300 acres of land).[1]

In 2013, JSW Steel announced they would put the Bengal project on hold after they were unable to secure a long term iron ore supply agreement or a captive iron ore mine.[1]

In 2014, JSW Steel announced they had 'given up' on the project due to the above issues, as well as general concern over the financial viability of the plant.[2]

JSW owns a cement plant and a captive power plant at the site. In February 2023, JSW initiated the process to earmark a portion of the land to be returned to the Bengal state government after the government indicated its willingness to take it back.[3][4] As of September 2023, JSW Group plans to develop an industrial park at the land to attract domestic and international investors.[5][6] In September 2023, former Indian cricketer Sourav Ganguly announced his plans to set up an steel plant on the land given to JSW group.[7][8]

According to the company's FY25 annual report, the JSW Bengal Steel Salboni project was put on hold due to uncertainties in the availability of key raw materials such as iron ore and coal, after the cancellation of the allotted coal blocks.[9]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Plant Details

Table 1: General Plant Details

Start date Retired date
2036[10] 2021[11]

Table 2: Ownership and Parent Company Information

State-owned entity status Parent company Parent company PermID Parent GEM entity ID Owner Owner company PermID Owner GEM entity ID
Partial JSW Steel Ltd [98.8%]; unknown [1.2%] 4295872888 [98.8%]; not applicable [1.2%] E100001000516 [98.8%]; E100000132388 [1.2%] JSW Bengal Steel Ltd [100%][11] 5000592310 E100001000530 [100%]

Table 3: Process and Products

Main production equipment
BF; BOF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
cancelled 10000[11][12][13] 10000[11][12][13]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Blast furnace capacity Nominal iron capacity (total)
cancelled 0 0

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter Coke Pellets
NF NF NF

Unit Details

Table 7: Blast Furnace Details

Unit name Status Start date Retired date Current capacity (ttpa) Decarbonization technology
unknown BF (1) cancelled[14] 2036[10] 2021[11] 0 unknown

Table 8: Basic Oxygen Furnace Details

Unit name Status Current capacity (ttpa)
unknown BOF (1) cancelled[14] 10000[12][11][13]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 "JSW Steel puts Rs 35k crore West Bengal steel project on hold". The Hindu. PTI. 2013-04-28. ISSN 0971-751X. Retrieved 2022-02-26.{{cite news}}: CS1 maint: others (link)
  2. Basu, Manish (2014-12-01). "JSW gives up on steel, power plants in Bengal". mint. Retrieved 2022-02-26.
  3. "Jindals prepare to give up land in Salboni". www.telegraphindia.com. Retrieved 2023-12-13.
  4. "JSW Steel to return shelved plant land at Salboni to Bengal government, says Mamata Banerjee". www.telegraphindia.com. Retrieved 2023-12-13.
  5. "JSW Group to develop industrial park at Salboni to attract domestic, international investors". www.telegraphindia.com. Retrieved 2023-12-13.
  6. MP, Team (2023-10-13). "Cabinet approves setting up industrial park at Salboni". www.millenniumpost.in. Retrieved 2023-12-13.
  7. MP, Team (2023-09-16). "Sourav Ganguly to set up steel plant in Salboni". www.millenniumpost.in. Retrieved 2023-12-13.
  8. "Captain Steel to partner Sourav Ganguly's Salboni project". The Economic Times. 2023-09-16. ISSN 0013-0389. Retrieved 2023-12-13.
  9. "Annual Report FY24-25" (PDF). JSW Steel. 2025. Retrieved 2025-10-22.{{cite web}}: CS1 maint: url-status (link)
  10. 10.0 10.1 (PDF) https://web.archive.org/web/20230410190908/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2022.pdf (PDF). {{cite web}}: Check |archive-url= value (help); Missing or empty |title= (help)
  11. 11.0 11.1 11.2 11.3 11.4 11.5 (PDF) https://web.archive.org/web/20211004131951/https://www.jsw.in/sites/default/files/assets/downloads/steel/IR/Financial%20Performance/Annual%20Reports%20Steel/20-21/AR%202020-21.pdf. Archived from the original (PDF) on 2021-10-04. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 12.2 (PDF) https://web.archive.org/web/20210929032946/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2021.pdf (PDF). {{cite web}}: Check |archive-url= value (help); Missing or empty |title= (help)
  13. 13.0 13.1 13.2 (PDF) https://web.archive.org/web/20210807133859/http://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2020.pdf. Archived from the original (PDF) on 2021-08-07. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 (PDF) https://web.archive.org/web/20221030083808/https://www.jsw.in/sites/default/files/assets/industry/steel/IR/Financial%20Performance/Annual%20Reports%20_%20STEEL/JSW%20Steel%20Integrated%20Report%202021-22.pdf. Archived from the original (PDF) on 2022-10-30. {{cite web}}: Missing or empty |title= (help)

Resources