Jili Baikuang power station (广西百矿超元发电有限公司2×660MW清洁高效煤电项目, 吉利百矿集团有限公司清洁高效煤电项目, 百色2×660MW清洁高效煤电项目) is a permitted power station in Toutang Town, Tianyang, Baise, Guangxi, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Jili Baikuang power station Toutang Town, Tianyang, Baise, Guangxi, China 23.7861593, 106.8198335 (approximate)[1]
Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Unit 1 Permitted coal: unknown 660 ultra-supercritical 2025 (planned)
Unit 2 Permitted coal: unknown 660 ultra-supercritical 2025 (planned)

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Guangxi Baikuang Chaoyuan Power Generation Co Ltd [100%] Guangxi Baikuang Chaoyuan Power Generation Co Ltd [100.0%]
Unit 2 Guangxi Baikuang Chaoyuan Power Generation Co Ltd [100%] Guangxi Baikuang Chaoyuan Power Generation Co Ltd [100.0%]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

On August 3, 2022, the Development and Reform Commission of Guangxi Zhuang Autonomous Region issued an official document (桂发改电力〔2022〕829 号) regarding coal power projects for its provincial 14th Five-Year Plan for the energy sector. Baise Mining Group Co., Ltd.’s ‘suppress small to scale up big’ 2 x 660 MW coal power project is one of them. Guangxi Baikuang Chaoyuan Power Generation Co., Ltd. was set up to develop and run the construction and operation of the project.[2]

Echoing the National Development and Reform Commission's call that the new coal power adopts the principle of "establishing before reforming, ultra-supercritical, and not selecting new sites", Jili Baikuang power station was set to be built at the reserved expansion site of Baise Tianyang power station.[2]

The project was granted permission (桂发改电力〔2022〕1327号) to build on 28 December 2022 and it was also in 2023 Guangxi Energy Infrastructure Construction Work Plan. [3]

Articles and Resources

References

  1. "广西2×660MW清洁高效煤电项目开工". Weixin Official Accounts Platform. 2023-09-23. Archived from the original on 2024-01-25. Retrieved 2023-10-16.
  2. 2.0 2.1 "火电|总投资55.37亿元!!2×660MW!广西新增清洁高效煤电项目!". 能源电力新观察. 2023-06-25. Retrieved 2023-07-20.{{cite web}}: CS1 maint: url-status (link)
  3. 广西壮族自治区发展和改革委员会 (2023-04-03). "广西壮族自治区发展和改革委员会关于印发《广西能源基础设施建设2023年工作推进方案》的通知". 广西壮族自治区发展和改革委员会. Retrieved 2023-07-20.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.