KIC Metaliks Durgapur steel plant is a steel plant in Durgapur, Burdwan, West Bengal, India that operates blast furnace (BF), direct reduced iron (DRI), electric arc furnace (EAF), and induction furnace (IF) technology.

Location

The map below shows the exact location of the plant in Durgapur, Burdwan, West Bengal, India:

Loading map...
  • Location: Raturia Industrial Area
  • Coordinates (WGS 84): 23.507539, 87.277914 (exact)

Background

KIC Metaliks Ltd. was incorporated on 26th August 1986 and commissioned its  pig iron unit in Raturia Industrial area in February 1998 by setting up one Mini Blast Furnace of volume 215 m3 with production capacity of 109 ttpa.[1] The mini blast furnace has subsequently upgraded to a capacity of 235 ttpa.[2]

KIC Metaliks proposed to expand its pig iron plant to 598 ttpa integrated steel plant by introducing DRI kilns, electric arc furnace and induction furnaces.[3] As of October 2025, there has been no update on the expansion project.

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Plant Details

Table 1: General Plant Details

Start date Workforce size Power source Iron ore source Coal source
1998-02[4] 421[5] 4.7 MW WHRB CPP[6] unknown unknown

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent GEM entity ID Owner Owner company PermID Owner GEM entity ID
KIC Metaliks Ltd [100.0%] 4295873610 [100.0%] E100002007981 [100.0%] KIC Metaliks Ltd [100%][4] 4295873610 E100002007981 [100%]

Table 3: Process and Products

Main production equipment
BF; DRI; IF; EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Induction furnace steelmaking capacity Nominal crude steel capacity (total)
announced 192[7] 406[7][4] 598[7][4]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Blast furnace capacity Sponge iron/DRI capacity Nominal iron capacity (total)
announced 224[7] 224[7]
operating 235[8] 235[8]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter
360[9]

Table 7: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)

Year BF production Total (all routes)
2019 152[5] 152[5]
2020 175[5] 175[5]
2021 116[5] 116[5]
2022 161[5] 161[5]
2023 212[10] 212[10]
2024 172[11] 172[11]

Unit Details

Table 8: Blast Furnace Details

Unit name Status Start date Furnace manufacturer and model Current size Current capacity (ttpa) Decarbonization technology Most recent relining
unknown BF (1) operating[5] 1998[5] MECON[12] 245.0[4] 235[8] Pulverized Coal Injection[13] 2020[14]

Table 9: Direct Reduced Iron Furnace Details

Unit name Status Announced date Furnace type Current capacity (ttpa)
unknown DRI (1) announced[4] 2016[15] rotary kiln[4] 112[7]
unknown DRI (2) announced[4] 2016[15] rotary kiln[4] 112[7]

Table 10: Direct Reduced Iron Furnace Reductant Details

Unit name Current or initial reductant
unknown DRI (1) coal (solid)[4]
unknown DRI (2) coal (solid)[4]

Table 11: Electric Arc Furnace Details

Unit name Status Announced date Current capacity (ttpa) Current size (tonnes)
unknown EAF (1) announced[7] 2016[15] 192[7] 30.0[7]

Table 12: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap
unknown EAF (1) yes[7] >0[7]

Table 13: Induction Furnace Details

Unit name Status Announced date Current capacity (ttpa) Current size
unknown IF (1) announced[4] 2016[15] 48[7] 15.0 tonnes[4]
unknown IF (2) announced[4] 2016[15] 48[7] 15.0 tonnes[4]
unknown IF (3) announced[4] 2016[15] 48[7] 15.0 tonnes[4]
unknown IF (4) announced[4] 2016[15] 48[7] 15.0 tonnes[4]
unknown IF (5) announced[4] 2016[15] 107[7][4] 20.0 tonnes[4]
unknown IF (6) announced[4] 2016[15] 107[7][4] 20.0 tonnes[4]

Table 14: Induction Furnace Feedstock Details

Unit name Scrap-based
unknown IF (1) None
unknown IF (2) None
unknown IF (3) None
unknown IF (4) None
unknown IF (5) None
unknown IF (6) None

Articles and Resources

Additional data

To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "Summary of M/s K I C Metaliks proposed expansion project" (PDF). environmentclearance.nic.in. 2016-12-09. Retrieved 2025-10-29.{{cite web}}: CS1 maint: url-status (link)
  2. "About KIC Metaliks - KIC Metaliks Ltd". www.kicmetaliks.com. Retrieved 2025-10-29.
  3. "EXECUTIVE SUMMARY of EIA/EMP REPORT" (PDF). WB PCB. Retrieved 2025-10-29.{{cite web}}: CS1 maint: url-status (link)
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19 4.20 4.21 4.22 4.23 4.24 (PDF) https://www.wbpcb.gov.in/writereaddata/files/EXECUTIVE%20SUMMARY-ENGLISH_1.pdf. {{cite web}}: Missing or empty |title= (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 (PDF) https://www.kicmetaliks.com/wp-content/uploads/2023/10/KIC-ANNUAL-REPORT-2022-23.pdf. {{cite web}}: Missing or empty |title= (help)
  6. https://www.kicmetaliks.com/facilities/captive-power-plant/. {{cite web}}: Missing or empty |title= (help)
  7. 7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 7.10 7.11 7.12 7.13 7.14 7.15 7.16 7.17 (PDF) https://environmentclearance.nic.in/writereaddata/online/RiskAssessment/25092018QCZWHCI4RD.pdf. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 https://www.kicmetaliks.com/about-kic-metaliks/. {{cite web}}: Missing or empty |title= (help)
  9. https://www.kicmetaliks.com/facilities/sinter-plant/. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 (PDF) https://www.kicmetaliks.com/wp-content/uploads/2024/07/Annual-Report_2024.pdf. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 (PDF) https://www.kicmetaliks.com/wp-content/uploads/2025/07/Annual-Report_2025.pdf. {{cite web}}: Missing or empty |title= (help)
  12. https://www.kicmetaliks.com/facilities/mini-blast-furnace/. {{cite web}}: Missing or empty |title= (help)
  13. https://www.kicmetaliks.com/facilities/others/. {{cite web}}: Missing or empty |title= (help)
  14. (PDF) https://www.kicmetaliks.com/wp-content/uploads/2023/10/KIC-ANNUAL-REPORT-2022-23.pdf https://www.business-standard.com/article/news-cm/board-of-kic-metaliks-approves-expansion-and-modernisation-of-pig-iron-plant-117120800944_1.html, https://www.kicmetaliks.com/wp-content/uploads/2023/10/KIC-ANNUAL-REPORT-2022-23.pdf. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  15. 15.0 15.1 15.2 15.3 15.4 15.5 15.6 15.7 15.8 (PDF) https://environmentclearance.nic.in/writereaddata/Online/TOR/09_Dec_2016_135819110R3TXKG2Lprojectsummary.pdf. {{cite web}}: Missing or empty |title= (help)

Resources