KSRM Sitakunda steel plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

KSRM Sitakunda steel plant, also known as Kabir Steel Rolling Mills, is a steel plant in Sitakunda, Chittagong, Bangladesh that operates electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Sitakunda, Chittagong, Bangladesh:

Loading map...
  • Location: Ghoramora, Bara Kumira, Sitakunda, Chittagong, Bangladesh
  • Coordinates (WGS 84): 22.499834, 91.715778 (exact)

Background

KSRM was established in 1984 with semi-re-rolling mill of 100 ttpa capacity, which was raised to 800 ttpa eventually with Europe's Pomini technology. As of August 2023, the company is increasing its production capacity from 600 to 800 ttpa.[1] The plant operates a 56MW gas-based captive power plant established in 2020.[2]

The company began in the shipbreaking industry before adding steel production using scrap steel from ships.[3][4] The shipbreaking industry, with its largest node in Chittagong, has been widely reported for concerns with dangerous working conditions and pollution.[5]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Plant Details

Table 1: General Plant Details

Start date Workforce size Power source
1984[6] 4000[7] 56MW gas-based Captive Power plant[8]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent GEM entity ID Owner Owner company PermID Owner GEM entity ID
KSRM Steel Plant Ltd [100.0%] 5052154119 [100.0%] E100000131041 [100.0%] KSRM Steel Plant Ltd [100%][6] 5052154119 E100000131041 [100%]

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Responsible steel Main production equipment
semi-finished, finished rolled[9] billet, rebar[9] building and infrastructure[10] Expired[10] unknown unknown EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 800[9][11][6] 800[9][11][6]

Table 5: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter Pellets
NF NF

Table 6: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year EAF production
2019 unknown
2020 unknown
2021 unknown
2022 unknown
2023 unknown

Unit Details

Table 7: Electric Arc Furnace Details

Unit name Status Current capacity (ttpa)
unknown EAF (1) operating[6][11] 400[6][9][11]
unknown EAF (2) operating[6][11] 400[6][9][11]

Table 8: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap
unknown EAF (1) yes 100.00
unknown EAF (2) yes 100.00

Articles and Resources

Additional data

To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "Bangladesh eyes doubling steel production by 2030". The Business Standard. 2023-08-09. Retrieved 2023-11-03.
  2. "KSRM Power Plant - The ONE Steel Maker | KSRM". ksrm.com.bd. 2024-04-22. Retrieved 2025-01-16.
  3. "KSRM Owner and the History Behind the KSRM Group".{{cite web}}: CS1 maint: url-status (link)
  4. "KSRM raises wages for 4,000 workers in response to increased commodity prices". www.dhakatribune.com. Retrieved 2025-12-10.
  5. "Trading Lives for Profit". Human Rights Watch. 2023-09-28.
  6. 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 https://web.archive.org/web/20211223102421/https://www.ksrm.com.bd/. Archived from the original on 2021-12-23. {{cite web}}: Missing or empty |title= (help)
  7. https://ksrm.com.bd/. {{cite web}}: Missing or empty |title= (help)
  8. https://ksrm.com.bd/ksrm-power-plant/. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 9.5 https://web.archive.org/web/20210527101653/https://ksrm.com.bd/products/production-process/index.html. Archived from the original on 2021-05-27. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 https://ksrm.com.bd/about-us/. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 11.3 11.4 11.5 https://web.archive.org/web/20240913182202/https://www.tbsnews.net/supplement/ksrm-capable-meeting-15-20-countrys-steel-demand-679410. Archived from the original on 2024-09-13. {{cite web}}: Missing or empty |title= (help)

Resources