Kalyani Steels Dhenkanal steel plant
| This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
Kalyani Steels Dhenkanal steel plant is a steel plant in Gajamara, Dhenkanal, Odisha, India that operates blast furnace (BF), basic oxygen furnace (BOF), electric arc furnace (EAF), and induction furnace (IF) technology.
Location
The map below shows the approximate location of the plant in Gajamara, Dhenkanal, Odisha, India:
- Location:
- Coordinates (WGS 84): 20.601819, 85.594653 (approximate)
Background
Kalyani Steels Ltd in February 2024 signed a MoU with the Odisha state government to set up an integrated specialty steel, titanium metal and aerospace components manufacturing complex in Dhenkanal district. Kalyani Steels will set up the integrated complex on around 1,100 acres at Gajamara in Dhenkanal district, Odisha, India. It will invest INR 6,626 crore for a 0.7 million tonnes per annum manufacturing unit of specialty steel and auto parts and INR 5,124 crore on aerospace and defence components unit. The company has set an ambitious target of making the units operational in the two years.[1][2]
As of December 2024, the project is in discussion stage and the concrete plans over viability and funding for the actual capex were expected to be finalized over next 1 year.[3] By July 2025, land acquisition for the proposed plant was underway.[4]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Announced date | Start date | Power source | Iron ore source | Coal source |
|---|---|---|---|---|
| 2024-02[5] | 2026[5] | unknown | unknown | unknown |
Table 2: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| Kalyani Steels Ltd [100.0%] | 4295872493 [100.0%] | E100000130701 [100.0%] | Kalyani Steels Ltd [100%][6] | 4295872493 | E100000130701 [100%] |
Table 3: Process and Products
| Steel product category | Steel sector end users | Main production equipment |
|---|---|---|
| finished rolled[5] | automotive, energy[7] | BF; IF; BOF; EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Basic oxygen furnace steelmaking capacity | Electric arc furnace steelmaking capacity | Induction furnace steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|---|---|
| announced | 716[8] | 666[8] | 127[8] | 1509[8] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Blast furnace capacity | Nominal iron capacity (total) |
|---|---|---|
| announced | 1500[8] | 1500[8] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
| Ferronickel | Sinter | Coke | Pellets |
|---|---|---|---|
| NF | 2400[8] | 780[8] | NF |
Unit Details
Table 7: Blast Furnace Details
| Unit name | Status | Announced date | Current size | Current capacity (ttpa) |
|---|---|---|---|---|
| unknown BF (1) | announced[8] | 2024[8] | 650.0[8] | 672[8] |
| unknown BF (2) | announced[8] | 2024[8] | 800.0[8] | 828[8] |
Table 8: Electric Arc Furnace Details
| Unit name | Status | Announced date | Start date | Current capacity (ttpa) | Current size (tonnes) |
|---|---|---|---|---|---|
| unknown EAF (1) | announced[6] | 2024-02[5] | 2026[5] | 666[8] | 60.0[8] |
Table 9: Electric Arc Furnace Feedstock Details
| Unit name | Scrap-based | % scrap |
|---|---|---|
| unknown EAF (1) | yes[8] | >0 |
Table 10: Basic Oxygen Furnace Details
| Unit name | Status | Announced date | Current capacity (ttpa) | Current size |
|---|---|---|---|---|
| unknown BOF (1) | announced[8] | 2025[8] | 716[8] | 60.0 tonnes[8] |
Table 11: Induction Furnace Details
| Unit name | Status | Announced date | Start date | Current capacity (ttpa) | Current size |
|---|---|---|---|---|---|
| unknown IF (1) | announced[6] | 2024-02[5] | 2026[5] | 59[8] | 50.0 tonnes[8] |
| unknown IF (2) | announced[8] | 2025[8] | – | 68[8] | 50.0 tonnes[8] |
Table 12: Induction Furnace Feedstock Details
| Unit name | Scrap-based | % scrap |
|---|---|---|
| unknown IF (1) | yes[8] | >0 |
| unknown IF (2) | None | unknown |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ Service, Express News (2024-02-24). "Kalyani Steels signs MoU for defence components complex". The New Indian Express. Retrieved 2025-01-21.
- ↑ "Kalyani Steels Ltd 51st Annual Report" (PDF). Kalyani Steels. 2024-08-22. Retrieved 2025-01-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Kalyani Steels Limited" (PDF). CareEdge Ratings. 2024-12-04. Retrieved 2025-10-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Kalyani Steels Limited: Rating reaffirmed". ICRA Ratings. 2025-07-31. Retrieved 2025-10-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 https://www.newindianexpress.com/states/odisha/2024/Feb/24/kalyani-steels-signs-mou-for-defence-components-complex.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 6.2 (PDF) https://www.kalyanisteels.com/wp-content/uploads/Kalyani_Steels_Ltd_Annual_Report_2023_24.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.youtube.com/watch?v=ayLDH1pAKac&ab_channel=KalingaTV.
{{cite web}}: Missing or empty|title=(help) - ↑ 8.00 8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 8.09 8.10 8.11 8.12 8.13 8.14 8.15 8.16 8.17 8.18 8.19 8.20 8.21 8.22 8.23 8.24 8.25 8.26 8.27 8.28 8.29 (PDF) https://dhenkanal.odisha.gov.in/sites/default/files/2025-08/DRAFT%20EIA%20REPORT_%20KALYANI%20STEELS.pdf.
{{cite web}}: Missing or empty|title=(help)
