Kapila Metals Jalna steel plant
| This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
Kapila Metals Jalna steel plant is a steel plant in Khatgao, Jalna, Maharashtra, India that operates direct reduced iron (DRI) and induction furnace (IF) technology.
Location
The map below shows the exact location of the plant in Khatgao, Jalna, Maharashtra, India:
- Location:
- Coordinates (WGS 84): 19.874223, 75.817553 (exact)
Background
Kapila Metals Pvt. Ltd. (KMPL) proposed the development of steel plant with a Sponge iron production capacity of 1000TPD, Captive Power 50 MW, Billets 1000TPD and / or TMT Bar 1000 TPD at plot measuring approximately 11.60 ha In Jala district of Maharashtra, India.[1] The steel unit, initiated in 2011, was on hold till 2014 on account of unfavourable market conditions. The execution of the project got further delayed as the environment clearance was accorded only in 2017. Land has been already acquired for the project and detailed project report (DPR) is ready.[2] A pre-feasibility report submitted by the company in 2021 proposed the expansion of the capacity of sponge iron plant from 1000 TPD to 3000 TPD, of billets from 1000 TPD to 3000 TPD and installation of 2.0 MTPA pellet plant.[3]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Announced date | Power source |
|---|---|
| 2011[4] | 51 MW power plant[5] |
Table 2: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| Kapila Metals Pvt Ltd [100.0%] | unknown [100.0%] | E100002019750 [100.0%] | Kapila Metals Pvt Ltd [100%][5] | unknown | E100002019750 [100%] |
Table 3: Process and Products
| Steel products | Main production equipment |
|---|---|
| billet, bar[5] | DRI; IF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Induction furnace steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|
| announced | 1074[5] | 1074[5] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Sponge iron/DRI capacity | Nominal iron capacity (total) |
|---|---|---|
| announced | 1098[5] | 1098[5] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
| Pellets |
|---|
| 2000[5] |
Unit Details
Table 7: Direct Reduced Iron Furnace Details
| Unit name | Status | Announced date | Furnace manufacturer and model | Furnace type | Current capacity (ttpa) |
|---|---|---|---|---|---|
| unknown DRI (1) | announced[5] | 2016[6] | SL/RN Process[6] | rotary kiln[6] | 183[5] |
| unknown DRI (2) | announced[5] | 2021[5] | SL/RN Process[5] | rotary kiln[5] | 183[5] |
| unknown DRI (3) | announced[5] | 2021[5] | SL/RN Process[5] | rotary kiln[5] | 183[5] |
| unknown DRI (4) | announced[5] | 2021[5] | SL/RN Process[5] | rotary kiln[5] | 183[5] |
| unknown DRI (5) | announced[5] | 2021[5] | SL/RN Process[5] | rotary kiln[5] | 183[5] |
| unknown DRI (6) | announced[5] | 2021[5] | SL/RN Process[5] | rotary kiln[5] | 183[5] |
Table 8: Direct Reduced Iron Furnace Reductant Details
| Unit name | Current or initial reductant |
|---|---|
| unknown DRI (1) | coal (solid)[6] |
| unknown DRI (2) | coal (solid)[5] |
| unknown DRI (3) | coal (solid)[5] |
| unknown DRI (4) | coal (solid)[5] |
| unknown DRI (5) | coal (solid)[5] |
| unknown DRI (6) | coal (solid)[5] |
Table 9: Induction Furnace Details
| Unit name | Status | Announced date | Current capacity (ttpa) | Current size |
|---|---|---|---|---|
| unknown IF (1) | announced[6] | 2016[6] | 117[5] | 40.0 tonnes[6] |
| unknown IF (2) | announced[6] | 2021[5] | 117[5] | 40.0 tonnes[5] |
| unknown IF (3) | announced[6] | 2021[5] | 117[5] | 40.0 tonnes[5] |
| unknown IF (4) | announced[6] | 2021[5] | 241[5] | 40.0 tonnes[5] |
| unknown IF (5) | announced[6] | 2021[5] | 241[5] | 40.0 tonnes[5] |
| unknown IF (6) | announced[6] | 2021[5] | 241[5] | 40.0 tonnes[5] |
Table 10: Induction Furnace Feedstock Details
| Unit name | Scrap-based | % scrap | % DRI |
|---|---|---|---|
| unknown IF (1) | yes[5] | 20[5] | 80[5] |
| unknown IF (2) | yes[5] | 20[5] | 80[5] |
| unknown IF (3) | yes[5] | 20[5] | 80[5] |
| unknown IF (4) | yes[5] | 20[5] | 80[5] |
| unknown IF (5) | yes[5] | 20[5] | 80[5] |
| unknown IF (6) | yes[5] | 20[5] | 80[5] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "Environmental Impact Assessment report for proposed project" (PDF). environmentclearance.nic.in. 2017-03-03. Retrieved 2025-11-05.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Work underway on long-awaited Kapila Metals unit in Maharashtra". www.projectstoday.com. Retrieved 2025-11-05.
- ↑ "Pre-Feasibility Report" (PDF). environmentclearance.nic.in. 2021-06-15. Retrieved 2025-11-05.
{{cite web}}: CS1 maint: url-status (link) - ↑ https://www.projectstoday.com/News/Work-underway-on-long-awaited-Kapila-Metals-unit-in-Maharashtra.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 5.15 5.16 5.17 5.18 5.19 5.20 5.21 5.22 5.23 5.24 5.25 5.26 5.27 5.28 5.29 5.30 5.31 5.32 5.33 5.34 5.35 5.36 5.37 5.38 5.39 5.40 5.41 5.42 5.43 5.44 5.45 5.46 5.47 5.48 5.49 5.50 5.51 5.52 5.53 5.54 5.55 5.56 5.57 5.58 5.59 5.60 5.61 5.62 5.63 5.64 5.65 5.66 5.67 5.68 5.69 5.70 5.71 5.72 5.73 (PDF) https://environmentclearance.nic.in/writereaddata/Online/TOR/15_Jun_2021_13022126718764193PFR.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 (PDF) https://environmentclearance.nic.in/writereaddata/Online/EDS/03_Mar_2017_144646183EBD8XKI2_Kapila_Steel_EIA_Report.pdf.
{{cite web}}: Missing or empty|title=(help)