Katewaka Coal Mine
| This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
| Related-articles: |
Katewaka Coal Mine is a proposed coal mine in Muhumbi Village, Ludewa, Njombe, Tanzania.
Location
Table 1: Project-level location details
| Mine Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Katewaka Coal Mine | Muhumbi Village, Ludewa, Njombe, Tanzania[1] | -10.266111, 34.749722 (approximate) |
The map below shows the approximate location of the coal mine:
Project Details
Table 2: Project status
| Status | Status Detail | Project Type | Opening Year | Closing Year |
|---|---|---|---|---|
| Proposed[1] | Pre-Permit[1] | New[1] | – | – |
Table 3: Operation details
| Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
|---|---|---|---|---|---|---|---|
| 1.5[1] | – | – | Surface[1] | Open Pit | 25[1] | 50* | – |
Table 4: Coal resources and destination
| Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
|---|---|---|---|---|---|---|
| 100[1] | – | – | – | Subbituminous | Thermal[1] | Other Industrial[1] |
Table 5: Ownership and parent company
| Owner | Parent Company | Headquarters |
|---|---|---|
| National Development Corporation of Tanzania [100.0%][1] | National Development Corporation of Tanzania [100%] | Tanzania |
Note: The above sections were automatically generated and are based on data from the Global Coal Mine Tracker August 2026 release.
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The Katewaka Coal Project is a proposed opencast coal mine to be operated by the Tanzanian government's National Development Corporation (NDC) in Muhumbi Village, Ludewa, Njombe, Tanzania.
The project will supply 1.5 Mtpa of coal to local cement industries and is expected to generate roughly 1,000 local jobs.[1][2]
As of 2025, the project remains stalled due to a dispute over a three percent management fee between the NDC and the project's investor, MM Steel Resources.[2]