Khanyisa Colliery

From Global Energy Monitor
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

Khanyisa Colliery is a mothballed coal mine in Ogies, Mpumalanga, South Africa.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Khanyisa Colliery Ogies, Mpumalanga, South Africa[1] -26.039752, 28.968455 (exact)

The map below shows the exact location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Opening Year Closing Year
Mothballed[2] Care and Maintenance[2] 2017 –

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
1.2[1] 0.032[1] 2023[1] Surface[1] Open Pit 3.05 60* 57[1]

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
0[3] 2024[3] 2.67[3] – Bituminous Thermal –

Table 5: Ownership and parent company

Note: To access more comprehensive data on energy ownership, please visit the Global Energy Ownership Tracker.
Owner Parent Company Headquarters
Salungano Group Ltd [100.0%][1][4] Salungano Group South Africa

Table 6: Historical production (unit: million tonnes per annum)

ROM or Saleable 2017 2018 2019 2020 2021 2022 2023 2024 2025
– – 0.47[5] 0.4[6] 1.1[7] 1[8] 0.83[9] 0.03[1] – –

Note: The above sections were automatically generated and are based on data from the Global Coal Mine Tracker August 2026 release.

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

The Khanyisa Colliery is a mining complex owned by the Salungano Group (formerly known as Wescoal Holdings) near Ogies, Mpumalanga, South Africa.

The Khanyisa Complex is comprised of the historical Khanyisa mining area (mined out), as well as the Catwalk (pillar and roof mining) and the Triangle (virgin ground) areas, all of which have been consolidated into one mining complex.[10]

According to Salungano's 2023 annual report, coal reserves for Khanyisa were depleted in FY2023, and initiatives are being pursued to extend the life of mine. During this interim period, the mine will remain under care and maintenance.[10][11]

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 (PDF) https://web.archive.org/web/20241202232845/https://salunganogroup.com/wp-content/uploads/2024/06/Salungano-Integrated-Annual-Report-2023.pdf. Archived from the original (PDF) on 2024-12-02. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 https://miningdataonline.com/property/788/Khanyisa-Complex.aspx. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 (PDF) https://salunganogroup.com/wp-content/uploads/2025/10/Integrated-Annual-Report-for-the-year-ended-31-March-2024.pdf. {{cite web}}: Missing or empty |title= (help)
  4. ↑ https://www.miningweekly.com/article/salungano-narrows-operating-loss-as-it-works-to-turnaround-business-2025-10-08. {{cite web}}: Missing or empty |title= (help)
  5. ↑ (PDF) https://salunganogroup.com/wp-content/uploads/2022/03/wescoal-holdings-limited-integrated-annual-report-2018-web-1.pdf. {{cite web}}: Missing or empty |title= (help)
  6. ↑ (PDF) https://salunganogroup.com/wp-content/uploads/2022/03/wescoal-holdings-limited-2019-integrated-annual-report.pdf. {{cite web}}: Missing or empty |title= (help)
  7. ↑ (PDF) https://salunganogroup.com/wp-content/uploads/2022/03/wescoal-integrated-annual-report-2020.pdf. {{cite web}}: Missing or empty |title= (help)
  8. ↑ (PDF) https://salunganogroup.com/wp-content/uploads/2022/03/wescoal-integrated-annual-report-2021.pdf. {{cite web}}: Missing or empty |title= (help)
  9. ↑ (PDF) https://salunganogroup.com/wp-content/uploads/2022/07/salungano-group-integrated-annual-report-2022.pdf. {{cite web}}: Missing or empty |title= (help)
  10. ↑ 10.0 10.1 Salungano Group Integrated Annual Report for the year ended 31 March 2022, Salungano website, accessed October 2022.
  11. ↑ "Khanyisa Complex", MDO Mining Intelligence and News, accessed October 2025.