Kholodnaya Balka Coal Mine (шахта Холодная Балка) is a mothballed coal mine in Makiivka, Donetsk, Ukraine.
Location
Table 1: Project-level location details
| Mine Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Kholodnaya Balka Coal Mine | Makiivka, Donetsk, Ukraine[1] | 48.0018392811975, 38.0522193792562 (approximate) |
The map below shows the approximate location of the coal mine:
Project Details
Table 2: Project status
| Status | Status Detail | Opening Year | Closing Year |
|---|---|---|---|
| Mothballed | – | 1957[2] | – |
Table 3: Operation details
| Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
|---|---|---|---|---|---|---|---|
| 0.3[3] | 0.324[4] | 2019[4] | Underground | – | – | 730* | – |
Table 4: Coal resources and destination
| Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
|---|---|---|---|---|---|---|
| 44[3] | 2018[3] | – | – | Bituminous[2] | Thermal | – |
Table 5: Ownership and parent company
| Owner | Parent Company | Headquarters |
|---|---|---|
| Makeevugol State Enterprise [100.0%] | Ministry of Energy of Donetsk People's Republic | Russia |
Table 6: Historical production (unit: million tonnes per annum)
| ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|---|---|---|---|
| – | 0.32*[5] | 0.32*[5] | 0.32[6] | – | – | 0.3*[7] | – | – | – |
Note: The above sections were automatically generated and are based on data from the Global Coal Mine Tracker August 2026 release.
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The Kholodnaya Balka Coal Mine (шахта Холодна Балка) is an underground coal mine located in the Kholodna Balka settlement of Makiivka, Donetsk Oblast, Ukraine. It is operated by Makeevugol State Enterprise, subordinate to the Ministry of Energy of the self-proclaimed Donetsk People's Republic, controlled by Russia.[8]
According to the official Makeevugol website, the mine was commissioned in 1957 with a design capacity of 600,000 tonnes per year. As of 2018, its installed production capacity stood at 300,000 tonnes per year, with capacity utilisation of 84.4% over the first six months of that year. The last major reconstruction took place in 2003 Industrial reserves stood at 44.694 million tonnes as of 1 January 2018, of which 12.230 million tonnes were in the working seam.[8] The mine produced bituminous coal.
Following the seizure of Makiivka by pro-Russian forces in 2014, Kholodnaya Balka became the most productive mine of Makeevugol and was described by the enterprise's director as its base mine. On 31 March 2015 it commissioned the first new longwall to enter service in the Donetsk People's Republic since the start of the conflict — the fifth western relief longwall of seam h10v — equipped with a KD-80 mechanised support, SP-251 conveyor, and UKD 200/250 shearer, all repaired at Makeevka workshops. Planned daily output was 1,000 tonnes.[9]
By November 2015, the mine had fulfilled its annual production plan ahead of schedule, extracting 451,000 tonnes of coal — described as the largest share of total Makeevugol output.[10]
In 2018, a third eastern longwall was commissioned, with reserves of 860,000 tonnes, a face length of 240 m, and a working field length of 1,800 m. Equipment — a new shearer manufactured at the Horlivka engineering plant and support and conveyor repaired at Makeevka and Donetsk workshops — was sourced entirely within the DPR.[11]
In June 2021, a fourth eastern longwall of seam h10v was commissioned following the completion of the third eastern longwall in March of that year. The new face had 206 powered roof support sections with a total equipment weight exceeding 2,000 tonnes, and a planned daily output of no less than 900 tonnes. It was the fifth new longwall commissioned across all DPR mines since the start of 2021. The face was expected to remain in operation until September 2022.[12]
The mine's recorded production in 2019 was 0.32 Mt.[13]
None of the Makeevugol mines, including Kholodnaya Balka, were taken up by private investors under Russia's 2024 programme to lease occupied-territory coal mines to Russian companies.[14]
No production data or operational updates for the mine were identified beyond 2022. The mine's current status is uncertain; as of April 2026, no evidence of ongoing production was found in publicly available sources.
Associated Coal Mine Methane Mitigation Projects
Some coal mines have installed infrastructure which can use and/or destroy some methane emissions associated with mining. In 2024, the Global Methane Initiative reported that this mine had a mitigation project associated with it. This methodology page describes how GEM classified these projects and linked them with coal mines in the Global Coal Mine Tracker.
Table MM1: Methane mitigation projects
| Mitigation Project Name | Project Type | GMI Reported Status | GMI Reported Start Year |
|---|---|---|---|
| Holodnaya Balka Mine Boiler Fuel Project - Ukraine | utilization | Unknown | 2000 |
| Holodnaya Balka Mine Combined Heat & Power Project - Ukraine | utilization | Unknown | – |
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ https://wikimapia.org/6893186/ru/%D0%A8%D0%B0%D1%85%D1%82%D0%B0-%D0%A5%D0%BE%D0%BB%D0%BE%D0%B4%D0%BD%D0%B0%D1%8F-%D0%91%D0%B0%D0%BB%D0%BA%D0%B0-3.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 https://miningwiki.ru/wiki/%D0%A8%D0%B0%D1%85%D1%82%D0%B0_%C2%AB%D0%A5%D0%BE%D0%BB%D0%BE%D0%B4%D0%BD%D0%B0%D1%8F_%D0%B1%D0%B0%D0%BB%D0%BA%D0%B0%C2%BB.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 http://www.makeevugol.donbass.com/products.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 https://cyberleninka.ru/article/n/proizvodstvennyy-potentsial-ugledobyvayuschih-predpriyatiy-donbassa-struktura-analiz-faktory-vliyaniya/viewer.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 https://web.archive.org/web/20240206181533/https://cyberleninka.ru/article/n/proizvodstvennyy-potentsial-ugledobyvayuschih-predpriyatiy-donbassa-struktura-analiz-faktory-vliyaniya/viewer.
{{cite web}}: Missing or empty|title=(help) - ↑ http://dnr-live.ru/shahtyoryi-holodnoy-balki-vyipolnili-plan-na-dva-mesyatsa-ranshe-sroka/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.in-power.ru/news/ugol/38768-novaja-lava-shahty-holodnaja-balka-budet-vvedena-v-ekspluataciyu-22-iyunja.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 8.0 8.1 "Продукция и структура". makeevugol.donbass.com. Retrieved Apr 2, 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ "31 марта в Макеевке на шахте «Холодная балка» сдана в эксплуатацию первая в Донецкой Народной Республике новая шахтная лава". makeyevka.ru. March 31, 2015. Retrieved Apr 2, 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Макеевская шахта «Холодная Балка» досрочно выполнила годовой план добычи угля". makeyevka.ru. Retrieved Apr 2, 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ "В Макеевке на шахте «Холодная балка» введена в эксплуатацию новая шахтная лава". makeyevka.ru. 2018. Retrieved Apr 2, 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Новая лава шахты «Холодная Балка» будет введена в эксплуатацию 22 июня". in-power.ru. June 2021. Retrieved Apr 2, 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Производственный потенциал угледобывающих предприятий Донбасса". cyberleninka.ru. Retrieved Apr 2, 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ "«Надо вернуться в СССР»: Уголь Донбасса остался без перспектив". Рамблер. Retrieved Apr 2, 2026.
{{cite web}}: CS1 maint: url-status (link)