Kish South Kaveh Steel Hormuzgan plant
| This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
Kish South Kaveh Steel Hormuzgan plant (شرکت فولاد کاوه جنوب کیش), also known as SKS Steel Company, Kish South Kaveh Steel Company, is a steel plant in Bandar Abbas, Hormozgan, Iran that operates electric arc furnace (EAF) and direct reduced iron (DRI) technology.
Location
The map below shows the exact location of the plant in Bandar Abbas, Hormozgan, Iran:
- Location: Bandar Abbas, Iran
- Coordinates (WGS 84): 27.169696, 56.095207 (exact)
Background
The Kish South Kaveh steel plant operates both Direct Reduced Iron (DRI) and Electric Arc Furnace (EAF) units. Iron production is split between two units, each with a capacity of 0.93 million tons per year, with a planned third unit of 1.5 million tons per year in capacity under construction.[1][2] Steelmaking takes place in two EAF units of 1.2 million tons per year in capacity each.[3]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Start date | Workforce size | Power source | Iron ore source |
|---|---|---|---|
| 2011[4] | 1000[5] | Combined Cycle Power Plant (500 mW for phase 1, built by Southeast Saba Power Generation Company)[6] | unknown |
Table 2: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| Kish South Kaveh Steel Co [100.0%] | unknown [100.0%] | E100000131118 [100.0%] | Kish South Kaveh Steel Co [100%][7] | unknown | E100000131118 [100%] |
Table 3: Process and Products
| Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Responsible steel | Main production equipment |
|---|---|---|---|---|---|---|
| crude, semi-finished[8] | ingot, billet, DRI, sponge iron, bloom[8] | unknown | 2024-06-11[9] | unknown | unknown | DRI; EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|
| operating | 2400[10][11][12][13] | 2400[10][11][12][13] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Sponge iron/DRI capacity | Nominal iron capacity (total) |
|---|---|---|
| construction | 1500[14] | 1500[14] |
| operating | 1860[4][15][16] | 1860[4][15][16] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
| Sinter | Pellets |
|---|---|
| NF | 5000[17][18] |
Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
| Year | EAF production | Other/unknown steel production |
|---|---|---|
| 2020 | unknown | unknown |
| 2021 | unknown | unknown |
| 2022 | unknown | unknown |
| 2023 | unknown | unknown |
| 2024 | unknown | unknown |
Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
| Year | DRI production | Other/unknown iron production |
|---|---|---|
| 2019 | unknown | unknown |
| 2020 | unknown | unknown |
| 2021 | unknown | unknown |
| 2022 | unknown | unknown |
| 2024 | unknown | unknown |
Unit Details
Table 9: Direct Reduced Iron Furnace Details
| Unit name | Status | Construction date | Start date | Furnace manufacturer and model | Furnace type | Current capacity (ttpa) |
|---|---|---|---|---|---|---|
| unknown DRI (1) | operating[16][4][15] | – | 2012[16] | Midrex[16] | shaft furnace[16] | 930[16][4][15] |
| unknown DRI (2) | construction[14][19] | 2022-06[20] | – | Midrex Megamodule[21] | shaft furnace[21] | 1500[14] |
| unknown DRI (3) | operating[16][4][15] | – | 2012[16] | Midrex[16] | shaft furnace[16] | 930[16][4][15] |
Table 10: Direct Reduced Iron Furnace Reductant Details
| Unit name | Current or initial reductant | Gas reductant | Hydrogen reductant status |
|---|---|---|---|
| unknown DRI (1) | gas[18] | syngas (reformed methane)[18] | unknown |
| unknown DRI (2) | gas | – | – |
| unknown DRI (3) | gas[18] | syngas (reformed methane)[18] | unknown |
Table 11: Electric Arc Furnace Details
| Unit name | Status | Construction date | Start date | Furnace manufacturer and model | Current capacity (ttpa) | Current size (tonnes) |
|---|---|---|---|---|---|---|
| unknown EAF (1) | operating[22] | – | 2015[11] | Saralle, MME EBT / 170/7500[11][23][5] | 1200[13][11] | 210.0[4][15] |
| unknown EAF (2) | operating[24] | 2012[12][5][10] | 2020[25][12][26] | Saralle, MME[23] | 1200[13][12][10] | 210.0[25] |
Table 12: Electric Arc Furnace Feedstock Details
| Unit name | Scrap-based | % scrap | % DRI | % HBI | % basic/merchant pig iron | % granulated pig iron | % pig iron (unknown if basic/merchant or granulated) | % other iron |
|---|---|---|---|---|---|---|---|---|
| unknown EAF (1) | yes[14] | 10.00[14][23] | 90.00[14] | 0[14] | 0[14] | 0[14] | 0[14] | 0[14] |
| unknown EAF (2) | yes[14] | 10.00[14][23] | 90.00[14] | 0[14] | 0[14] | 0[14] | 0[14] | 0[14] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "طرحهای توسعه - فولاد کاوه جنوب کیش". www.sksco.ir. Retrieved 2025-12-04.
- ↑ "SKS Meltshop". MME.
{{cite web}}: CS1 maint: url-status (link) - ↑ "فاز دوم فولاد سازی | پروژههای جاری - فولاد کاوه جنوب کیش". www.sksco.ir. Retrieved 2025-12-04.
- ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 https://web.archive.org/web/20230119235707/https://en.sksco.ir/en/page/ironing-unit. Archived from the original on 2023-01-19.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 https://web.archive.org/web/20160318044635/http://www.prnewswire.com:80/news-releases/the-construction-of-infrastructure-and-provision-of-a-supply-chain-bring-irans-steel-industry-to-a-new-level-300213428.html. Archived from the original on 2016-03-18.
{{cite web}}: Missing or empty|title=(help) - ↑ "Iranian steelmaker SKS plans major expansion". Steel Times International. Archived from the original on 2026-04-01. Retrieved 2024-12-03.
- ↑ (PDF) https://web.archive.org/web/20210807133859/http://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2020.pdf. Archived from the original (PDF) on 2021-08-07.
{{cite web}}: Missing or empty|title=(help) - ↑ 8.0 8.1 https://web.archive.org/web/20230608052051/https://www.sksco.ir/. Archived from the original on 2023-06-08.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20230329160523/https://www.sksco.ir/fa/certificate. Archived from the original on 2023-03-29.
{{cite web}}: Missing or empty|title=(help) - ↑ 10.0 10.1 10.2 10.3 "Second Phase Of Steelmaking". فولاد کاوه جنوب کیش. Archived from the original on 2025-08-21. Retrieved 2024-12-09.
{{cite web}}: Text "Current Projects - South Kaveh Steel Co" ignored (help) - ↑ 11.0 11.1 11.2 11.3 11.4 https://lms.sahandetemadarvand.ir/articles/economy-business-and-markets/75498/sarralle-group-reached-a-record-of-22-heats-per-day-in.
{{cite web}}: Missing or empty|title=(help) - ↑ 12.0 12.1 12.2 12.3 12.4 (PDF) https://web.archive.org/web/20210929032946/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2021.pdf (PDF).
{{cite web}}: Check|archive-url=value (help); Missing or empty|title=(help) - ↑ 13.0 13.1 13.2 13.3 https://web.archive.org/web/20211204175724/https://irannewsdaily.com/2020/08/capacity-of-steel-production-grows-iranian-ceo-says/. Archived from the original on 2021-12-04.
{{cite web}}: Missing or empty|title=(help) - ↑ 14.00 14.01 14.02 14.03 14.04 14.05 14.06 14.07 14.08 14.09 14.10 14.11 14.12 14.13 14.14 14.15 14.16 14.17 14.18 14.19 https://web.archive.org/web/20230329165529/https://www.sksco.ir/fa/page/development-plans. Archived from the original on 2023-03-29.
{{cite web}}: Missing or empty|title=(help) - ↑ 15.0 15.1 15.2 15.3 15.4 15.5 15.6 https://web.archive.org/web/20220630092749/http://www.mme-co.de/en/Home/projects/SKS-meltshop.html. Archived from the original on 2022-06-30.
{{cite web}}: Missing or empty|title=(help) - ↑ 16.00 16.01 16.02 16.03 16.04 16.05 16.06 16.07 16.08 16.09 16.10 16.11 "2020 World Direct Reduction Statistics" (PDF). Midrex. 2021-09-14. Archived from the original (PDF) on 2021-11-29.
- ↑ https://pgsez.ir/en/south-kaveh-steel-company/.
{{cite web}}: Missing or empty|title=(help) - ↑ 18.0 18.1 18.2 18.3 18.4 https://www.sksco.ir/fa/page/ironing-unit.
{{cite web}}: Missing or empty|title=(help) - ↑ https://atlaseqtesad.ir/68594/kaveh-south-steel-module-c-progress.html.
{{cite web}}: Missing or empty|title=(help) - ↑ https://chilanonline.com/2023/07/10/51446/.
{{cite web}}: Missing or empty|title=(help) - ↑ 21.0 21.1 (PDF) https://www.midrex.com/wp-content/uploads/MidrexStatsBook2024.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20240911003451/https://www.sksco.ir/fa/page/steel-and-casting/electric-arc-furnace. Archived from the original on 2024-09-11.
{{cite web}}: Missing or empty|title=(help) - ↑ 23.0 23.1 23.2 23.3 https://mme-co.ir/en/south-kaveh-steel-steelmaking-plant-project/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20240905162418/https://www.sksco.ir/fa/page/current-projects/the-second-phase-of-steelmaking. Archived from the original on 2024-09-05.
{{cite web}}: Missing or empty|title=(help) - ↑ 25.0 25.1 https://www.sksco.ir.webr.ir/fa/news/show/653.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.theiranproject.com/en/video/384195/video-phase-2-of-south-kaveh-steel-co-will-inaugurate.
{{cite web}}: Missing or empty|title=(help)