Kishiwada Steel Osaka steel plant
| This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
Kishiwada Steel Osaka steel plant is a steel plant in Kishiwada, Osaka, Japan that operates electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Kishiwada, Osaka, Japan:
- Location: 20, Rinkaicho, Kishiwada-shi, Osaka, Japan
- Coordinates (WGS 84): 34.477479, 135.353918 (exact)
Background
Kishiwada Steel was established in 1956. In 1971, the plant began operating using electric arc furnace. No. 2 electric arc furnace began operation at the plant in 1980. In 2001, the plant started operation of its EcoArc furnace.[1]
A fire accident at the plant on January 04, 2023 resulted in temporarily suspending the operations at the plant. The manufacturing was scheduled to restart on April 25, 2023.[2]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Start date | Workforce size | Power source | Iron ore source |
|---|---|---|---|
| 1956-12[3] | 250[3] | unknown | unknown |
Table 2: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| Kishiwada Steel Co Ltd [100.0%] | 4295963393 [100.0%] | E100001012303 [100.0%] | Kishiwada Steel Co Ltd [100%][3] | 4295963393 | E100001012303 [100%] |
Table 3: Process and Products
| Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Responsible steel | Main production equipment |
|---|---|---|---|---|---|---|
| semi-finished, finished rolled[4] | billet, bar[4] | building and infrastructure[4] | 2025-08-01[5] | unknown | unknown | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|
| operating | 500[6] | 500[6] |
Table 5: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
| Year | EAF production | Other/unknown steel production |
|---|---|---|
| 2019 | unknown | unknown |
| 2020 | unknown | unknown |
| 2021 | unknown | unknown |
| 2022 | unknown | unknown |
| 2023 | unknown | unknown |
| 2024 | unknown | unknown |
| 2025 | unknown | unknown |
Unit Details
Table 6: Electric Arc Furnace Details
| Unit name | Status | Start date | Furnace manufacturer and model | Current capacity (ttpa) | Current size (tonnes) |
|---|---|---|---|---|---|
| unknown EAF (1) | operating[7] | 2001[3] | Steel Plantech EcoArc[8][8] | 500[6] | 70.0[7][8] |
Table 7: Electric Arc Furnace Feedstock Details
| Unit name | Scrap-based | % scrap | % DRI | % HBI | % sponge iron (unknown if DRI or HBI) | % basic/merchant pig iron | % granulated pig iron | % pig iron (unknown if basic/merchant or granulated) | % other iron |
|---|---|---|---|---|---|---|---|---|---|
| unknown EAF (1) | yes[7] | 100.00[7] | 0[7] | 0[7] | 0[7] | 0[7] | 0[7] | 0[7] | 0[7] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "Company introduction|Kishiwada steel manufacture (official homepage)". Kishiwada steel manufacture. Retrieved 2024-02-23.
- ↑ "News of the operation reopening day of our steel manufacture factory". Kishiwada steel manufacture. Retrieved 2024-12-30.
- ↑ 3.0 3.1 3.2 3.3 https://web.archive.org/web/20240130192036/https://kishi-seiko.jp/en/publics/index/84/. Archived from the original on 2024-01-30.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 https://web.archive.org/web/20240130192359/https://kishi-seiko.jp/en/publics/index/75/. Archived from the original on 2024-01-30.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20240130192512/https://copilog2.jp/bds_932996/views/detail/27. Archived from the original on 2024-01-30.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 6.2 "产能核算" (PDF). Archived from the original (PDF) on 2022-02-24.
- ↑ 7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 7.10 https://web.archive.org/web/20240130192705/https://kishi-seiko.jp/en/publics/index/90/. Archived from the original on 2024-01-30.
{{cite web}}: Missing or empty|title=(help) - ↑ 8.0 8.1 8.2 https://web.archive.org/web/20240122233907/https://steelplantech.com/product/ecoarc/. Archived from the original on 2024-01-22.
{{cite web}}: Missing or empty|title=(help)
