Konar Coal Mine is an operating coal mine in Bokaro, Jharkhand, India.
Location
Table 1: Project-level location details
| Mine Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Konar Coal Mine | Bokaro, Jharkhand, India | 24.155314, 86.303182 (exact) |
The map below shows the exact location of the coal mine:
Project Details
Table 2: Project status
| Status | Status Detail | Opening Year | Closing Year |
|---|---|---|---|
| Operating[1] | – | 2017[2] | – |
Table 3: Operation details
| Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
|---|---|---|---|---|---|---|---|
| 5[1] | 5.35[3] | 2023[3] | Surface | Open Pit | 4.71[2] | 60* | 972.1359094* |
Table 4: Coal resources and destination
| Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
|---|---|---|---|---|---|---|
| 82.3[2] | 2022[2] | – | East Bokaro | Bituminous | Thermal & Met | – |
Table 5: Ownership and parent company
| Owner | Parent Company | Headquarters |
|---|---|---|
| Central Coalfields Ltd [100.0%][4] | Coal India | India |
Table 6: Historical production (unit: million tonnes per annum)
| ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|---|---|---|---|
| ROM | – | – | 3.27[5] | – | 4.24[6] | 6.32[3] | 5.35[3] | – | – |
Expansion/Extension
Table 7: Project status
| Status | Status Detail | Project Type | Project Phase | Added Capacity (Mtpa)* | Start Year |
|---|---|---|---|---|---|
| Proposed[7] | Permitted[8] | Expansion | – | 8[8] | 2032 (planned)[7] |
Note: The above sections were automatically generated and are based on data from the Global Coal Mine Tracker August 2026 release.
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background on Mine
The Bokaro and Kargali coal mines are owned by Central Coalfields Limited (a subsidiary of Coal India).[9]
Expansion Details
- Mine Karo
- Status: Proposed
- Size of Expansion: 11 MTPA
- Permits and Applications: Projects, 2017, CCL
- Mine Konar
- Status: Proposed
- Size of Expansion: 8 MTPA
- Permits and Applications: Environmental Feasibility, 2015, CCL
- Mine Dhori Group of mines
- Status: Proposed
- Size of Expansion: 8.25 MTPA
- Permits and Applications: Environmental Clearance, 2013, CCL
Coal Mine Boundaries and Methane Sources
Global Energy Monitor researchers have identified coal mine boundary/boundaries and potential sources of coal mine methane (CMM) for this mine. These research results can be used to drive CMM attribution and mitigation efforts, particularly when combined with remotely sensed methane plume locations and mine ownership data. Explore the results with the embedded map at the top of this page by clicking on the mine boundary polygon or the CMM placemarkers to reveal more details. A detailed description of this research can be found in Coal Mine Boundaries and Methane Sources. This data is also available as a downloadable companion dataset to the Global Coal Mine Tracker and the Global Methane Emitters Tracker.
Table SMP1: Coal mine boundaries and methane sources data
| ID | Mine feature category | Mine feature subcategory | Description | Coordinates precision | Data source date |
|---|---|---|---|---|---|
| M0560.B1 | mine boundary | surface | Estimated Konar coal mine boundary | estimated | 2025-09-16 00:00:00 |
| M0560.B2 | mine boundary | surface | Estimated Konar coal mine boundary | estimated | 2025-09-16 00:00:00 |
Table SMP2: Coal mine boundaries and methane sources data (continued)
| ID | Notes |
|---|---|
| M0560.B1 | An accurate boundary could not be found. The boundary is that shown by OpenStreetMaps (OSM) for the mine. The boundary area is significantly less than the documented area of the mine - 729 hectares - found on page 1 of the Pre-feasibility Report of Konar Expansion OCP (Nominal / Peak capacity 8.00/ 11.00 MTPA) & Integrated Konar Non-coking Coal Washery (7 MTPA) published Sept 2015, https://web.archive.org/web/20210917135959/http://environmentclearance.nic.in/writereaddata/Online/TOR/0_0_23_Sep_2015_1612247171Annexure-Pre-feasibilityReport(PFR).pdf |
| M0560.B2 | An accurate mine boundary could not be found. There is a good correlation between the area of mine boundaries found in this research project, and the 'Mine Size (Km2)' area found in the GEM Global Coal Mine Tracker May 2025 (GCMT) database (R-squared=0.68). A circular boundary with the area from the GCMT for this mine was created as an estimated boundary. |
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 (PDF) https://coal.nic.in/sites/default/files/2023-05/23-05-2023.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 (PDF) https://scclmines.com/TestFold/EnvDocs/2023002.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 (PDF) https://coal.nic.in/sites/default/files/2024-05/srn-march-2024.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.centralcoalfields.in/cmpny/areas.php.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://www.nfi.org.in/sites/nfi/files/publication/Working%20Paper%20Jharkhand-Book-11-11-22%20%281%29.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://coal.gov.in/sites/default/files/2024-01/31-01-2024-iclp.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 (PDF) https://coal.nic.in/sites/default/files/2025-04/srn-feb-2025.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 8.0 8.1 (PDF) https://web.archive.org/web/20260701062643/https://d3u7ubx0okog7j.cloudfront.net/documents/SDC_Status_Report_Yr_20-21_Rev.pdf. Archived from the original (PDF) on 01 July 2026.
{{cite web}}: Check date values in:|archive-date=(help); Missing or empty|title=(help) - ↑ Central Coalfields Limited, Statutory Clearances, accessed March 23, 2020