Krasnobrodsky Coal Mine

From Global Energy Monitor
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

Krasnobrodsky Coal Mine (Краснобродский разрез) is an operating coal mine in Kiselevsk Urban, Kemerovo, Russia.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Krasnobrodsky Coal Mine Krasnobrodsky, Prokopyevsky, Kemerovo, Russia[1] 54.1677527, 86.4732567 (exact)

The map below shows the exact location of the coal mine:


Project Details

Table 2: Project status

Status Status Detail Opening Year Closing Year
Operating[2] – 1947[2] –

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
9[3] 8.83[4][5][6] 2022[4][5][6] Surface Open Pit – 60* 2901[2]

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
340[3] 2025[3] – – Bituminous[7] Thermal & Met[7] –

Table 5: Ownership and parent company

Note: To access more comprehensive data on energy ownership, please visit the Global Energy Ownership Tracker.
Owner Parent Company Headquarters
Kuzbassrazrezugol JSC [100.0%][8] Ural Mining and Metallurgical Company OJSC [52.7%]; other unknown/mixed entity types [47.3%] Russia

Table 6: Historical production (unit: million tonnes per annum)

Note: The asterisk (*) indicates that the value is an estimated figure based on various factors, including the company's forecasted or reported monthly or quarterly production data, etc.
ROM or Saleable 2017 2018 2019 2020 2021 2022 2023 2024 2025
Saleable 7.31[9] 7.57[9] 7.8[10] 7.71[5] 7.55[11] 8.83*[4][5][6] – – –


Expansion/Extension

Table 7: Project status

* Added capacity of a coal mine refers to the enhancement in the mine's production capabilities beyond its initial production capacity.
Status Status Detail Project Type Project Phase Added Capacity (Mtpa)* Start Year
Proposed[12] Pre-Permit Expansion Phase 2[13] 1.35 –

Note: The above sections were automatically generated and are based on data from the Global Coal Mine Tracker August 2026 release.

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

The Krasnobrodsky coal mine (Краснобродский разрез) is a surface mine in Kemerovo Oblast, Russia.[14] The Krasnobrodsky coal mine is a operated by Kuzbassrazrezugol, a subsidiary of Ural Mining Metallurgical Company.

The mine is spread out across three sections: Krasnobrodsky, Novosergeevsky and Vakhrushevksy, which were commissioned in 1947, 1956 and 1969, respectively.[15]

There is very little information available on the mine. Production has been consistently stable at 7.5-8 million tonnes per annum over 2019-2021. Kuzbassrazrezugol reported in its 2022 annual report that the volume of well drilling and the volume of rock blasting at the mine increased by 18% and 17%, respectively, compared with 2021. This can be an indication that production increased in 2022. [16] (estimated increase of 1.2-1.3Mt). The company's 2023 annual report[17] and 2023 Sustainability report did not present production results of the mine. The annual report stated that the volume of well drilling and of rock blasting at the mine increased by 2%.

2023-2025 production levels are not available. In 2023, the coal mines of Kuzbassrazrezugul were said to have decreased production to 40.7 million tonnes from about 44 million tonnes in 2022.

In May 2024, two new substations - Utkinskaya (110 kV) and Uglerod (35 kV) - were commissioned at the Krasnobrodsky coal mine, increasing the mine’s installed power capacity by nearly one third. The power capacity increase aimed at supporting the expansion of industrial infrastructure and ensuring reliable power supply to mining equipment, including excavators and dewatering systems.[18]

Environmental Protection Measures and Seismic Activity

In November 2020, Kuzbassrazrezugol commissioned wastewater treatment facilities at the mine. The system combined mechanical (including adsorption with zeolite) and chemical treatment to improve purification of discharged water before release into the Cherta River.[19]

An earthquake of magnitude of 5.3 was registered in the area of the coal mine in January 2022.[20] Another earthquake occurred in March 2023 with a magnitude of 4.4. [21]

Expansion

In 2020 it appeared that the company planned to expand the operations at Vakhrushevsky-Gluboky section. Preliminary Environmental Impact Assessment was published in 2020.[22] According to the assessment, the expanded area can generate 1.65 million tonnes of coal per annum (page 10).[22] The mining area would be only 3km north of the city of Prokopyevsk, and 1km west of the city of Kiselevsk.[22] The area is already heavily mined. Public consultation announcements were made in 2022.[23]

In December 2024, announcements were made of the planned public consultation of the project to develop the reserves of the Krasnobrodsky Gluboky section. [24][25] However the parameters of the expansion were not clear.

In January 2025, a new public consultation was announced for the second stage of the project to develop reserves of the Krasnobrodsky Gluboky section. The Environmental Impact Assessment was conducted from June 20, 2024 to February 20, 2025, and public consultations were held in the form of a survey between January 21 and February 20, 2025 .[26] There are no published results of the consultations in the Russian registry of public discussion materials as of early 2026.

Coal Mine Boundaries and Methane Sources

Global Energy Monitor researchers have identified coal mine boundary/boundaries and potential sources of coal mine methane (CMM) for this mine. These research results can be used to drive CMM attribution and mitigation efforts, particularly when combined with remotely sensed methane plume locations and mine ownership data. Explore the results with the embedded map at the top of this page by clicking on the mine boundary polygon or the CMM placemarkers to reveal more details. A detailed description of this research can be found in Coal Mine Boundaries and Methane Sources. This data is also available as a downloadable companion dataset to the Global Coal Mine Tracker and the Global Methane Emitters Tracker.

Table SMP1: Coal mine boundaries and methane sources data

ID Mine feature category Mine feature subcategory Description Coordinates precision Data source date
M0812.B1 mine boundary surface Krasnobrodsky coal mine boundary, Krasnobrodskoye field reported 2025-12-15 00:00:00
M0812.B2 mine boundary surface Krasnobrodsky coal mine boundary, Vakhrushevskoye field reported 2025-12-15 00:00:00
M0812.P1 other preparation plant Coal handling and preparation plant extracted 2024-05-13 00:00:00
M0812.P2 other preparation plant Coal handling and preparation plant extracted 2025-04-30 00:00:00

Table SMP2: Coal mine boundaries and methane sources data (continued)

Coal mine boundaries and methane sources were last researched for this mine on Dec 15, 2025
ID Notes
M0812.B1 This mine operates under the Krasnobrodskoye subsoil land-use license КЕМ11669ТЭ, as identified through the Annual Report of JSC “UK Kuzbassrazrezugol”(Годовой отчет АО «УК Кузбассразрезуголь»), page 3, https://www.archive.org/details/Kuzbassrazrezugol2023, 2023. The license was issued on September 3, 2003, and is valid until December 31, 2032. The boundary was extracted from the NedraExpert portal at https://web.archive.org/web/20251219223515/https://www.nedraexpert.ru/license/144385?ysclid=mjdg4ia9a7745751665. The area between the Krasnobrodskoye and Vakhrushevskoye license boundaries is occupied by subsoil plots (including Karagailinskoye and Novosergeevskoye) classified as part of the Undistributed Subsoil Fund, indicating no active mining operations within this intervening area at the time of review. This was verified through the NedraExpert portal, https://web.archive.org/web/20251217220747/https://www.nedraexpert.ru/subsurface/2100027339/1, https://web.archive.org/web/20251219223601/https://www.nedraexpert.ru/subsurface/2100028211/1. The approximate area of the resulting boundary is 11 square km.
M0812.B2 This mine operates under the Vakhrushevskoye subsoil land-use license КЕМ01797ТЭ, as identified through the Annual Report of JSC “UK Kuzbassrazrezugol”(Годовой отчет АО «УК Кузбассразрезуголь»), page 3, https://www.archive.org/details/Kuzbassrazrezugol2023, 2023.The license was registered on April 30, 2014, and is valid until April 30, 2034. The boundary was extracted from the NedraExpert portal at https://web.archive.org/web/20251215155358/https://www.nedraexpert.ru/license/161333?ysclid=mj7bthtgru309011861. The area between the Krasnobrodskoye and Vakhrushevskoye license boundaries is occupied by subsoil plots (including Karagailinskoye and Novosergeevskoye) classified as part of the Undistributed Subsoil Fund, indicating no active mining operations within this intervening area at the time of review. This was verified through the NedraExpert portal, https://web.archive.org/web/20251217220747/https://www.nedraexpert.ru/subsurface/2100027339/1, https://web.archive.org/web/20251217220845/https://www.nedraexpert.ru/subsurface/2100028211/1.

The approximate area of the resulting boundary is 3 square km.

M0812.P1 Identified visually from Google Earth Pro satellite imagery. Also verified through “Krasnobrodskaya-Koksovaya Coal Preparation Plant: Coal Liberation,” Mining Industry magazine, that coal from the Krasnobrodskoye field is processed at the Krasnobrodskaya-Koksovaya coal preparation plant, https://web.archive.org/web/20251219224214/https://dprom.online/processing/of-krasnobrodskaya-koksovaya-osvobozhdenie-uglya/?ysclid=mj7fas67x0329887500, 2019.
M0812.P2 Identified visually from Google Earth Pro satellite imagery. Also verified through “Krasnobrodskaya-Koksovaya Coal Preparation Plant: Coal Liberation,” Mining Industry magazine, that coal from the Vakhrushevskoye field field is processed at the Vakhrushevskoye coal preparation plant, https://web.archive.org/web/20251219224214/https://dprom.online/processing/of-krasnobrodskaya-koksovaya-osvobozhdenie-uglya/?ysclid=mj7fas67x0329887500, 2019.

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. ↑ https://web.archive.org/web/20240121033417/https://wikimapia.org/18392380/ru/%D0%9A%D1%80%D0%B0%D1%81%D0%BD%D0%BE%D0%B1%D1%80%D0%BE%D0%B4%D1%81%D0%BA%D0%B8%D0%B9-%D1%83%D0%B3%D0%BE%D0%BB%D1%8C%D0%BD%D1%8B%D0%B9-%D1%80%D0%B0%D0%B7%D1%80%D0%B5%D0%B7. Archived from the original on 21 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 https://www.rosnedra.gov.ru/article/12768.html. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 https://energybase.ru/coal-mine/krasnobrodsky-open-pit-mine. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.0 4.1 4.2 https://e-disclosure.ru/portal/files.aspx?id=10488&type=2. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 5.2 5.3 https://cyberleninka.ru/article/n/itogi-raboty-ugolnoy-promyshlennosti-rossii-za-yanvar-dekabr-2020-goda/viewer. {{cite web}}: Missing or empty |title= (help)
  6. ↑ 6.0 6.1 6.2 https://cyberleninka.ru/article/n/itogi-raboty-ugolnoy-promyshlennosti-rossii-za-yanvar-dekabr-2022-goda/viewer. {{cite web}}: Missing or empty |title= (help)
  7. ↑ 7.0 7.1 (PDF) https://web.archive.org/web/20240121004748/https://www.kru.ru/upload/medialibrary/87d/Otchyet2020_ENG_51.pdf. {{cite web}}: Missing or empty |title= (help)
  8. ↑ https://e-disclosure.ru/portal/FileLoad.ashx?Fileid=1795563. {{cite web}}: Missing or empty |title= (help)
  9. ↑ 9.0 9.1 https://cyberleninka.ru/article/n/itogi-raboty-ugolnoy-promyshlennosti-rossii-za-yanvar-dekabr-2018-goda/viewer. {{cite web}}: Missing or empty |title= (help)
  10. ↑ https://cyberleninka.ru/article/n/itogi-raboty-ugolnoy-promyshlennosti-rossii-za-yanvar-dekabr-2019-goda/viewer. {{cite web}}: Missing or empty |title= (help)
  11. ↑ https://e-disclosure.ru/portal/FileLoad.ashx?Fileid=1749912. {{cite web}}: Missing or empty |title= (help)
  12. ↑ https://o-v-o-s.ru/42/38469. {{cite web}}: Missing or empty |title= (help)
  13. ↑ (PDF) https://www.belovorn.ru/upload/iblock/190/en9xrq93d8ajtvfsapuakby4fwp3qdr5/482%20%D0%9F%D0%BE%D1%81%D1%82%D0%B0%D0%BD%D0%BE%D0%B2%D0%BB%D0%B5%D0%BD%D0%B8%D0%B5%20%E2%84%96%20%20%D0%BE%D1%82%20.12.2024%20%D0%B3.%20%28%D0%90%D0%9E%20%D0%A3%D0%9A%20%D0%9A%D0%A0%D0%A3%29.pdf. {{cite web}}: Missing or empty |title= (help)
  14. ↑ Kuzbassrazrezugol, Annual Report of Open Joint Stock Company "Coal Company "Kuzbassrazrezugol" 2017," page 3, Kuzbassrazrezugol, June 2018.
  15. ↑ "ОАО «УК «КУЗБАССРАЗРЕЗУГОЛЬ» ФИЛИАЛ «КРАСНОБРОДСКИЙ УГОЛЬНЫЙ РАЗРЕЗ»". mining-portal.ru.{{cite web}}: CS1 maint: url-status (link)
  16. ↑ "Годовой отчет 2022". e-disclosure.ru. 2023. {{cite web}}: horizontal tab character in |title= at position 14 (help)CS1 maint: url-status (link)
  17. ↑ "Годовой отчет 2023". www.e-disclosure.ru. July 2024.{{cite web}}: CS1 maint: url-status (link)
  18. ↑ "Энергетические мощности старейшего разреза Кузбасса выросли на треть". Kommersant. May 29, 2024. Retrieved Feb 20, 2026. {{cite web}}: line feed character in |title= at position 15 (help)CS1 maint: url-status (link)
  19. ↑ "Кузбассразрезуголь применил современный метод очистки сточных вод". Vnedra. November 26, 2020. Retrieved Feb 20, 2026.{{cite web}}: CS1 maint: url-status (link)
  20. ↑ "Землетрясение интенсивностью 5,3 балла: что произошло". sibkray.ru. January 26, 2022.{{cite web}}: CS1 maint: url-status (link)
  21. ↑ "В Кузбассе произошло ощутимое землетрясение". www.city-n.ru. March 2023.{{cite web}}: CS1 maint: url-status (link)
  22. ↑ 22.0 22.1 22.2 "ОБОСНОВЫВАЮЩАЯ ДОКУМЕНТАЦИЯ И ПРЕДВАРИТЕЛЬНАЯ ОЦЕНКА ВОЗДЕЙСТВИЯ НА ОКРУЖАЮЩУЮ СРЕДУ намечаемой деятельности в соответствии с проектной документацией Проект строительства участка Вахрушевский Глубокий" (PDF). 2020. {{cite web}}: line feed character in |title= at position 28 (help)CS1 maint: url-status (link)
  23. ↑ "ОВОС: ОБЩЕСТВЕННЫЕ СЛУШАНИЯ". o-v-o-s.ru. April 2022.{{cite web}}: CS1 maint: url-status (link)
  24. ↑ "Уведомление о проведении общественных обсуждений". December 2024.{{cite web}}: CS1 maint: url-status (link)
  25. ↑ "Материалы для ознакомления общественности". belovorn.ru. December 2024.{{cite web}}: CS1 maint: url-status (link)
  26. ↑ "Проект отработки запасов участка Краснобродский Глубокий... Вторая очередь". o-v-o-s.ru. January 16, 2025. Retrieved Feb 20, 2026.{{cite web}}: CS1 maint: url-status (link)