Kurdistan Steel Qorveh steel plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Kurdistan Steel Qorveh steel plant (شرکت صنایع فولاد کردستان, ایمیدرو), also known as IMIDRO, Kurdistan Steel Industry Company, Kurdistan Steel Bijar Steel Plant, is a steel plant in Bijar, Kurdistan, Iran that operates direct reduced iron (DRI) and electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Bijar, Kurdistan, Iran:

Loading map...
  • Location: Zanjan - Bijar Road, Bijar, Kurdistan Province, Iran
  • Coordinates (WGS 84): 35.936932, 47.762024 (exact)

Plant Details

Table 1: General Plant Details

Construction date Workforce size Power source Iron ore source
2022-07[1] 1600[1] 1.6 MW Qorveh electricity plant, Samnan Power Plant[2] Zanjan, Hamdan, and Bijar[2]

Table 2: Ownership and Parent Company Information

State-owned entity status Parent company Parent company PermID Parent GEM entity ID Owner Owner company PermID Owner GEM entity ID
Partial Iranian Mines & Mining Industries Development & Renovation Organization [44.0%]; Development and Equipment of Relief Mines Co [20.0%]; Sabanour Mining and Industrial Development Co [20.0%]; Sepahan Mines Kimia [16.0%] 5000935267 [44.0%]; unknown [20.0%]; 5086835623 [20.0%]; unknown [16.0%] E100000000547 [44.0%]; E100001016087 [20.0%]; E100001016086 [20.0%]; E100001016089 [16.0%] Kurdistan Steel Co [100%][2] 5079206878 E100000131119 [100%]

Table 3: Process and Products

Steel product category Steel products ISO 14001 ISO 50001 Responsible steel Main production equipment
crude, semi-finished[2] coil, hot rolled coil, slab[2][3] unknown unknown unknown DRI; EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
construction 1000[4][5] 1000[4][5]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Sponge iron/DRI capacity Nominal iron capacity (total)
construction 1600[2] 1600[2]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter Pellets
NF NF

Unit Details

Table 7: Direct Reduced Iron Furnace Details

Unit name Status Construction date Start date Furnace manufacturer and model Furnace type Current capacity (ttpa)
unknown DRI (1) construction[6] 2022-07[2] 2025[7] FIECO, MMTE PERED Megamodule[2][2] shaft furnace[2] 1600[2]

Table 8: Direct Reduced Iron Furnace Reductant Details

Unit name Current or initial reductant Gas reductant
unknown DRI (1) gas[2] syngas (reformed methane)[2]

Table 9: Electric Arc Furnace Details

Unit name Status Construction date Start date Furnace manufacturer and model Current capacity (ttpa)
unknown EAF (1) construction[4][5] 2020[4][8] 2027[2] IRITECH[2] 1000[4][5]

Table 10: Electric Arc Furnace Feedstock Details

Unit name Scrap-based
unknown EAF (1) None

Articles and Resources

Additional data

To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://hamrahcompany.com/kurdistan-steel-industries/. {{cite web}}: Missing or empty |title= (help)
  2. 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 https://mmdic.ir/6945/. {{cite web}}: Missing or empty |title= (help)
  3. https://felezatkhavarmianeh.ir/fa/news/16192/%D8%B9%D9%85%D9%84%DB%8C%D8%A7%D8%AA-%D8%A7%D8%AC%D8%B1%D8%A7%DB%8C-%DA%A9%D8%AF%D8%A7%D9%85-%D8%B7%D8%B1%D8%AD-%D9%87%D8%A7%DB%8C-%D8%B2%D9%86%D8%AC%DB%8C%D8%B1%D9%87-%D9%81%D9%88%D9%84%D8%A7%D8%AF-%D8%AF%D8%B1-%DA%A9%D8%B1%D8%AF%D8%B3%D8%AA%D8%A7%D9%86-%D8%A7%D8%BA%D8%A7%D8%B2-%D9%85%DB%8C-%D8%B4%D9%88%D8%AF. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 https://donya-e-eqtesad.com/%D8%A8%D8%AE%D8%B4-%DA%A9%D8%B3%D8%A8-%DA%A9%D8%A7%D8%B1-104/4186054-%D8%A8%D8%A7%D8%B2%D8%AF%DB%8C%D8%AF-%D9%88%D8%B2%DB%8C%D8%B1-%D8%B5%D9%85%D8%AA-%D8%A7%D8%B2-%DA%86%D9%87%D8%A7%D8%B1-%D9%BE%D8%B1%D9%88%DA%98%D9%87-%D9%85%D8%B9%D8%AF%D9%86%DB%8C-%DA%A9%D8%B1%D8%AF%D8%B3%D8%AA%D8%A7%D9%86. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 https://web.archive.org/web/20240912172715/https://www.oecd.org/en/topics/industry-business-and-entrepreneurship.html. Archived from the original (PDF) on 2024-09-12. {{cite web}}: Missing or empty |title= (help)
  6. "2022 World Direct Reduction Statistics" (PDF). Midrex. 2023-09-12. Archived from the original (PDF) on 2023-11-03.
  7. https://www.ilna.ir/%D8%A8%D8%AE%D8%B4-%D8%AA%D9%88%D9%84%DB%8C%D8%AF-%D8%AA%D8%AC%D8%A7%D8%B1%D8%AA-%D8%AE%D8%AF%D9%85%D8%A7%D8%AA-32/1703649-%D9%BE%DB%8C%D8%B4%D8%B1%D9%81%D8%AA-%D9%BE%D8%B1%D9%88%DA%98%D9%87-%D8%B9%D8%B8%DB%8C%D9%85-%D9%81%D9%88%D9%84%D8%A7%D8%AF-%DA%A9%D8%B1%D8%AF%D8%B3%D8%AA%D8%A7%D9%86-%D8%AF%D8%B1-%D9%82%D8%A7%D8%A8-%D8%AA%D8%B5%D9%88%DB%8C%D8%B1-%D8%A2%D8%BA%D8%A7%D8%B2-%D9%85%D8%B1%D8%AD%D9%84%D9%87-%D8%AF%D9%88%D9%85-%D9%86%D8%B5%D8%A8-%D8%A7%D8%AC%D8%B2%D8%A7%D8%A1-%DA%A9%D9%88%D8%B1%D9%87. {{cite web}}: Missing or empty |title= (help)
  8. https://borna.news/fa/news/2225801/%D9%88%D8%B2%DB%8C%D8%B1-%D8%B5%D9%85%D8%AA-%D8%A7%D8%B2-%DA%A9%D8%A7%D8%B1%D8%AE%D8%A7%D9%86%D9%87-%D9%86%D9%88%D8%B1%D8%AF-%D9%81%D9%88%D9%84%D8%A7%D8%AF%DB%8C-%D9%82%D8%B1%D9%88%D9%87-%D8%A8%D8%A7%D8%B2%D8%AF%DB%8C%D8%AF-%DA%A9%D8%B1%D8%AF. {{cite web}}: Missing or empty |title= (help)

Resources