Las Lajitas Coal Mine
| This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
| Related-articles: |
Las Lajitas Coal Mine (Mina Las Lajitas) is a shelved coal mine in Rafael Urdaneta, Aragua, Venezuela.
Location
Table 1: Project-level location details
| Mine Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Las Lajitas Coal Mine | Rafael Urdaneta, Aragua, Venezuela | 9.518954, -66.750943 (approximate) |
The map below shows the approximate location of the coal mine:
Project Details
Table 2: Project status
| Status | Status Detail | Project Type | Opening Year | Closing Year |
|---|---|---|---|---|
| Shelved[1] | Pre-Permit[1] | New | – | – |
Table 3: Operation details
| Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
|---|---|---|---|---|---|---|---|
| 0.9[1] | – | – | Surface | Open Pit | – | 50* | – |
Table 4: Coal resources and destination
| Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
|---|---|---|---|---|---|---|
| – | – | – | – | Subbituminous | Thermal | Other Industrial[2] |
Table 5: Ownership and parent company
| Owner | Parent Company | Headquarters |
|---|---|---|
| Corporación Venezolana de Minería [100.0%] | Corporación Venezolana de Minería | Venezuela |
Note: The above sections were automatically generated and are based on data from the Global Coal Mine Tracker August 2026 release.
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The Las Lajitas Mine is a shelved coal mine project in the municipality of Rafael Urdaneta, Taguay parish, Aragua state, Venezuela. The project was sponsored by the Corporación Venezolana de Minería (CVM) in partnership with unnamed Venezuelan private investors.
The Las Lajitas deposit lies within the carboniferous belt of southern Aragua, one of several coal-bearing zones identified by Venezuela's Ministry of Ecological Mining Development.[3]
In June 2019, President Nicolás Maduro announced an initial investment of €71 million in a public-private partnership to develop Las Lajitas as part of the Plan Sectorial Minero 2019–2025. At the time, the project was in early exploration phase, with international reserve certification as the immediate objective. Long-term plans called for production of 1 million tonnes per year and projected annual revenues of €45 million. Coal from the mine was intended primarily for the CVM's Lomas de Níquel industrial operations in Aragua state, with the remainder for domestic and international markets.[4]
No subsequent reporting confirmed that reserve certification or production targets were achieved. The GEM Coal Mine Tracker classified the project as shelved as of its May 2025 release.
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 (PDF) http://www.minci.gob.ve/wp-content/uploads/2019/06/Lanzamiento-del-Plan-Nacional-Minero-2019-2025.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://ecopoliticavenezuela.org/la-mineria-arrasa-miles-hectareas-carabobo-aragua/.
{{cite web}}: Missing or empty|title=(help) - ↑ "Potencialidades". Ministerio del Poder Popular de Desarrollo Minero Ecológico. Retrieved Mar 23, 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ "La minería arrasa miles de hectáreas en Carabobo y Aragua". Observatorio de Ecología Política de Venezuela. September 2, 2019. Retrieved Mar 23, 2026.
{{cite web}}: CS1 maint: url-status (link)
