Lloyds Metals and Energy Ltd Konsari steel plant
| This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
Lloyds Metals and Energy Ltd Konsari steel plant, also known as Konsari Steel Plant, LMEL Unit 2, is a steel plant in Konsari, Gadchiroli, Maharashtra, India that operates blast furnace (BF), basic oxygen furnace (BOF), and direct reduced iron (DRI) technology.
Location
The map below shows the exact location of the plant in Konsari, Gadchiroli, Maharashtra, India:
- Location: Plot No. A-1, Chamorshi Industrial Area, Konsari, Gadchiroli- 442707, Maharashtra, India
- Coordinates (WGS 84): 19.770409, 79.813599 (exact)
Background
Lloyds Metals & Energy Ltd. (LMEL) was incorporated in 1977 as a steel manufacturing company. In 1994 LMEL commissioned the 1st part of the Ghugus Unit (Unit 1) and began our production, with an annual capacity of 150 thousand metric tonnes.[1] LMEL began operations of the Konsari steel plant in 2023 with an annual production capacity of 72 thousand metric tonnes per annum (ttpa).[2]
In 2021, the company proposed expansion of Iron Ore Beneficiation from 63 ttpa to 2,00,000TPA, Sponge Iron capacity to 459 ttpa by installing additional 2X100 TPD and 2X500 TPD), Captive Power Plant (WHRB) (4 MW to 22 MW and New 15 MW AFBC).[3] The company also plans addition of steelmaking capacity of 3000 ttpa using basic oxygen furnace route to be commissioned by 2030.[4][5]
The company commissioned a pellet plant of capacity 4 mtpa at the Konsari plant in June 2025.[6]
In October 2025, the company announced an investment of INR 250 million to set up a 4.5 mtpa blast furnace at the Konsari plant by 2027-28.[7]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Announced date | Construction date | Start date | Workforce size | Power source | Iron ore source | Coal source |
|---|---|---|---|---|---|---|
| 2018[8] | 2022-07[8] | 2023[9][10][11] | 1100[10] | 4 MW Captive power plant; 28.2 MW Wind and Solar power from Hexa Energy[10][12] | LMEL Surjagarh Mine (P100000128896)[13] | Western Coalfields Ltd[13] |
Table 2: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| Lloyds Metals and Energy Ltd [100.0%] | 4295874250 [100.0%] | E100001012204 [100.0%] | Lloyds Metals and Energy Ltd [100%][14] | 4295874250 | E100001012204 [100%] |
Table 3: Process and Products
| ISO 14001 | ISO 50001 | Main production equipment |
|---|---|---|
| unknown | unknown | BF; DRI; BOF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|
| announced | 3000[15] | 3000[15] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Blast furnace capacity | Sponge iron/DRI capacity | Nominal iron capacity (total) |
|---|---|---|---|
| announced | 4500[16] | 396[17] | 4896[16][17] |
| operating | – | 72[11][10] | 72[11][10] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
| Pellets |
|---|
| 4000[18] |
Table 7: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
| Year | DRI production | Total (all routes) |
|---|---|---|
| 2023 | unknown | – |
| 2024 | 63[19] | 63[19] |
Unit Details
Table 8: Blast Furnace Details
| Unit name | Status | Announced date | Start date | Current capacity (ttpa) |
|---|---|---|---|---|
| unknown BF (1) | announced[16] | 2025-07-17[20] | 2028[16] | 4500[16] |
Table 9: Direct Reduced Iron Furnace Details
| Unit name | Status | Start date | Furnace type | Current capacity (ttpa) |
|---|---|---|---|---|
| unknown DRI (1) | operating[9][10][21] | 2023[9] | rotary kiln | 36[10][11] |
| unknown DRI (2) | operating[21][9][10][11] | 2023 | rotary kiln[13] | 36[10][11] |
| unknown DRI (3) | announced[17] | 2030[22] | rotary kiln[13] | 33[17] |
| unknown DRI (4) | announced[17] | 2030[22] | rotary kiln[13] | 33[17] |
| unknown DRI (5) | announced[17] | 2030[22] | rotary kiln[13] | 165[17] |
| unknown DRI (6) | announced[17] | 2030[22] | rotary kiln[13] | 165[17] |
Table 10: Direct Reduced Iron Furnace Reductant Details
| Unit name | Current or initial reductant |
|---|---|
| unknown DRI (1) | coal (solid)[13] |
| unknown DRI (2) | coal (solid)[13] |
| unknown DRI (3) | coal (solid)[13] |
| unknown DRI (4) | coal (solid)[13] |
| unknown DRI (5) | coal (solid)[13] |
| unknown DRI (6) | coal (solid)[13] |
Table 11: Basic Oxygen Furnace Details
| Unit name | Status | Start date | Current capacity (ttpa) |
|---|---|---|---|
| unknown BOF (1) | announced[17][23] | 2030[22] | 3000[15] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "Company History: A Legacy of Success and Innovation". Lloyds Metals & Energy Ltd. Retrieved 2025-01-21.
- ↑ "Transforming Steel Industry: Introducing Konsari Steel Plant at Lloyds Metals". Lloyds Metals & Energy Ltd. Retrieved 2025-01-21.
- ↑ "Executive Summary" (PDF). mpcb.gov.in. 2021. Retrieved 2025-01-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "47th Integrated Annual Report of Lloyds Metals and Energy Limited for the F.Y. 2023-24" (PDF). BSE India. 2024-07-26. Retrieved 2025-01-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ www.youtube.com https://www.youtube.com/supported_browsers?next_url=https%3A%2F%2Fwww.youtube.com%2Fwatch%3Fv%3D-csHDINOFv8&ab_channel=LloydsMetals&EnergyLimited. Retrieved 2025-01-21.
{{cite web}}: Missing or empty|title=(help) - ↑ "Transforming Steel: Konsari Steel Plant at Lloyds Metals". lloyds.in. Retrieved 2025-10-10.
- ↑ "Lloyds Metals to Build Rs 250 billion Steel Plant in Gadchiroli". www.constructionworld.in. Retrieved 2025-11-04.
- ↑ 8.0 8.1 https://web.archive.org/web/20240111020857/https://www.drvijaymalik.com/lloyds-metals-energy/. Archived from the original on 2024-01-11.
{{cite web}}: Missing or empty|title=(help) - ↑ 9.0 9.1 9.2 9.3 https://web.archive.org/web/20240111023856/https://timesofindia.indiatimes.com/city/nagpur/shah-to-open-dri-plant-at-gchiroli-on-december-8/articleshow/105740400.cms. Archived from the original on 2024-01-11.
{{cite web}}: Missing or empty|title=(help) - ↑ 10.0 10.1 10.2 10.3 10.4 10.5 10.6 10.7 10.8 https://web.archive.org/web/20241008155704/https://www.lloyds.in/unit-2-konsari/. Archived from the original on 2024-10-08.
{{cite web}}: Missing or empty|title=(help) - ↑ 11.0 11.1 11.2 11.3 11.4 11.5 (PDF) https://web.archive.org/web/20240111023839/https://www.ventura1.com/Calltracking/FundamentalCalls/26062023094415Lloyd_Metal_&_Energy_Ltd___26th_Jun_2023.pdf. Archived from the original (PDF) on 2024-01-11.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.saurenergy.com/solar-energy-news/maharashtra-lloyds-sign-deal-to-get-28-2-mw-re-from-hexa.
{{cite web}}: Missing or empty|title=(help) - ↑ 13.00 13.01 13.02 13.03 13.04 13.05 13.06 13.07 13.08 13.09 13.10 13.11 13.12 https://web.archive.org/web/20240111042018/https://environmentclearance.nic.in/DownloadPfdFile.aspx?FileName=wqXKkbms0InScwctGWj1xgyXlEF+l7y+wd6qMJBeKHEhUo5AZ9ma1Qus45KMMZHpqcPGSD4GQwgnEnC3Er4Trhcslb1NIbFiudcHQr%2F05DUltvbmNy2T3WVJWGt1daUa&FilePath=93ZZBm8LWEXfg+HAlQix2fE2t8z%2FpgnoBhDlYdZCxzUlDadBGu7t8v4JoQvNU6UBlSmL0YQ7WQYaxkvlQvexKQ==. Archived from the original on 2024-01-11.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20240111004809/https://www.lloyds.in/. Archived from the original on 2024-01-11.
{{cite web}}: Missing or empty|title=(help) - ↑ 15.0 15.1 15.2 https://web.archive.org/web/20240916182550/https://lloyds.in/manufacturing-units/. Archived from the original on 2024-09-16.
{{cite web}}: Missing or empty|title=(help) - ↑ 16.0 16.1 16.2 16.3 16.4 https://www.constructionworld.in/steel-news/lloyds-metals-to-build-rs-250-billion-steel-plant-in-gadchiroli/79967.
{{cite web}}: Missing or empty|title=(help) - ↑ 17.00 17.01 17.02 17.03 17.04 17.05 17.06 17.07 17.08 17.09 17.10 (PDF) https://web.archive.org/web/20240111014508/https://mpcb.gov.in/sites/default/files/public_hearing/exe_summary/2021-07/LloyardKonsariexeEnglishSummary06072021.pdf. Archived from the original (PDF) on 2024-01-11.
{{cite web}}: Missing or empty|title=(help) - ↑ https://lloyds.in/operations/konsari/.
{{cite web}}: Missing or empty|title=(help) - ↑ 19.0 19.1 (PDF) https://lloyds.in/wp-content/uploads/2025/05/Annual-Report-for-Financial-Year-2024-25.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.taxtmi.com/news?id=49727.
{{cite web}}: Missing or empty|title=(help) - ↑ 21.0 21.1 https://www.livemint.com/market/stock-market-news/lloyds-metals-energy-this-small-cap-stock-turned-rs-1-lakh-into-rs-85-lakh-in-just-4-years-11724035466760.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 22.0 22.1 22.2 22.3 22.4 https://www.youtube.com/watch?v=-csHDINOFv8&ab_channel=LloydsMetals%26EnergyLimited.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://www.bseindia.com/xml-data/corpfiling/Attachhis/c484283b-cdca-4a7f-9423-8de95301dfb6.pdf.
{{cite web}}: Missing or empty|title=(help)