Longhua Baicheng power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Longhua Baicheng power station (国电吉林龙华白城热电厂, 国能吉林白城热电厂扩建4×660MW常规+1×660MW新一代煤电项目) is an operating power station of at least 400-megawatts (MW) in Dianchang Road, Taobei, Baicheng, Jilin, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Longhua Baicheng power station | Dianchang Road, Taobei, Baicheng, Jilin, China | 45.6331636, 122.8793335 (exact) |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2, Unit 3, Unit 4, Unit 5, Unit 6, Unit 7: 45.6331636, 122.8793335
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| Unit 1 | Operating | coal: unknown[1] | 200 | subcritical | yes | 2011 | False |
| Unit 2 | Operating | coal: unknown[1] | 200 | subcritical | yes | 2011 | False |
| Unit 3 | Shelved[2] | coal: unknown[1][2] | 660[2] | unknown | yes[2] | – | False |
| Unit 4 | Shelved[2] | coal: unknown[1][2] | 660[2] | unknown | yes[2] | – | False |
| Unit 5 | Shelved[2] | coal: unknown[1][2] | 660[2] | unknown | yes[2] | – | False |
| Unit 6 | Shelved[2] | coal: unknown[1][2] | 660[2] | unknown | yes[2] | – | False |
| Unit 7 | Shelved[2] | coal: unknown[1][2] | 660[2] | unknown | yes[2] | – | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Guoneng Jilin Longhua Thermal Power Co Ltd Baicheng Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
| Unit 2 | Guoneng Jilin Longhua Thermal Power Co Ltd Baicheng Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
| Unit 3 | Guoneng Jilin Longhua Thermal Power Co Ltd Baicheng Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
| Unit 4 | Guoneng Jilin Longhua Thermal Power Co Ltd Baicheng Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
| Unit 5 | Guoneng Jilin Longhua Thermal Power Co Ltd Baicheng Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
| Unit 6 | Guoneng Jilin Longhua Thermal Power Co Ltd Baicheng Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
| Unit 7 | Guoneng Jilin Longhua Thermal Power Co Ltd Baicheng Thermal Power Plant [100%] | China Energy Investment Corp [82.9%]; Jilin Mingmen Electric Power Industry Group Co [9.0%]; Guodian Jilin Longhua Thermoelectricity Co Ltd [7.7%]; unknown [0.4%] |
Project-level coal details
- Coal source(s): domestic
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Longhua Baicheng power station is a two-unit coal-fired power plant with a total capacity of 400 MW in Jilin Province. The plant was completed in 2011, and was originally owned by China Guodian.[3][4]
Phase II Units 3-7 had a preliminary feasibility report review in July 2024[5]. No further news emerged, and the project was shelved in April 2026[6].
Ownership
On August 28, 2017, China's State-owned Assets Supervision and Administration Commission of the State Council (SASAC) announced that China Guodian Corporation and Shenhua Group will be jointly restructured. Shenhua Group will become China National Energy Investment Group and will absorb China Guodian Corporation. It will be the largest power company in the world by installed capacity, as well as the world's largest coal producer.[7][8] The merger was completed on November 28, 2017.[9]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 "吉林白城热电厂扩建4×660MW常规+1×660MW煤电项目初可研报告评审会召开-北极星火力发电网". news.bjx.com.cn. 2024-07-01. Archived from the original on 2024-07-12. Retrieved 2024-07-04.
- ↑ "Unit 1 of Guodian Longhua's Baicheng Thermal Power Plant Begins Operations," Industrial Info Resources, December 20, 2011
- ↑ "白城热电厂2×200MW扩建工程实现双投," China Guodian, 2011-12-30
- ↑ "吉林白城热电厂扩建项目初可研报告评审会". 北极星电力网. 2024-07-01. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "白城热电厂扩建项目搁置". 北极星电力网. 2026-04-15. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Factbox: Shenhua and Guodian - China's latest state marriage". Reuters. 29 August 2017. Retrieved 30 August 2017.
- ↑ "China Is Creating the World's Largest Power Company". Bloomberg News. 28 August 2017. Retrieved 29 August 2017.