Metinvest Piombino steel plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Metinvest Piombino steel plant, also known as Piombino steel plant, Digital Green Steel, is a steel plant in Piombino, Province of Livorno, Italy that operates direct reduced iron (DRI) and electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Piombino, Province of Livorno, Italy:

Loading map...
  • Location: Largo Caduti sul Lavoro, 21 57025 Piombino (LI), Italy
  • Coordinates (WGS 84): 42.93652, 10.537794 (exact)

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Low-emissions/green steelmaking

This steel plant is associated with a green steel project tracked in the Green Steel Tracker. Details about the project are included below.

Table 1: Green Steel Project Details

All references for the above data are available in the Green Steel Tracker.
Project 1
Project name Metinvest DRI-EAF Plant Piombino
Company Metinvest Holding LLC
Company has climate goals? Yes
Location Piombino, Italy
Project website Not available
Project scale Full scale
Project status Announced
Technology to be used NG-DRI + EAF
Technology details Fully integrated metallurgical
Iron production capacity (million tonnes per year) Not applicable
Steel production capacity (million tonnes per year) 2
CO2 capture (million tonnes CO2 per year) Not applicable
Hydrogen generation capacity (MW) Not applicable
Investment size (m USD) 2689
Partners Danieli, Italy’s Ministry of Economic Development (Mimit), Jsw Steel Italy
Date of announcement 1/22/2024

Plant Details

Table 2: General Plant Details

Announced date Construction date Start date Workforce size
2024-01[1][2] 2025[3] 2027[1] 1500[4]

Table 3: Ownership and Parent Company Information

Parent company Parent company PermID Parent GEM entity ID Owner Owner company PermID Owner GEM entity ID
Metinvest BV [75.0%]; Danieli & C Officine Meccaniche SpA [25.0%] 5000056845 [75.0%]; 4295875649 [25.0%] E100001000605 [75.0%]; E100000130706 [25.0%] Metinvest Adria SpA [100%][5] 5095935447 E100002021566 [100%]

Table 4: Process and Products

Steel product category Steel products Main production equipment
finished rolled[1] coil[1] DRI; EAF

Table 5: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
construction 3000[1][2] 3000[1][2]

Table 6: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Sponge iron/DRI capacity Nominal iron capacity (total)
construction 0[1] 0[1]

Unit Details

Table 7: Direct Reduced Iron Furnace Details

Unit name Status Announced date Construction date Start date Furnace manufacturer and model Furnace type Current capacity (ttpa)
unknown DRI (1) construction[6][7] 2024-01[1][2] 2025-07[7] 2027[1] Danieli[2] not found 0[1]

Table 8: Direct Reduced Iron Furnace Reductant Details

Unit name Current or initial reductant
unknown DRI (1) unknown

Table 9: Electric Arc Furnace Details

Unit name Status Announced date Construction date Start date Furnace manufacturer and model Current capacity (ttpa)
unknown EAF (1) construction[5] 2024-01[1][2] 2025-07[3][5] 2027[1] Danieli[2] 3000[1][2]

Table 10: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap % DRI % HBI % sponge iron (unknown if DRI or HBI) % basic/merchant pig iron % granulated pig iron % pig iron (unknown if basic/merchant or granulated) % other iron
unknown EAF (1) yes[8] >0[8] >0[8] unknown unknown unknown unknown >0[8] unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 https://web.archive.org/web/20240212200516/https://www.kallanish.com/en/news/steel/market-reports/article-details/metinvest-italian-gov-and-danieli-sign-agreement-for-piombino-0124/. Archived from the original on 2024-02-12. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://web.archive.org/web/20240212201057/https://www.fdiintelligence.com/content/news/azovstals-owner-commits-to-22bn-green-steelworks-in-italy-83361. Archived from the original on 2024-02-12. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://odessa-journal.com/metinvest-will-begin-construction-of-a-green-steel-production-plant-in-italy-in-2025. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20240212202012/https://www.steelorbis.com/steel-news/latest-news/metinvest-and-danieli-ink-deal-to-boost-production-at-piombino-italy-1323955.htm. Archived from the original on 2024-02-12. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 https://eurometal.net/program-agreement-signed-to-revitalize-piombino-steel-hub-in-italy/. {{cite web}}: Missing or empty |title= (help)
  6. https://gmk.center/en/news/metinvest-plans-to-build-a-green-steel-plant-in-piombino-ceo/. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 https://gmk.center/en/news/metinvest-secures-key-agreements-for-green-steel-plant-in-italy/. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 https://eurometal.net/metinvest-moves-ahead-with-new-green-steel-facility-in-italy-2/. {{cite web}}: Missing or empty |title= (help)

Resources