Mianeh Steel East Azerbaijan steel plant

From Global Energy Monitor
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor.
Sub-articles:

Mianeh Steel East Azerbaijan steel plant is a 1000-thousand tonnes per annum (ttpa) electric arc furnace (EAF) steel plant in East Azerbaijan, in Iran. Mianeh Steel East Azerbaijan operates a electric arc furnace (EAF).

Location

The map below shows the approximate location of the steel plant in Mianeh, in Iran.

Loading map...

Background

The Mianeh Steel East Azerbaijan steel plant was anticipated to be completed in 2021.[1] However, as of February 2022, it is still under construction.

Plant Details

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 "LATEST DEVELOPMENTS IN STEELMAKING CAPACITY - 2021" (PDF). OECD. Archived (PDF) from the original on January 27, 2022. Retrieved January 27, 2022.
  2. 2.0 2.1 "پورتال - Company". NISCO. Retrieved 2022-03-09.
  3. 3.0 3.1 3.2 3.3 "MIYANEH STEEL COMPLEX NISCO invests in six-strand billet casting machine from SMS Concast_SMS". SMS Group. Retrieved 2022-03-09.
  4. "MIYANEH Steel Making Project". KDD Group. Retrieved 2022-03-09.

Other resources