Mine 3 Coal Project is a proposed coal mine in Little Baguio, Imelda, Zamboanga Sibugay, Philippines.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Mine 3 Coal Project Little Baguio, Imelda, Zamboanga Sibugay, Philippines 7.681905, 122.991976 (approximate)

The map below shows the approximate location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Project Type Opening Year Closing Year
Proposed Construction New 2023

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
Underground 393 *

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
Subbituminous Thermal

Table 5: Ownership and parent company

Owner Parent Company Headquarters
PNOC Exploration Corp Philippine National Oil Company [PNOC] Philippines

Note: The above section was automatically generated and is based on data from the GEM April 2024 Global Coal Mine Tracker dataset.

Background

Mine 3 Coal Project (also known as COC 41) is an under-construction, underground coal mine in Little Baguio, Imelda, Zamboanga Sibugay, Philippines.[1] Mine 3 project is included in the Coal Operating Contract 41 (COC 41). The Department of Energy of the Philippines (DOE) has granted an 18-year extension of COC 41 on 22 June 2012 valid until 13 August 2030.[2]

According to PNOC's 2021 annual report, all of Mine 3's surface buildings and facilities have been constructed.[1] Coal production was scheduled to start in 2022, however, as there is no public news confirming this occurrence, production appears to be delayed.

In 2022, PNOC EC continued to conduct mine development activities in Mine 3, including constructing underground access to targeted coal deposits. Towards the latter part of 2022, PNOC-EC completed a 2D Land Seismic Reflection Survey on Mine 3 area of COC 41.[2]

A media source from May 2023 stated that PNOC-EC expected to start production at Mine 3 in the second half of 2023.[3] As of February 2024, PNOC-EC was looking for contractors to supply timber for the project.[4] It therefore appeared that the mine was not yet operating.

The proposed capacity of Mine 3 development was not known, as of March 2024.

  • Owner Philippine National Oil Company Exploration Corporation (PNOC-EC)
  • Parent Company: Philippine National Oil Company (PNOC)
  • Location Little Baguio, Imelda Municipality, Zamboanga Sibugay Province, Philippines
  • Coordinates 7.6819, 122.9920 (approximate)
  • Mine Status: Proposed (Construction)
  • Start Year: 2024[3][4]
  • Production Capacity:
  • Total Resource:
  • Mineable Reserves:
  • Coal Type: Subbituminous
  • Mine Type: Underground
  • Mine Size:
  • Workforce Size:
  • Source of Financing:

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 Annual Report, PNOC, 2021.
  2. 2.0 2.1 "PNOC-Exploration Company 2022 Annual report". www.pnoc-ec.com.p. 2023.{{cite web}}: CS1 maint: url-status (link)
  3. 3.0 3.1 "PNOC-EC confident in continued viability of drilling in SC 38". www.bworldonline.com. May 2023.{{cite web}}: CS1 maint: url-status (link)
  4. 4.0 4.1 "SUPPLY AND DELIVERY OF TIMBERS FOR MINE 3 COAL PROJECT". www.pnoc-ec.com.ph/. February 2024.{{cite web}}: CS1 maint: url-status (link)