Mine at Binh Minh is an operating coal mine in Lot 11, Cai Lan Industrial Park, Bai Chay Ward, Ha Long City, Quang Ninh Province, Vietnam, Ha Long, Quang Ninh, Vietnam.
Location
Table 1: Project-level location details
| Mine Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Mine at Binh Minh | Lot 11, Cai Lan Industrial Park, Bai Chay Ward, Ha Long City, Quang Ninh Province, Vietnam, Ha Long, Quang Ninh, Vietnam[1][2] | 10.495854, 105.035433 (approximate) |
The map below shows the approximate location of the coal mine:
Project Details
Table 2: Project status
| Status | Status Detail | Opening Year | Closing Year |
|---|---|---|---|
| Operating[3] | – | 2010[3] | 2026[3] |
Table 3: Operation details
| Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
|---|---|---|---|---|---|---|---|
| – | 1[4] | 2023[4] | Underground[5] | Longwall[6] | 14.3[7] | 220[3] | 756.2728133* |
Table 4: Coal resources and destination
| Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
|---|---|---|---|---|---|---|
| 81.817[7] | 2024[7] | – | Quang Ninh[8] | Lignite[9] | Thermal[5] | – |
Table 5: Ownership and parent company
| Owner | Parent Company | Headquarters |
|---|---|---|
| Hon Gai Coal Company [100.0%][5] | Vietnam National Coal (Vinacomin) | Vietnam |
Table 6: Historical production (unit: million tonnes per annum)
| ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|---|---|---|---|
| ROM | – | 1 | 1 | 1 | 1 | 1[4] | 1[4] | – | – |
Expansion/Extension
Table 7: Project status
| Status | Status Detail | Project Type | Project Phase | Added Capacity (Mtpa)* | Start Year |
|---|---|---|---|---|---|
| Proposed[3] | Construction[10] | Expansion[3] | – | 0.5[3] | 2026[10] |
Note: The above sections were automatically generated and are based on data from the Global Coal Mine Tracker August 2026 release.
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The Mine at Binh Minh is a coal mine in Ha Long City, Quang Ninh Province, Vietnam, operated by Hon Gai Coal Company, a subsidiary of the state-owned Vietnam National Coal – Mineral Industries Group (Vinacomin/TKV).[11] The mine has operated as a surface pit since 2010 at the -75 to -220 metre level, entering a declining-output phase expected to conclude in 2026.[11] It sits within the wider Quang Ninh coal basin, described in a 2022 geological study as containing medium-to-thick coal seams of variable thickness.[12]
To sustain output, Hon Gai Coal Company broke ground in November 2023 on an underground project mining below the -220 metre level, licensed under permit No. 369/GP-BTNMT.[13] The project has a total investment of 1,100 billion VND, raw coal reserves of about 9 million tonnes, a design capacity of 500,000 tonnes per year, and a planned 21-year mine life at the -220 to -350 metre level, worked via two longwalls (one mechanized, capacity 300,000–350,000 t/yr; one chock-shield, 200,000–250,000 t/yr), with raw coal delivered directly to Hon Gai Coal Preparation Company.[11][13]
As of mid 2025, the project was on track to bring its first mechanized longwall into production in early 2026 and its second in 2027, reaching full design capacity; it is one of several underground developments TKV has pursued in Quang Ninh as surface-mine output regionwide continues to decline.[14][15]
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ https://binhminhhp.com/lien-he/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://baotainguyenmoitruong.vn/mo-than-binh-minh-quang-ninh-dinh-huong-tham-do-va-khai-thac-o-muc-sau-hon-321594.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 https://web.archive.org/web/20260701053013/https://baochinhphu.vn/khoi-cong-du-an-khai-thac-xuong-sau-duoi-muc-220-mo-binh-minh-102231105100059162.htm. Archived from the original on 01 July 2026.
{{cite web}}: Check date values in:|archive-date=(help); Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 (PDF) https://yadda.icm.edu.pl/baztech/element/bwmeta1.element.baztech-6d76b2ea-1fb5-4a0e-b638-ae98c6692874/c/IM_2-2021-v1-a34.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 https://web.archive.org/web/20260707050654/https://baoquangninh.vn/day-nhanh-tien-do-cac-du-an-mo-trong-diem-3331526.html. Archived from the original on 07 July 2026.
{{cite web}}: Check date values in:|archive-date=(help); Missing or empty|title=(help) - ↑ https://web.archive.org/web/20260520164926/https://congdoantkv.vn/tin-tuc/chi-tiet/39152/Cong-ty-Than-Hon-Gai---TKV-khoi-cong-Du-an-%E2%80%9CKhai-thac-xuong-sau-duoi-muc--220-mo-Binh-Minh%E2%80%9D. Archived from the original on 20 May 2026.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 7.2 https://web.archive.org/web/20260521185104/https://nangluongvietnam.vn/phuong-an-khai-thac-than-khu-trung-tam-mo-binh-minh-13186.html. Archived from the original on 21 May 2026.
{{cite web}}: Missing or empty|title=(help) - ↑ https://jmes.humg.edu.vn/en/archives?article=1440.
{{cite web}}: Missing or empty|title=(help) - ↑ https://vusta.vn/mot-so-van-de-nghien-cuu-khai-thac-mo-than-binh-minh-khoai-chau-hung-yen-thuoc-be-tham-dong-bang-song-hong-p77780.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 10.0 10.1 https://soha.vn/dao-sau-duoi-muc-220-mo-binh-minh-dot-pha-duoi-long-dat-tai-du-an-nghin-ty-1982506091019517.htm.
{{cite web}}: Missing or empty|title=(help) - ↑ 11.0 11.1 11.2 Linh Đan (2023-11-05). "Khởi công Dự án khai thác xuống sâu dưới mức -220 mỏ Bình Minh". Báo Điện tử Chính phủ. Retrieved 2026-09-04.
{{cite web}}: CS1 maint: url-status (link) - ↑ Do, An Manh (2022-04-05). "Establishing mining deposit groups and exploration grid patterns in the Binh Minh Coal Mine, Quang Ninh Province by using Geo-mathematical models". Journal of Mining and Earth Sciences. Retrieved 2026-09-04.
{{cite web}}: CS1 maint: url-status (link) - ↑ 13.0 13.1 "Công ty Than Hòn Gai - TKV khởi công Dự án "Khai thác xuống sâu dưới mức -220 mỏ Bình Minh"". Công đoàn Than - Khoáng sản Việt Nam. 2023-11-05. Retrieved 2026-09-04.
{{cite web}}: CS1 maint: url-status (link) - ↑ Pha Lê (2025-06-09). "Đào sâu dưới mức -220 mỏ Bình Minh: Đột phá dưới lòng đất tại dự án nghìn tỷ". Soha. Retrieved 2026-09-04.
{{cite web}}: CS1 maint: url-status (link) - ↑ Phạm Tăng (2024-11-27). "Đẩy nhanh tiến độ các dự án mỏ trọng điểm". Báo Quảng Ninh điện tử. Retrieved 2026-09-04.
{{cite web}}: CS1 maint: url-status (link)