Mine at Khe Cham 3
| This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
| Related-articles: |
Mine at Khe Cham 3 is an operating coal mine in Mong Duong, Van Don District, Quang Ninh, Vietnam, Van Don, Quang Ninh, Vietnam.
Location
Table 1: Project-level location details
| Mine Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Mine at Khe Cham 3 | Mong Duong, Van Don District, Quang Ninh, Vietnam, Van Don, Quang Ninh, Vietnam[1][2] | 21.58, 104.77 (exact) |
The map below shows the exact location of the coal mine:
Project Details
Table 2: Project status
| Status | Status Detail | Opening Year | Closing Year |
|---|---|---|---|
| Operating[3] | – | 2013[4] | – |
Table 3: Operation details
| Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
|---|---|---|---|---|---|---|---|
| 2.5[5] | 1.825[6] | 2024[6] | Underground[7] | Longwall[8] | – | 275[9] | 2322.521853* |
Table 4: Coal resources and destination
| Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
|---|---|---|---|---|---|---|
| – | – | – | Cam Pha[10] | Anthracite[11] | Thermal[11] | – |
Table 5: Ownership and parent company
| Owner | Parent Company | Headquarters |
|---|---|---|
| Khe Cham Coal Company [100.0%][12] | Vietnam National Coal (Vinacomin) | Vietnam |
Table 6: Historical production (unit: million tonnes per annum)
| ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|---|---|---|---|
| ROM[13] | – | – | – | 2.5[13] | 2.5[13] | – | – | 1.82[6] | – |
Note: The above sections were automatically generated and are based on data from the Global Coal Mine Tracker August 2026 release.
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Mine at Khe Cham 3 (Khe Chàm III) is an underground longwall coal mine in Mông Dương, Vân Đồn District, Quảng Ninh Province, Vietnam, operated by Khe Cham Coal Company – TKV.[14] The mine was designed with a capacity of 2.5 million tonnes per year and is accessed via a pair of inclined shafts roughly 1.6 kilometers long, descending at a 12-degree grade from the surface (elevation +25 m) to a depth of -300 m.[15] Construction began in early 2006, and the mine's first coal was extracted on November 10, 2013, at an initial investment of over 2,200 billion Vietnamese đồng.[15] The mine produces anthracite, the coal type characteristic of the wider Quảng Ninh coalfield, which holds the large majority of Vietnam's coal reserves.[16]
As of a 2021 industry survey, Khe Cham III was one of only 11 underground mines nationally with a large-deposit designation and comprehensive mining infrastructure and technology, each producing 1.0 million tonnes per year or more; the mine's reported capacity was listed at 2.5 million tonnes per year, comparable to other major underground operations such as Vang Danh (3.7 million tonnes), Nam Mau (2.5 million tonnes) and Khe Tam (2.5 million tonnes).[17]
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ https://www.google.com/maps/place/Khe+Cham+Coal+Mine+lll/@21.0623759;107.2992125.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.google.com/maps/place/Khe+Cham+Coal+Mine+lll/@21.0633529;107.2965708;3635m/data=!3m1!1e3!4m6!3m5!1s0x314b020f6a92e8f7:0x9c50ed01ffe20ac5!8m2!3d21.0623759!4d107.2991511!16s%2Fg%2F1tdkjpyy!5m1!1e2?entry=ttu&g_ep=EgoyMDI1MTExMS4wIKXMDSoASAFQAw%3D%3D;1127m/data=!3m2!1e3!4b1!4m6!3m5!1s0x314b020f6a92e8f7:0x9c50ed01ffe20ac5!8m2!3d21.0623759!4d107.2991511!16s%2Fg%2F1tdkjpyy?entry=ttu&g_ep=EgoyMDI1MDMxOC4wIKXMDSoASAFQAw%3D%3D.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20260701053426/https://nangluongvietnam.vn/gan-bien-cong-trinh-he-thong-giam-sat-va-dieu-khien-tu-dong-hoa-mo-than-khe-cham-iii-34694.html. Archived from the original on 01 July 2026.
{{cite web}}: Check date values in:|archive-date=(help); Missing or empty|title=(help) - ↑ Exploiting the first ton of coal at Khe Cham III new mine | Vietnam Energy Magazine (nangluongvietnam.vn)
- ↑ (PDF) https://bibliotekanauki.pl/articles/2020194.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 6.2 https://web.archive.org/web/20260701053346/https://vinacomin.vn/vi/news/slug/than-khe-cham-hoan-thanh-vuot-muc-ke-hoach-san-xuat-ngay-ngay-dau-nam. Archived from the original on 01 July 2026.
{{cite web}}: Check date values in:|archive-date=(help); Missing or empty|title=(help) - ↑ CVv149S22021009.pdf (vista.gov.vn)
- ↑ https://web.archive.org/web/20260520165414/https://tienphong.vn/tong-thong-nga-putin-roi-trung-quoc-khep-lai-chuyen-tham-keo-dai-24-gio-dong-ho-post1845003.tpo. Archived from the original on 20 May 2026.
{{cite web}}: Missing or empty|title=(help) - ↑ Exploiting the first ton of coal at Khe Cham III new mine | Vietnam Energy Magazine (nangluongvietnam.vn)
- ↑ https://web.archive.org/web/20260521185313/https://nongnghiepmoitruong.vn/khu-mo-khe-cham-quang-ninh-chinh-xac-hoa-cau-truc-dia-chat-khu-mo-d675130.html. Archived from the original on 21 May 2026.
{{cite web}}: Missing or empty|title=(help) - ↑ 11.0 11.1 https://thuanhai.com.vn/news/market-news/vietnam-coal-overview-and-outstanding-features.html.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20260707051329/https://cmhgroup.vn/. Archived from the original on 07 July 2026.
{{cite web}}: Check date values in:|archive-date=(help); Missing or empty|title=(help) - ↑ 13.0 13.1 13.2 (PDF) https://yadda.icm.edu.pl/baztech/element/bwmeta1.element.baztech-6d76b2ea-1fb5-4a0e-b638-ae98c6692874/c/IM_2-2021-v1-a34.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ "Gắn biển công trình 'Hệ thống giám sát và điều khiển tự động hóa mỏ than Khe Chàm III'". Tạp chí Năng lượng Việt Nam. 2025-08-19. Retrieved 2026-09-10.
{{cite web}}: CS1 maint: url-status (link) - ↑ 15.0 15.1 "Khai thác tấn than đầu tiên tại mỏ mới Khe Chàm III". Tạp chí Năng lượng Việt Nam. 2013-11-11. Retrieved 2026-09-10.
{{cite web}}: CS1 maint: url-status (link) - ↑ "VIETNAMESE COAL: Overview And Outstanding Features". Thuan Hai Corporation. Retrieved 2026-09-10.
{{cite web}}: CS1 maint: url-status (link) - ↑ Nguyen, Quynh Nga; Nguyen, Van Hau; Pham, Tu Phuong; Chu, Thi Khanh Ly (2021). "Current Status of Coal Mining and Some Highlights in the 2030 Development Plan of Coal Industry in Vietnam" (PDF). Journal of the Polish Mineral Engineering Society. 1 (2): 373–380. doi:10.29227/IM-2021-02-34. Retrieved 2026-09-10.
{{cite journal}}: CS1 maint: url-status (link)
