Mine at Mao Khe

From Global Energy Monitor
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

Mine at Mao Khe is an operating coal mine in Mao Khe Ward, Dong Trieu District, Quang Ninh, Vietnam, Dong Trieu, Quang Ninh, Vietnam.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Mine at Mao Khe Mao Khe Ward, Dong Trieu District, Quang Ninh, Vietnam, Dong Trieu, Quang Ninh, Vietnam[1][2] 21.07, 106.62 (approximate)

The map below shows the approximate location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Opening Year Closing Year
Operating[3] – 1954[4] 2048 (planned)[5]

Table 3: Operation details

Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
– 2.5[3] 2025[3] Underground & Surface[5] Mixed[6] – 400[7] 3900[8]

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
52 – – Uong Bi[1] Anthracite[9] Thermal[9] –

Table 5: Ownership and parent company

Note: To access more comprehensive data on energy ownership, please visit the Global Energy Ownership Tracker.
Owner Parent Company Headquarters
Mao Khe Coal Company [100.0%][10] Vietnam National Coal (Vinacomin) Vietnam

Table 6: Historical production (unit: million tonnes per annum)

ROM or Saleable 2017 2018 2019 2020 2021 2022 2023 2024 2025
ROM – 1.75[11] 1.72[12] 1.9[13] 1.85[13] 2.08[14] 2.3[15] – 2.5[3]

Note: The above sections were automatically generated and are based on data from the Global Coal Mine Tracker August 2026 release.

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

Mine at Mao Khe is operated by Mao Khe Coal Company, a subsidiary of Vietnam National Coal (Vinacomin), in Vietnam.[16] The Mao Khe mine is operated by Mao Khe Coal Company, a subsidiary of Vietnam National Coal (Vinacomin).[16]

The mine has been in operation since 1954 and produces anthracite thermal coal.[17] It uses both underground and surface mining methods.[18] In 2025, the company reported production results and continued operations.[19] The mine has approximately 3,900 workers and a capacity of 1.6 Mtpa.[20] The Mao Khe Thermal Power Plant sources coal from Mao Khe, Trang Bach, Khe Chuoi, and Hong Thai mines.[21]

In December 2023, the Ministry of Natural Resources and Environment issued License No. 586/GP-BTNMT to Mao Khe Coal Company for the open-pit exploitation of the Mao Khe coal seams.[22] The investment project to expand open-pit mining at the Mao Khe coal seams covers a total area of 70.7 hectare(ha), comprising a mining area of 43.8 ha and a waste dump area of 26.9 ha; 43 households are expected to be relocated from areas at risk of landslides and flooding in Mao Khe and Yen Tho wards.[22] The project involves mining from the seam outcrop to a depth of -50 m, with a reserve of over 1.72 million tonnes of coal, a capacity of 250,000 tonnes of raw coal per year, and a mining duration of 8 years.[22] In the first two months of 2024, open-pit coal output reached 10,000 tonnes.[22]

  • Operator: Mao Khe Coal Company
  • Owner: Vietnam National Coal (Vinacomin)
  • Location: Vietnam
  • GPS Coordinates: 21.07, 106.62 (approximate)
  • Status: Operating[23]
  • Production Capacity: 1.6 mtpa[16][24]
  • Total Resource:
  • Mineable Reserves: 59 million tonnes [25]
  • Coal type: Bituminous
  • Mine Size:
  • Mine Type: Underground & Surface[26]
  • Start Year:
  • Source of Financing:

Related GEM.wiki articles

Extension

In 2019, coal at shallow levels of the mine was exhausted. In order to maintain the mine, Vinacomin assigned Mao Khe company to implement the Mao Khe project to exploit pit mining below depths of 150 meters. Mining operations at this level were expected to generate coal starting in 2021.[27]

The project, which has a planned capacity of 2 million tons per year and an expected life time of 32 years, was first proposed in November 2014.[27]

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 https://thuanhai.com.vn/news/market-news/vietnam-coal-overview-and-outstanding-features.html. {{cite web}}: Missing or empty |title= (help)
  2. ↑ https://vnr500.com.vn/Thong-tin-doanh-nghiep/CONG-TY-TNHH-MTV-THAN-MAO-KHE--VINACOMIN-Chart--1451-2016.html. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 3.3 https://web.archive.org/web/20260701053809/https://congdoantkv.vn/tin-tuc/chi-tiet/43061/Cong-ty-than-Mao-Khe-phan-%C4%91au-hoan-thanh-nhiem-vu-thang-3-quy-II2025. Archived from the original on 01 July 2026. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. ↑ https://nangluongvietnam.vn/cong-ty-than-mao-khe-nhin-lai-nam-2024-33671.html. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 https://www.globaldata.com/data-insights/mining/vietnam--five-largest-surface-and-underground-mines-in-2090926/. {{cite web}}: Missing or empty |title= (help)
  6. ↑ https://web.archive.org/web/20260520165630/https://baoquangninh.vn/de-khai-thac-hieu-qua-lo-thien-cac-lo-via-mo-mao-khe-3286226.html. Archived from the original on 20 May 2026. {{cite web}}: Missing or empty |title= (help)
  7. ↑ https://web.archive.org/web/20260521210146/https://www.researchgate.net/publication/339851116_The_status_and_prospect_of_mining_technology_in_Vietnam_underground_coal_mines. Archived from the original on 21 May 2026. {{cite web}}: Missing or empty |title= (help)
  8. ↑ https://web.archive.org/web/20260527033112/https://nhandan.vn/phat-trien-nganh-than-ben-vung-hieu-qua-post909046.html. Archived from the original on 27 May 2026. {{cite web}}: Missing or empty |title= (help)
  9. ↑ 9.0 9.1 (PDF) https://coal.jogmec.go.jp/info/docs/05_002397.pdf. {{cite web}}: Missing or empty |title= (help)
  10. ↑ https://web.archive.org/web/20260707051810/https://vinacomin.vn/vi/news/slug/cong-bo-cac-quyet-dinh-ve-cong-tac-can-bo-lanh-dao-cong-ty-than-mao-khe-tkv. Archived from the original on 07 July 2026. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  11. ↑ https://baoquangninh.vn/cong-ty-than-mao-khe-day-manh-san-xuat-cuoi-nam-2403205.html. {{cite web}}: Missing or empty |title= (help)
  12. ↑ https://tapchicongthuong.vn/truyen-thong-65-nam-than-mao-khe--duoc-phat-huy-nho--3-hoa-67811.htm. {{cite web}}: Missing or empty |title= (help)
  13. ↑ 13.0 13.1 https://congdoantkv.vn/tin-tuc/chi-tiet/25568/Cong-ty-than-Mao-Khe-trien-khai-nhiem-vu-SXKD-nam-2021. {{cite web}}: Missing or empty |title= (help)
  14. ↑ https://nangluongvietnam.vn/2022-la-nam-dau-tien-than-mao-khe-san-xuat-tren-2-trieu-tan-than-30120.html. {{cite web}}: Missing or empty |title= (help)
  15. ↑ https://quangninh.gov.vn/chuyen-de/chuyendoiso/Trang/ChiTietTinTuc.aspx?nid=134451. {{cite web}}: Missing or empty |title= (help)
  16. ↑ 16.0 16.1 16.2 Van How Pham, Xuan Nam But, Van Quyen Le, The The Hot Le, and Van Viet Pham, "Estimation of Truck-Shovel Dispatching in Car Son Open Pit Coal Mine and the Ability in Applying Information Technology for Increasing Its Efficiency", Journal of the Polish Mineral Engineering Society, February 2020:21:27
  17. ↑ "Vietnam coal overview and outstanding features". Thuan Hai. Retrieved 2026-09-10.{{cite web}}: CS1 maint: url-status (link)
  18. ↑ "The status and prospect of mining technology in Vietnam underground coal mines". ResearchGate. Retrieved 2026-09-10.{{cite web}}: CS1 maint: url-status (link)
  19. ↑ "Công ty than Mạo Khê phấn đấu hoàn thành nhiệm vụ tháng 3 quý II/2025". Công đoàn TKV. 2025. Retrieved 2026-09-10.{{cite web}}: CS1 maint: url-status (link)
  20. ↑ "Phát triển ngành than bền vững, hiệu quả". Nhân Dân. Retrieved 2026-09-10.{{cite web}}: CS1 maint: url-status (link)
  21. ↑ "Công ty Than Mạo Khê nhìn lại năm 2024". Năng lượng Việt Nam. 2025. Retrieved 2026-09-10.{{cite web}}: CS1 maint: url-status (link)
  22. ↑ 22.0 22.1 22.2 22.3 "Để khai thác hiệu quả lộ thiên các lộ vỉa mỏ Mạo Khê". Báo Quảng Ninh. 2024-02-28. Retrieved 2026-09-10.{{cite web}}: CS1 maint: url-status (link)
  23. ↑ M.G. Mustafin, Tran Thanh-Son, Tran Manh-Hung, Comprehensive impact assessment development of the Coal field Campha in Vietnam to the coastal territory,IOP Conference Series: Materials Science and Engineering 698 (2019)
  24. ↑ Chu Thi Que, Marina Nevskaya, Oksana Marinina, Coal Mines in Vietnam: Geological Conditions and Their Influence on Production Sustainability Indicators, Sustainability, 26 October 2021
  25. ↑ Vietnam Energy Online, "Starting the Underground mining project below -150 of Mao Khe mine", Nanloung Vietnam website, Accessed June 2021
  26. ↑ Global Data,"Vietnam: Five Largest Surface and Underground Mines in 2021", Accessed October 2023
  27. ↑ 27.0 27.1 "Mao Khe project with a pit level of -150m will generate coal in 2021", Vietnam Energy Online, 25 October 2019.