Mukand Sumi Special Steel Hospet steel plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Mukand Sumi Special Steel Hospet steel plant is a steel plant in Kanakapur, Ginigera, Koppal, Karnataka, India that operates blast furnace (BF) and steelmaking technology.

Location

The map below shows the exact location of the plant in Kanakapur, Ginigera, Koppal, Karnataka, India:

Loading map...
  • Location: Hospet
  • Coordinates (WGS 84): 15.328976, 76.258613 (exact)

Background

In August 2021, Mukand Sumi Special Steel Limited (MSSSL) shifted its manufacturing activities entirely to Hospet (Karnataka) by commissioning a new 400 ttpa facility. MSSSL was earlier operating from its 500 ttpa Kalwe unit in Thane (Maharashtra). From August 2022, the alloy steel business of Mukand Sumi Metal Processing Limited (MSMPL) was merged into MSSSL.[1]

MSSL announced that it will invest INR 2,345 crore to set up a greenfield project in Hospet, which will increase its production capacity to 700 ttpa.[2]

MSSSL has placed an order with Danieli for a new blooming mill, which will be installed at its Hospet plant in September 2025. It is expected to be operational by the end of 2026.[3]

Plant Details

Table 1: General Plant Details

Start date
2021-08[4]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent GEM entity ID Owner Owner company PermID Owner GEM entity ID
Jamnalal Sons Pvt Ltd [51.0%]; Sumitomo Corp [49.0%] 5037050765 [51.0%]; 5000000997 [49.0%] E100002007558 [51.0%]; E100000000657 [49.0%] Mukand Sumi Special Steel Ltd [100%][5] 5064525055 E100002019744 [100%]

Table 3: Process and Products

Steel product category Steel products ISO 14001 ISO 50001 Main production equipment
finished rolled[6] bars, wire rod[7][6] yes[8] no[8] BF; Steel other/unspecified

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Other/unspecified steelmaking capacity Nominal crude steel capacity (total)
announced 250[9] 250[9]
operating 450[10] 450[10]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Blast furnace capacity Nominal iron capacity (total)
operating 450[6][10] 450[6][10]

Table 6: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year Other/unknown steel production Total (all routes)
2022 unknown[11] [11]
2023 358[11] 358[11]
2024 350[8] 350[8]

Table 7: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)

Year BF production
2022 unknown
2023 unknown
2024 unknown

Unit Details

Table 8: Blast Furnace Details

Unit name Status Furnace manufacturer and model Current size Current capacity (ttpa)
unknown BF (1) operating[6] Mini blast furnace[6] 250.0[6] 132[6][10]
unknown BF (2) operating[6] Mini blast furnace[6] 250.0[6] 132[6][10]
unknown BF (3) operating[6] Mini blast furnace[6] 350.0[6] 186[6][10]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "Mukand Sumi Special Steel Limited: Rating upgraded; rated amount enhanced". ICRA Ratings. 2024-01-05. Retrieved 2025-11-05.{{cite web}}: CS1 maint: url-status (link)
  2. "Mukand Sumi Special Steel to invest Rs 2,300 cr in greenfield project in Karnataka". The Economic Times. Retrieved 2025-11-05.
  3. "Danieli". www.danieli.com. Retrieved 2025-11-05.
  4. https://www.icra.in/Rating/ShowRationalReportFilePdf/124674. {{cite web}}: Missing or empty |title= (help)
  5. https://www.steelorbis.com/steel-news/latest-news/indias-msssl-plans-agreenfield-special-steel-production-facility-in-karnataka-1407714.htm. {{cite web}}: Missing or empty |title= (help)
  6. 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 6.14 6.15 https://www.mukandsumi.com/manufacturing-processes/. {{cite web}}: Missing or empty |title= (help)
  7. (PDF) https://www.mukandsumi.com/wp-content/uploads/2025/09/Press_Note_MSSSL_Expansion_Project.pdf. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 (PDF) https://www.mukand.com/wp-content/uploads/2025/07/Mukand-Limited_Final-low-2025.pdf. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 https://economictimes.indiatimes.com/industry/indl-goods/svs/steel/mukand-sumi-special-steel-to-invest-rs-2300-cr-in-greenfield-project-in-karnataka/articleshow/123636640.cms?from=mdr. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 10.4 10.5 10.6 https://www.mukandsumi.com/alloy-manufacturing-plant-india/. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 11.3 https://www.mukand.com/investors/financial-performance/. {{cite web}}: Missing or empty |title= (help)