30em

📝 Help us learn how people like you use GEM Wiki! Take this short survey!📝

Data will be retained following our Privacy Policy. The survey is completed in Google Forms (Privacy policy and Terms of Service)

Pakar North Coal Mine

From Global Energy Monitor
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

Pakar North Coal Mine is a proposed coal mine in Kutai Kartanegara, East Kalimantan, Indonesia.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Pakar North Coal Mine Kutai Kartanegara, East Kalimantan, Indonesia 0.576564, 116.019118 (approximate)

The map below shows the approximate location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Project Type Opening Year Closing Year
Proposed Pre-Permit New

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
5.5 Surface Open Pit 137.0 50.0*

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
911.0 Kutai Lignite Thermal

Table 5: Ownership and parent company

Note: To access more comprehensive data on energy ownership, please visit the Global Energy Ownership Tracker.
Owner Parent Company Headquarters
Kangaroo Resources Pty Ltd [100%][1][2] PT Bayan Resources Tbk [100.0%] Indonesia

Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker May 2025 release.

Background

The Pakar North coal mine is a proposed open-pit coal mine, operated by Kangaroo Resources, a subsidiary of Bayan Resources, located in the Tabang concession, Kutai Kartanegara Regency, East Kalimantan, Indonesia.[3][4] Pakar North is part of the Kangaroo Resources (a wholly-owned subsidiary of Bayan Resources) Tabang Project. It consists of three coal mines in the exploration phase: Tiwa Abadi, Tanur Jaya and Dermaga Energi.[3][4]

  • Owner: Kangaroo Resources Limited
  • Parent company: Bayan Resources
  • Location: Tabang concession, Kutai Kartanegara Regency, East Kalimantan, Indonesia.
  • GPS coordinates: 0.576564, 116.019118
  • Mine status: Operating[3]
  • Start year: 2020/2021[3]
  • Mineable reserves: 236 million tons
  • Coal type: sub-bituminous
  • Mine size: 13,784 hectacres[3][4]
  • Mine type: Surface[3]
  • Production:
  • Additional proposed production:
  • Equipment:  
  • Number of employees:

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. (PDF) https://web.archive.org/web/20240125050404/https://www.bayan.com.sg/cfind/source/files/investor/investor-update/bayan%20group%20corporate%20profile%20_june%202021.pdf. Archived from the original (PDF) on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240723010532/https://www.bayan.com.sg/reserve-resources. Archived from the original on 23 July 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 Bayan Resources Company Profile March 2019 Organizational document, March 2019
  4. 4.0 4.1 4.2 Alexander Ginting (Publisher), Robert Sihotang (Project Leader), Reiner Simanjuntak, Johannes Simbolon, Tyasno Hery, Rudi Simangunsong, Adianto Simamora, Godang Sitompul, Romel S., Yuda Prihatna, Abdul Karim, lpunk AF [Paper Copy, Indonesian Coal Book 2016/2017] Petromindo.Com, May 2016 Release