Payra LNG Terminal was a proposed LNG terminal in Bangladesh. It was cancelled in August 2022.

Location

The terminal was proposed to be located in Kalapara Upazila - Patuakhali District, Barisal Division, Bangladesh.

Loading map...

Project details

  • Operator:
  • Owner:
  • Parent company: Government of Bangladesh[1]
  • Location: Payra Port, Kalapara Upazila - Patuakhali District, Barisal Division, Bangladesh[1]
  • Coordinates: 21.999205, 90.305597 (exact)
  • Capacity: 7.5 mtpa[1]
  • Status: Cancelled[2]
  • Type: Export/Import
  • Start year:
  • Cost:
  • Financing:
  • FID Status:
  • Associated infrastructure: Payra LNG power station

Background

The import terminal was proposed to supply fuel to the Payra LNG power station.[1] They were proposed in 2017.[2]

In August 2022, the Bangladesh government cancelled the power station, and the LNG terminal is presumed to be cancelled as well.[2] The Payra LNG FSRU offshore import terminal is also proposed and appears to be unaffected by the cancellation of the onshore terminal.

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 "3600MW LNG-based power plant at Payra on cards". The Business Standard. 2019-07-25. Retrieved 2022-08-18.
  2. 2.0 2.1 2.2 Mohiuddin. "Govt backtracks from LNG-fired power plant". Prothomalo. Retrieved 2022-08-18.