Qinzhou power station (国投钦州电厂) is a 3,360-megawatt (MW) coal-fired power plant in Guangxi Zhuang Autonomous Region, China.

An additional 1,320 MW is proposed.

Location

The map below shows the location of the plant, in Qinnan District, Qinzhou Prefecture, Guangxi Zhuang Autonomous Region.

Loading map...

Background on Plant

The first two coal-fired units of Qinzhou power station, totaling 1,260 MW, were brought online in 2007. The plant is owned by State Development & Investment Corporation (SDIC).[1][2]

In 2012, SDIC said it planned to add two additional coal-fired units at the plant with a total planned capacity of 2,100 MW. The units are projected to be completed in 2015.[3][4]

The two units were completed by September 2016, along with the Qinzhou Port Coal Terminal at Beibu Gulf Port.[5] [6]

Expansion

In March 2020, a 2 x 1,000MW coal-fired expansion at the power station was listed as a preliminary project in the Guangxi "Energy Network Infrastructure Plan 2020-2022" (《广西“能源网”基础设施建设大会战实施方案(2020-2022年)》).[7]

In December 2020, one new 660 MW unit was permitted for construction at the power station. Another 660 MW unit is proposed.[8]

Plant Details for Units 1-4

  • Sponsor: SDIC Huajing Power Holdings Co
  • Parent company: SDIC
  • Location: Qinnan District, Qinzhou Prefecture, Guangxi Zhuang Autonomous Region, China
  • Coordinates: 21.7004655, 108.6243063 (exact)
  • Status: Operating
  • Gross capacity: 3,360 MW (Units 1 & 2: 630 MW, Units 3 & 4: 1,050 MW)
  • Type: Supercritical (Units 1 & 2), Ultra-Supercritical (Units 3 & 4)
  • Start year: 2007 (Units 1 & 2), 2016 (Units 3 & 4)
  • Coal type:
  • Coal source:
  • Source of financing:

Project Details for Units 5 & 6 Expansion

  • Sponsor: SDIC Huajing Power Holdings Co
  • Parent company: SDIC
  • Location: Qinnan District, Qinzhou Prefecture, Guangxi Zhuang Autonomous Region, China
  • Coordinates: 21.7004655, 108.6243063 (exact)
  • Status: Permitted (Unit 5), Pre-permit development (Unit 6)
  • Gross capacity: 1,320 MW (Units 5 & 6: 660 MW)
  • Type: Ultra-Supercritical
  • Start year:
  • Coal type: Bituminous
  • Coal source:
  • Source of financing:

Articles and resources

References

  1. "国投钦州发电有限公司"SDIC
  2. "国投钦州发电一期工程正式竣工投产"BJX News, 2007-12-04
  3. "国投钦州电厂二期工程启动暨国投钦州港煤码头工程开工仪式隆重举行", 国家开发投资公司, 2012-10-18
  4. "国投电力:钦州电厂二期扩建工程获发改委核准", 网易财经, 2014-07-24
  5. "国投钦州电厂二期投产、煤炭码头重载试车成功,龙门风电项目启动," SDIC, Sep 12, 2016
  6. "广西钦州电厂二期扩建工程3号机组顺利通过168小时试运行," China Energy Engineering Group Guangdong Electric Power Design Institute Co, 2016-8-01
  7. "总投资445.6亿元!广西2020-2022年将推进7个煤电项目," Sohu, 2020-03-04
  8. "国投钦州电厂三期1号机组项目获得核准批复 - 北极星火力发电网". news.bjx.com.cn. 2020-12-31. Retrieved 2021-01-05.

Related GEM.wiki articles

External resources