Rashmi Metaliks Kharagpur steel plant, also known as RML Kharagpur, is a steel plant in Kharagpur, Shyamraipur, West Medinipur, West Bengal, India that operates blast furnace (BF) and induction furnace (IF) technology.

Location

The map below shows the exact location of the plant in Kharagpur, Shyamraipur, West Medinipur, West Bengal, India:

Loading map...
  • Location: Village Gokulpur, P.O. Shyamraipur, P.S. Kharagpur (Local), District West Medinipur, West Bengal, India
  • Coordinates (WGS 84): 22.360664, 87.295932 (exact)

Background

The plant operates a mini blast furnace and steel melting shop comprising of induction furnaces.[1] A public hearing was held in August 2024 regarding the proposed expansion of the plant to increase blast furnace capacity to 550 ttpa, and steel melting shop to 830 ttpa by addition of four 25 tonne induction furnaces.[2]

As of October 2025, there has been no update on the expansion of the plant.

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Plant Details

Table 1: General Plant Details

Start date Power source Iron ore source Coal source
2004[3] One captive power plant (25 MW)[4] Barbil-Joda, Odisha[5] BCCL, Dhanbad or imported[5]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent GEM entity ID Owner Owner company PermID Owner GEM entity ID
Rashmi Metaliks Ltd [100.0%] 4298375168 [100.0%] E100000130890 [100.0%] Rashmi Metaliks Ltd [100%][3] 4298375168 E100000130890 [100%]

Table 3: Process and Products

Steel product category Steel products ISO 14001 Main production equipment
crude, semi-finished, finished rolled[3] wire rod, bar, pipe, billet, pig iron, DRI, di pipe[3][6] Expired[7] BF; IF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Induction furnace steelmaking capacity Nominal crude steel capacity (total)
announced 332[5] 332[5]
operating 498[8] 498[8]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Blast furnace capacity Nominal iron capacity (total)
operating 500[9] 500[9]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Ferronickel Sinter Pellets
>0[3] 600[8] 2100[3]

Table 7: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)

Year BF production
2019 unknown
2020 unknown
2021 unknown
2022 unknown
2023 unknown
2024 unknown

Unit Details

Table 8: Blast Furnace Details

Unit name Status Start date Current size Current capacity (ttpa) Decarbonization technology
unknown BF (1) operating[4][3] 2007[4] 450.0[5] 500[9] unknown

Table 9: Induction Furnace Details

Unit name Status Announced date Current capacity (ttpa) Current size
unknown IF (1) operating[8] 34[8] 8.0 tonnes[8][3]
unknown IF (10) announced[9] 2024[5] 83[5] 25.0 tonnes[5]
unknown IF (11) announced[9] 2024[5] 83[5] 25.0 tonnes[5]
unknown IF (2) operating[8] 34[8] 8.0 tonnes[8][3]
unknown IF (3) operating[8] 86[8] 20.0 tonnes[8][3]
unknown IF (4) operating[8] 86[8] 20.0 tonnes[8][3]
unknown IF (5) operating[8] 86[8] 20.0 tonnes[8][3]
unknown IF (6) operating[8] 86[8] 20.0 tonnes[8][3]
unknown IF (7) operating[8] 86[8] 20.0 tonnes[8][3]
unknown IF (8) announced[9] 2024[5] 83[5] 25.0 tonnes[5]
unknown IF (9) announced[9] 2024[5] 83[5] 25.0 tonnes[5]

Table 10: Induction Furnace Feedstock Details

Unit name Scrap-based % scrap % DRI % basic/merchant pig iron
unknown IF (1) yes[5] 6.02[5] 90.82[5] 3.15[5]
unknown IF (10) None unknown
unknown IF (11) None unknown
unknown IF (2) yes[5] 6.02[5] 90.82[5] 3.15[5]
unknown IF (3) yes[5] 6.02[5] 90.82[5] 3.15[5]
unknown IF (4) yes[5] 6.02[5] 90.82[5] 3.15[5]
unknown IF (5) yes[5] 6.02[5] 90.82[5] 3.15[5]
unknown IF (6) yes[5] 6.02[5] 90.82[5] 3.15[5]
unknown IF (7) yes[5] 6.02[5] 90.82[5] 3.15[5]
unknown IF (8) None unknown
unknown IF (9) unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. "A pre-feasibility report for 2, 50,000 TPA Rolling Mill for manufacturing Wire, Wire Rod & TMT Bars" (PDF). Environmentclearance.nic.in. 2016-12-22. Retrieved 2024-12-11.{{cite web}}: CS1 maint: url-status (link)
  2. "Proceedings of public hearing" (PDF). West Bengal Pollution Control Board. 2024-08. Retrieved 2024-12-11. {{cite web}}: Check date values in: |date= (help)CS1 maint: url-status (link)
  3. 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 https://web.archive.org/web/20240125061050/https://www.rashmigroup.com/rashmi-metaliks-ltd/. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 https://web.archive.org/web/20220112195421/http://rml.careersitemanager.com/about-us/. Archived from the original on 2022-01-12. {{cite web}}: Missing or empty |title= (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 5.15 5.16 5.17 5.18 5.19 5.20 5.21 5.22 5.23 5.24 5.25 5.26 5.27 5.28 5.29 5.30 5.31 5.32 5.33 5.34 5.35 5.36 5.37 5.38 5.39 5.40 5.41 5.42 5.43 5.44 (PDF) https://web.archive.org/web/20240905170715/https://www.wbpcb.gov.in/writereaddata/files/Executive%2520Summary_RML.pdf. Archived from the original (PDF) on 2024-09-05. {{cite web}}: Missing or empty |title= (help)
  6. https://www.youtube.com/watch?v=T4-xu-B_UHU&ab_channel=RashmiMetaliksLimited. {{cite web}}: Missing or empty |title= (help)
  7. https://rashmimetaliks.com/certifications/. {{cite web}}: Missing or empty |title= (help)
  8. 8.00 8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 8.09 8.10 8.11 8.12 8.13 8.14 8.15 8.16 8.17 8.18 8.19 8.20 8.21 8.22 8.23 (PDF) https://web.archive.org/web/20240111025221/https://environmentclearance.nic.in/writereaddata/modification/Amendment/Attach_file/22122016EO1FVWY5PFR.pdf. Archived from the original (PDF) on 2024-01-11. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 9.5 9.6 (PDF) https://www.wbpcb.gov.in/files/Fr-06-2024-06-19-09PH_Rashmi%20Metaliks.pdf. {{cite web}}: Missing or empty |title= (help)

Resources