SAIL Rourkela steel plant
| This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
SAIL Rourkela steel plant, also known as RSP, is a steel plant in Rourkela, Sundargarh, Odisha, India that operates blast furnace (BF) and basic oxygen furnace (BOF) technology.
Location
The map below shows the exact location of the plant in Rourkela, Sundargarh, Odisha, India:
- Location: Rourkela Steel Plant Area, Rourkela, Odisha 769011, India
- Coordinates (WGS 84): 22.210804, 84.86895 (exact)
Background
SAIL has Maharatna CPSE (Central Public Sector Enterprise) status by the Government of India under the Ministry of Steel.[1] Air quality monitoring information provided on the SAIL website here.
Rourkela Steel plant is the first integrated steel plant in the public sector in India. It was set up with German collaboration with an installed capacity of 1 mtpa. The first blast furnace of the plant became operational on 03 February 1959. After subsequent phases of expansion the plant reached a hot metal capacity of 4.5 mtpa and crude steel capacity of 4.2 mtpa.[2] Under SAIL's Vision 2030 programme, the company plans to raise the plant's capacity to 8.8 mtpa.[3]
Expansion plans
On 30 March 2022, SAIL received environmental clearance for expansion of hot metal production capacity from 4.5 mtpa to 4.855 mtpa and crude steel production from 4.2 mtpa to 4.85 mtpa. This expansion involves installation of coke oven battery, a third steel meting shop, decommissionin gof two existing BOFs and augmentation of existing blast furnaces in addition to other auxiliary developments.[4]
As of May 2023, the project was indefinitely deferred owing to illegal encroachments and failure to rehabilitate the settlers.[5] In August 2024, Ministry of Steel announced that the capacity of the Rourkela Steel Plant will soon be enhanced to 9 mtpa from 4.5 mtpa.[6] The expansion will cost an estimated INR 30,000 crores.[7]
Decarbonization initiatives
In FY 2024-25, a waste heat recovery system was installed in BF-5 Stoves resulting in increase of Hot Blast Temperature by around 400°C, thereby leading to reduction in Coke rate by about 4 kg/thm.[8]
Primetals Technologies and RSP are collaborating on several initiatives, including, hydrogen-based steel production, digitalization, gas treatment, and CCUS.[8]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Low-emissions/green steelmaking
This steel plant is associated with a green steel project tracked in the Green Steel Tracker. Details about the project are included below.
Table 1: Green Steel Project Details
| Project 1 | |
|---|---|
| Project name | SAIL Biochar Plant Odisha |
| Company | Steel Authority of India Ltd. (SAIL) |
| Company has climate goals? | Yes |
| Location | Odisha, India |
| Project website | Not available |
| Project scale | Pilot |
| Project status | Announced |
| Technology to be used | Biomass for BF-BOF |
| Technology details | Pyrolysis |
| Iron production capacity (million tonnes per year) | Not stated |
| Steel production capacity (million tonnes per year) | Not stated |
| CO2 capture (million tonnes CO2 per year) | Not applicable |
| Hydrogen generation capacity (MW) | Not applicable |
| Investment size (m USD) | Not stated |
| Partners | BHP |
| Date of announcement | 8/29/2024 |
Plant Details
Table 2: General Plant Details
| Announced date | Start date | Workforce size | Power source | Iron ore source | Coal source |
|---|---|---|---|---|---|
| 1953[9] | 1959[10] | 12938[11] | Captive power plant #1 (1959, updated 1978), Rourkela Works-2 power station[12][13] | SAIL Barsua Mine (P100000128517); SAIL Bolani Mine (P100000128461); SAIL Kalta Mine (P100000128480); SAIL Taldih Mine (P100000128525)[14] | domestic[15] |
Table 3: Ownership and Parent Company Information
| State-owned entity status | Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|---|
| Partial | Steel Authority of India Ltd [100.0%] | 4295872623 [100.0%] | E100001000703 [100.0%] | Steel Authority of India Ltd [100%][16] | 4295872623 | E100001000703 [100%] |
Table 4: Process and Products
| Steel product category | Steel products | Steel sector end users | ISO 14001 | ISO 50001 | Main production equipment |
|---|---|---|---|---|---|
| semi-finished, finished rolled[17] | pipe, coil, sheet, plate[17] | automotive, building and infrastructure, energy, steel packaging, tools and machinery, transport[17] | yes[18] | yes[19][9] | BF; BOF |
Table 5: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|
| announced | 6012[20][21] | 6012[20][21] |
| operating | 3282[22][23] | 3282[22][23] |
| operating pre-retirement | 918[22][23] | 918[22][23] |
Table 6: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Blast furnace capacity | Nominal iron capacity (total) |
|---|---|---|
| announced | 6000[20][21] | 6000[20][21] |
| operating | 4500[24][25][26] | 4500[24][25][26] |
Table 7: Upstream Products Production Capacities (thousand tonnes per annum)
| Sinter | Coke | Pellets |
|---|---|---|
| 6776[12] | 768[23] | 2000[21] |
Table 8: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
| Year | BOF production | Total (all routes) |
|---|---|---|
| 2019 | 3444[27] | 3444[27] |
| 2020 | 3500[28] | 3500[28] |
| 2021 | 3989[29] | 3989[29] |
| 2022 | 4039[29] | 4039[29] |
| 2023 | 4160[30] | 4160[30] |
| 2024 | 4040[31] | 4040[31] |
Table 9: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
| Year | BF production | Total (all routes) |
|---|---|---|
| 2019 | 3626[32] | 3626[32] |
| 2020 | 3455[32] | 3455[32] |
| 2021 | 4340[33] | 4340[33] |
| 2022 | 4040[34] | 4040[34] |
| 2023 | 4490[30] | 4490[30] |
| 2024 | 4340[31] | 4340[31] |
Unit Details
Table 10: Blast Furnace Details
| Unit name | Status | Announced date | Start date | Furnace manufacturer and model | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
|---|---|---|---|---|---|---|---|---|
| BF 1 | operating[26] | 1953[9] | 1959[35][26] | Danieli Corus[26] | 1491.0[36][37] | 1059[26] | In Feb 2024, SAIL signed an MoU with Primetals to collaborate on projects and technologies related to decarbonization at the plant including but not limited to carbon capture and utilization (CCU), digitalization, hydrogen-based steel production, electric steelmaking, and advanced gas-cleaning solutions.; biochar trialed in 2024[38][39] | 2018-05-08[40] |
| BF 4 | operating[41] | – | 1967[42] | – | 1658.0[42] | 641[24][25] | unknown | 2020-09-09[43] |
| BF 5 | operating[44] | 2008[45] | 2013[46][26] | Danieli Corus; Tata Projects Limited; MECON Hoogoven[44][47][48][26][44] | 4060.0[49][44][48] | 2800[26] | unknown | – |
| unknown BF (1) | announced[50] | – | 2030[51] | – | – | 6000[21][20] | unknown | – |
Table 11: Basic Oxygen Furnace Details
| Unit name | Status | Announced date | Start date | Furnace manufacturer and model | Current capacity (ttpa) | Current size |
|---|---|---|---|---|---|---|
| unknown BOF (1) | operating[24] | – | 1996[52] | LD Converter[52] | 1094[22][23] | 150.0 tonnes[53] |
| unknown BOF (2) | operating[24] | – | 1996[52] | LD Converter[52] | 1094[22][23] | 150.0 tonnes[53] |
| unknown BOF (3) | operating[24] | – | 2014[54] | Mecon Limited LD Converter[54][52] | 1094[22][23] | 150.0 tonnes[53] |
| unknown BOF (4) | announced[55] | 2020[51] | 2030[51] | – | 4800[20] | –[56][57][58] |
| unknown BOF (5) | operating pre-retirement[21] | – | – | – | 481[22][23] | 66.0 tonnes[53] |
| unknown BOF (6) | operating pre-retirement[21] | – | – | – | 437[22][23] | 60.0 tonnes[53] |
| unknown BOF (7) | announced[21] | 2021[21] | – | – | 1212[21] | 150.0 tonnes[21] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ Steel Authority of India Limited, Steel Authority of India Limited, Retrieved on: May 19, 2020
- ↑ "Rourkela Steel Plant | SAIL". sail.co.in. Retrieved 2023-10-11.
- ↑ "SAIL proposes to increase capacity to 49.6 mtpa by 2030 | The Financial Express". www.financialexpress.com. Retrieved 2023-10-11.
- ↑ "Grant of Environmental Clearance (EC) to the proposed Project Activity under the provision of EIA Notification 2006-regarding" (PDF). SAIL. 30 March 2022. Retrieved 06 November, 2023.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "SAIL defers expansion project for Rourkela mill until land is cleared". www.steelorbis.com. Retrieved 2023-11-06.
- ↑ "SAIL's Rourkela steel mill capacity to be expanded to 9 million mt per year". www.steelorbis.com. Retrieved 2025-01-23.
- ↑ "SAIL to scale up Rourkela Steel Plant capacity to 9 MT by 2030 at Rs 30,000 crore investment". The Economic Times. Retrieved 2025-10-16.
- ↑ 8.0 8.1 "Annual report 2024-25" (PDF). SAIL. 2025-08-25. Retrieved 2025-10-16.
{{cite web}}: CS1 maint: url-status (link) - ↑ 9.0 9.1 9.2 (PDF) https://qcin.org/public/uploads/ck-docs/1612535905.QCI_Magazine%20(Oct-Dec%202020).pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20221018101223/https://en.wikipedia.org/wiki/Rourkela_Steel_Plant. Archived from the original on 2022-10-18.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://www.sail.co.in/sites/default/files/2024-04/Sail%20Sustinability%20Report%202022-23.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 12.0 12.1 https://web.archive.org/web/20200928010907/https://sail.co.in/rourkela-steel-plant/facilities. Archived from the original on 2020-09-28.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20210805091321/https://www.gem.wiki/Rourkela_Works-2_power_station. Archived from the original on 2021-08-05.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20231011114855/https://www.sail.co.in/plants/about-rourkela-steel-plant. Archived from the original on 2023-10-11.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://environmentclearance.nic.in/writereaddata/Online/TOR/07_Nov_2019_1602038274GKO9G9QAnnexure-Briefsummaryofproject.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20220119143642/https://www.qcc.com/firm/dd1f8d7003b654e308bf075d383f6051.html. Archived from the original on 2022-01-19.
{{cite web}}: Missing or empty|title=(help) - ↑ 17.0 17.1 17.2 https://web.archive.org/web/20220204135619/https://sail.co.in/rourkela-steel-plant/products. Archived from the original on 2022-02-04.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.sail.co.in/en/plants/environment-management-division.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.linkedin.com/posts/sail-rourkela-steel-plant-502594284_33rd-national-energy-conservation-day-observed-activity-7141036969702195200-HGGv/.
{{cite web}}: Missing or empty|title=(help) - ↑ 20.0 20.1 20.2 20.3 20.4 20.5 https://web.archive.org/web/20220613185320/https://www.newindianexpress.com/states/odisha/2022/may/28/rsp-plans-double-expansion-as-land-hurdles-remain-to-be-solved-2458987.html. Archived from the original on 2022-06-13.
{{cite web}}: Missing or empty|title=(help) - ↑ 21.00 21.01 21.02 21.03 21.04 21.05 21.06 21.07 21.08 21.09 21.10 21.11 (PDF) https://web.archive.org/web/20230518232028/https://sail.co.in/sites/default/files/steel-plants/2022-04/Env-Clearance-issued-by-MoEFCC-30-03-2022.pdf. Archived from the original (PDF) on 2023-05-18.
{{cite web}}: Missing or empty|title=(help) - ↑ 22.0 22.1 22.2 22.3 22.4 22.5 22.6 22.7 22.8 (PDF) https://web.archive.org/web/20220108035637/https://www.teriin.org/sites/default/files/2020-03/Towards%20a%20Low%20Carbon%20Steel%20Sector%20Report.pdf. Archived from the original (PDF) on 2022-01-08.
{{cite web}}: Missing or empty|title=(help) - ↑ 23.00 23.01 23.02 23.03 23.04 23.05 23.06 23.07 23.08 23.09 https://web.archive.org/web/20211118113620/https://sail.co.in/en/plants/about-rourkela-steel-plant. Archived from the original on 2021-11-18.
{{cite web}}: Missing or empty|title=(help) - ↑ 24.0 24.1 24.2 24.3 24.4 24.5 https://web.archive.org/web/20220327143934/http://www.sail.co.in/rourkela-steel-plant/about-rourkela-steel-plant. Archived from the original on 2022-03-27.
{{cite web}}: Missing or empty|title=(help) - ↑ 25.0 25.1 25.2 (PDF) https://sail.co.in/sites/default/files/upload/2022-11/9_EC%20for%20%20RSP%204.2%20MTPA%2029-01-2008%20with%20clarifications%20and%20extension.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 26.0 26.1 26.2 26.3 26.4 26.5 26.6 26.7 26.8 https://web.archive.org/web/20221111193631/https://www.steel-360.com/technology-next/innovation-is-at-core-of-rsps-expansion. Archived from the original on 2022-11-11.
{{cite web}}: Missing or empty|title=(help) - ↑ 27.0 27.1 (PDF) https://web.archive.org/web/20211117141829/https://steel.gov.in/sites/default/files/MoS%20AR%20Eng.pdf. Archived from the original (PDF) on 2021-11-17.
{{cite web}}: Missing or empty|title=(help) - ↑ 28.0 28.1 (PDF) https://web.archive.org/web/20220808195812/https://www.sail.co.in/sites/default/files/2022-02/Performance-highlights-Q3-FY-22.pdf. Archived from the original (PDF) on 2022-08-08.
{{cite web}}: Missing or empty|title=(help) - ↑ 29.0 29.1 29.2 29.3 (PDF) https://web.archive.org/web/20241007163656/https://sail.co.in/sites/default/files/upload/2023-06/2_%2520RSPs_HSM_SPP_Project_EC_implemntation_status_Oct-March,_2023.pdf. Archived from the original (PDF) on 2024-10-07.
{{cite web}}: Missing or empty|title=(help) - ↑ 30.0 30.1 30.2 30.3 (PDF) https://www.sail.co.in/sites/default/files/upload/2023-11/1_RSP-2019-Caster-4-EC-Implementation-report-October-March-2024.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 31.0 31.1 31.2 31.3 (PDF) https://www.sail.co.in/sites/default/files/2025-08/Sail%20Annual%20Report_2025_%2825_08_2025%29.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 32.0 32.1 32.2 32.3 (PDF) https://web.archive.org/web/20211127054741/https://sail.co.in/sites/default/files/2021-10/Sustainability-Report%202020_2021.pdf. Archived from the original (PDF) on 2021-11-27.
{{cite web}}: Missing or empty|title=(help) - ↑ 33.0 33.1 (PDF) https://web.archive.org/web/20230629235701/http://sail.co.in/sites/default/files/ticker/2022-09/Sail%20Annual%20Report_2021-22.pdf. Archived from the original (PDF) on 2023-06-29.
{{cite web}}: Missing or empty|title=(help) - ↑ 34.0 34.1 (PDF) https://web.archive.org/web/20250603183525/https://sail.co.in/sites/default/files/2023-09/SAIL_Annual-Report-2022-2023.pdf. Archived from the original (PDF) on 03 June 2025.
{{cite web}}: Check date values in:|archive-date=(help); Missing or empty|title=(help) - ↑ https://web.archive.org/web/20240115082233/https://sail.co.in/plants/about-rourkela-steel-plant. Archived from the original on 2024-01-15.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.slideshare.net/slideshow/case-study-on-sail-rourkela-steel-plant/263089936.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.danieli.com/en/news-media/news/top-bf-results-rourkela-steel-plant_37_547.htm.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.primetals.com/press-media/news/leading-indian-steel-producer-sail-partners-with-primetals-technologies-on-green-steel-transition-at-rourkela-plant.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.seaisi.org/details/25340?type=news-rooms.
{{cite web}}: Missing or empty|title=(help) - ↑ https://sail.co.in/en/sail-news/rebuilt-blast-furnace-1-parvati-sail-rourkela-steel-plant-blown, https://www.governancenow.com/news/psu/sails-rourkela-steel-plant-blast-furnace-blown-in, http://www.cspm.gov.in/ocmstemp/PROJ_SUMMARY?prcd=N12000084&stat=C https://sail.co.in/sites/default/files/upload/2022-11/2_%20RSPs%20implementation%20status%20of%20conditions%20of%20EC%20received%20for%203%20MTPA%20HSM%20other%20new%20projects%20April%20-%20September%202022.pdf, https://sail.co.in/en/sail-news/rebuilt-blast-furnace-1-parvati-sail-rourkela-steel-plant-blown, https://www.governancenow.com/news/psu/sails-rourkela-steel-plant-blast-furnace-blown-in, http://www.cspm.gov.in/ocmstemp/PROJ_SUMMARY?prcd=N12000084&stat=C.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ (PDF) https://sail.co.in/sites/default/files/upload/2022-11/3_%20RSPs%20implementation%20status%20of%20conditions%20of%20EC%20received%20for%204.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 42.0 42.1 https://odishabarta.com/annapurna-blast-furnace-4-of-sail-outperformed-its-metal-production/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://twitter.com/sailrsp1/status/1303690740485124097?lang=en.
{{cite web}}: Missing or empty|title=(help) - ↑ 44.0 44.1 44.2 44.3 (PDF) https://web.archive.org/web/20190419111033/http://iim-delhi.com/upload_events/Danieli_Corus.pdf. Archived from the original (PDF) on 2019-04-19.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.aist.org/danieli-corus,-tata-projects-to-build-greenfield-blast-furnace-for-sail.
{{cite web}}: Missing or empty|title=(help) - ↑ https://abmproceedings.com.br/en/article/download-pdf/sail-rsp-blast-furnace-no-5-a-greenfield-project-in-a-brownfield-optimization-context.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20220525172438/http://www.meconlimited.co.in/Metals/Iron_Making.aspx. Archived from the original on 2022-05-25.
{{cite web}}: Missing or empty|title=(help) - ↑ 48.0 48.1 https://www.danieli.com/en/news-media/news-events/sail-rsp-blast-furnace-no-5-sets-new-standards-india_37_28.htm.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.sail.co.in/en/plants/about-rourkela-steel-plant-0.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20240916172132/https://www.steelorbis.com/steel-news/latest-news/sail-defers-expansion-project-for-rourkela-mill-until-land-is-cleared-1289254.htm. Archived from the original on 2024-09-16.
{{cite web}}: Missing or empty|title=(help) - ↑ 51.0 51.1 51.2 https://web.archive.org/web/20240119033254/https://www.financialexpress.com/business/industry-sail-proposes-to-increase-capacity-to-49-6-mtpa-by-2030-1911618/. Archived from the original on 2024-01-19.
{{cite web}}: Missing or empty|title=(help) - ↑ 52.0 52.1 52.2 52.3 52.4 https://imis.aist.org/store/detail.aspx?id=PR-RU2024-1.
{{cite web}}: Missing or empty|title=(help) - ↑ 53.0 53.1 53.2 53.3 53.4 https://web.archive.org/web/20220930100102/https://www.sail.co.in/en/plants/rourkela-steel-plant/facilities. Archived from the original on 2022-09-30.
{{cite web}}: Missing or empty|title=(help) - ↑ 54.0 54.1 http://www.meconlimited.co.in/Metals/steel_making.aspx.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20210227115638/https://www.financialexpress.com/industry/sail-proposes-to-increase-capacity-to-49-6-mtpa-by-2030/1911618/. Archived from the original on 2021-02-27.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20220111171832/https://www.daily-sun.com/post/227737/Star-Consortium-KISC-to-setup-steel-plant-at-Mirersharai. Archived from the original on 2022-01-11.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://web.archive.org/web/20210929032946/https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2021.pdf (PDF).
{{cite web}}: Check|archive-url=value (help); Missing or empty|title=(help) - ↑ https://web.archive.org/web/20220112121226/https://starconsortiumbd.com/project_bci.php. Archived from the original on 2022-01-12.
{{cite web}}: Missing or empty|title=(help)