SIJ Acroni Jesenice steel plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

SIJ Acroni Jesenice steel plant, also known as Jesenice Steelworks (predecessor), is a steel plant in Koroška Bela, Jesenice, Slovenia that operates electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Koroška Bela, Jesenice, Slovenia:

Loading map...
  • Location: Cesta Borisa Kidriča 44, 4270 Jesenice, Slovenija, EU
  • Coordinates (WGS 84): 46.423994, 14.094645 (exact)

Background

The SIJ Acroni steel plant in Jesenice was a major part of the Yugoslavian steel industry. Its first Electric Arc Furnace (EAF) open in 1987 and pioneered new technologies for making stainless steel.[1] The plant likewise closed its last blast furnace in the 1980s, and as of 2026, the plant operated one EAF unit, with an annual capacity of 726 thousand tonnes of steel.[2] The feedstock for this unit is nearly 100% recycled scrap steel.[2]

In 2023, production at the plant was suspended for several months due to an accident.[3]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Plant Details

Table 1: General Plant Details

Start date Workforce size Power source
1960[4] 1300[5] Investment in site to lower emissions of power sources, but doesn't appear to raise production capacity.[6]

Table 2: Ownership and Parent Company Information

State-owned entity status Parent company Parent company PermID Parent GEM entity ID Owner Owner company PermID Owner GEM entity ID
Partial Slovenska industrija jekla dd [25.0%]; Dilon doo 4296206144 [25.0%]; 4298459452 E100001010754 [25.0%]; E100001016317 SIJ Acroni doo [100%][7] 4297143048 E100000130819 [100%]

Table 3: Process and Products

Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Responsible steel Main production equipment
semi-finished, finished rolled[7] hot rolled, cold rolled, plate, flat[7] building and infrastructure, tools and machinery[8][9] 2026-02-10[10][11] 2027-03-25[10][11] 2027-03-26[12][13][14] EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
operating 726[15][16][7] 726[15][16][7]

Table 5: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter Pellets
NF NF

Table 6: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)

Year EAF production Other/unknown steel production Total (all routes)
2019 unknown unknown –
2020 unknown unknown –
2021 unknown unknown –
2022 unknown unknown –
2023 378[17] –[17] 378[17]
2024 456[17] –[17] 456[17]

Unit Details

Table 7: Electric Arc Furnace Details

Unit name Status Announced date Construction date Start date Furnace manufacturer and model Current capacity (ttpa)
unknown EAF (1) operating[15] 1977[18] 1984-10-08[18] 1987[19][18] Mannesmann Demag[18] 726[16][15][7]

Table 8: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % scrap % pig iron (unknown if basic/merchant or granulated) % other iron
unknown EAF (1) yes[7] 93.50[20] 3.75[20] 2.75[20]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. ↑ www.acroni.si https://www.acroni.si/en/news/it-has-been-30-years-since-the-start-up-of-steel-plant-2-the-key-jesenice-investment. Retrieved 2026-01-09. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 "Production & Technology | SIJ Acroni". www.acroni.si. Retrieved 2026-01-09.
  3. ↑ "Slovenian SIJ has suspended production at one of its divisions". gmk.center. Retrieved 2026-01-09.
  4. ↑ https://web.archive.org/web/20230602144718/https://sij.acroni.si/sl/druzba-2/o-nas/zgodovina/. Archived from the original on 2023-06-02. {{cite web}}: Missing or empty |title= (help)
  5. ↑ https://web.archive.org/web/20230602141749/https://sij.acroni.si/en/. Archived from the original on 2023-06-02. {{cite web}}: Missing or empty |title= (help)
  6. ↑ https://web.archive.org/web/20221003084902/https://balkangreenenergynews.com/slovenian-steelmaker-sij-to-invest-in-decarbonization-with-bank-loan/. Archived from the original on 2022-10-03. {{cite web}}: Missing or empty |title= (help)
  7. ↑ 7.0 7.1 7.2 7.3 7.4 7.5 7.6 https://web.archive.org/web/20220320120435/https://sij.acroni.si/en/company/about-us/company-acroni/. Archived from the original on 2022-03-20. {{cite web}}: Missing or empty |title= (help)
  8. ↑ https://web.archive.org/web/20221006005948/https://sij.acroni.si/sl/acroni-blagovne-znamke/siqual/. Archived from the original on 2022-10-06. {{cite web}}: Missing or empty |title= (help)
  9. ↑ https://web.archive.org/web/20221006204059/https://www.sij.acroni.si/sl/acroni-blagovne-znamke/simold/. Archived from the original on 2022-10-06. {{cite web}}: Missing or empty |title= (help)
  10. ↑ 10.0 10.1 https://web.archive.org/web/20260126202218/https://www.acroni.si/en/documents-certificates. Archived from the original on 2026-01-26. {{cite web}}: Missing or empty |title= (help)
  11. ↑ 11.0 11.1 https://web.archive.org/web/20230602150219/https://sij.acroni.si/en/company/certificates/management-system-certificates/. Archived from the original on 2023-06-02. {{cite web}}: Missing or empty |title= (help)
  12. ↑ (PDF) https://cms.sij.si/storage/1481/Responsible-Steel-Cerified-Site.pdf. {{cite web}}: Missing or empty |title= (help)
  13. ↑ (PDF) https://cdn.prod.website-files.com/653ed7060b01292cd4518d0e/6620e9bf94b6ab708348f603_ResponsibleSteel_PublicSummary_SIJGroup_Merged.pdf. {{cite web}}: Missing or empty |title= (help)
  14. ↑ "Issued Certificates and Ongoing Audits". www.responsiblesteel.org. Archived from the original on 2025-03-11. Retrieved 2024-11-13. {{cite web}}: Text "ResponsibleSteel" ignored (help)
  15. ↑ 15.0 15.1 15.2 15.3 https://gmk.center/en/news/slovenian-sij-started-up-its-hot-rolling-mill-after-a-3-month-shutdown/. {{cite web}}: Missing or empty |title= (help)
  16. ↑ 16.0 16.1 16.2 https://web.archive.org/web/20220517082259/https://www.sij.acroni.si/en/company/about-us/history/. Archived from the original on 2022-05-17. {{cite web}}: Missing or empty |title= (help)
  17. ↑ 17.0 17.1 17.2 17.3 17.4 17.5 https://web.archive.org/web/20260126203953/https://www.sij.si/en/news/annual-report-2024. Archived from the original on 2026-01-26. {{cite web}}: Missing or empty |title= (help)
  18. ↑ 18.0 18.1 18.2 18.3 https://www.acroni.si/en/news/it-has-been-30-years-since-the-start-up-of-steel-plant-2-the-key-jesenice-investment. {{cite web}}: Missing or empty |title= (help)
  19. ↑ https://www.primetals.com/en/metals-magazine/overcoming-bottlenecks-in-steelmaking-with-an-aod-converter/. {{cite web}}: Missing or empty |title= (help)
  20. ↑ 20.0 20.1 20.2 (PDF) https://web.archive.org/web/20240217151535/https://www.acroni.si/assets/magazine-files/EPD-SIQUAL7225-and-SIDUR8715B-steel.pdf. {{cite web}}: Missing or empty |title= (help)

Resources