Setareh Simin Hormoz DRI plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Setareh Simin Hormoz DRI plant (شرکت صنایع معدنی ستاره سیمین هرمز, پروژه احیا مستقیم ستاره سیمین هرمز) is a steel plant in Bandar Abbas, Hormuzgan, Iran that operates direct reduced iron (DRI) and electric arc furnace (EAF) technology.

Location

The map below shows the exact location of the plant in Bandar Abbas, Hormuzgan, Iran:

Loading map...
  • Location:
  • Coordinates (WGS 84): 27.192922, 56.114617 (exact)

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Plant Details

Table 1: General Plant Details

Announced date Construction date Workforce size
2019[1] 2022-02[1] 1500[2]

Table 2: Ownership and Parent Company Information

State-owned entity status Parent company Parent company PermID Parent GEM entity ID Owner Owner company PermID Owner GEM entity ID
Full Iranian Mines & Mining Industries Development & Renovation Organization [100.0%] 5000935267 [100.0%] E100000000547 [100.0%] Setareh Simin Hormoz Co [100%][3] unknown E100002020643 [100%]

Table 3: Process and Products

Steel product category Steel products ISO 14001 ISO 50001 Responsible steel Main production equipment
crude cold DRI, hot DRI[4] unknown unknown unknown DRI; EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
announced 3000[5][6] 3000[5][6]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Sponge iron/DRI capacity Nominal iron capacity (total)
announced 1720[5][6] 1720[5][6]
construction 1720[7][8][4] 1720[7][8][4]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter Pellets
NF NF

Unit Details

Table 7: Direct Reduced Iron Furnace Details

Unit name Status Construction date Furnace manufacturer and model Furnace type Current capacity (ttpa)
unknown DRI (1) construction[7][1] 2022-02[1] FIECO, MME PERED[4][3][7][4] shaft furnace[9] 1720[7][8][4]
unknown DRI (2) announced[5][6] 1720[5][6]

Table 8: Direct Reduced Iron Furnace Reductant Details

Unit name Current or initial reductant Gas reductant
unknown DRI (1) gas[9] syngas (reformed methane)[9]
unknown DRI (2)

Table 9: Electric Arc Furnace Details

Unit name Status Current capacity (ttpa)
unknown EAF (1) announced[5][6] 1500[5][6]
unknown EAF (2) announced[5][6] 1500[5][6]

Table 10: Electric Arc Furnace Feedstock Details

Unit name Scrap-based
unknown EAF (1) unknown
unknown EAF (2) unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://www.irna.ir/news/84644682/%D9%85%D8%B1%D8%AD%D9%84%D9%87-%D9%86%D8%AE%D8%B3%D8%AA-%D8%B3%D8%A7%D8%AE%D8%AA-%D9%85%DA%AF%D8%A7%D9%85%D8%AF%D9%88%D9%84-%D8%A7%D8%AD%DB%8C%D8%A7-%D9%85%D8%B3%D8%AA%D9%82%DB%8C%D9%85-%D8%B4%D8%B1%DA%A9%D8%AA-%D8%B3%D8%AA%D8%A7%D8%B1%D9%87-%D8%B3%DB%8C%D9%85%DB%8C%D9%86-%D9%87%D8%B1%D9%85%D8%B2-%D8%A2%D8%BA%D8%A7%D8%B2. {{cite web}}: Missing or empty |title= (help)
  2. https://www.ilna.ir/%D8%A8%D8%AE%D8%B4-%D9%81%D9%88%D9%84%D8%A7%D8%AF-%D9%85%D8%B9%D8%AF%D9%86-264/1719059-%D8%B3%D8%AA%D8%A7%D8%B1%D9%87-%D8%B3%DB%8C%D9%85%DB%8C%D9%86-%D8%A8%D8%A7-%D8%A8%DB%8C%D8%B4-%D8%A7%D8%B2-%D8%AF%D8%B1%D8%B5%D8%AF-%D9%BE%DB%8C%D8%B4%D8%B1%D9%81%D8%AA-%D9%81%DB%8C%D8%B2%DB%8C%DA%A9%DB%8C-%D8%AF%D8%B1-%D8%AD%D8%A7%D9%84-%D8%AA%DA%A9%D9%85%DB%8C%D9%84-%D8%A7%D8%B3%D8%AA. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://www.fooladtechnic.ir/fa/project/%D8%A7%D8%AD%DB%8C%D8%A7%D8%A1-%D9%85%D8%B3%D8%AA%D9%82%DB%8C%D9%85/%D8%A7%D8%AD%DB%8C%D8%A7-%D9%85%D8%B3%D8%AA%D9%82%DB%8C%D9%85-%D9%85%DA%AF%D8%A7-%D9%85%D8%AF%D9%88%D9%84-%D8%B3%D8%AA%D8%A7%D8%B1%D9%87-%D8%B3%DB%8C%D9%85%DB%8C%D9%86-%D9%87%D8%B1%D9%85%D8%B2. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 https://mme-co.ir/%D9%BE%D8%B1%D9%88%DA%98%D9%87-%D9%87%D8%A7%DB%8C-pered/%D9%BE%D8%B1%D9%88%DA%98%D9%87-%D8%A7%D8%AD%DB%8C%D8%A7-%D9%85%D8%B3%D8%AA%D9%82%DB%8C%D9%85-%D9%85%DA%AF%D8%A7%D9%85%D8%AF%D9%88%D9%84-%D8%B3%D8%AA%D8%A7%D8%B1%D9%87-%D8%B3%DB%8C%D9%85%DB%8C%D9%86/. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 https://tajalimmd.ir/%D8%B4%D8%B1%DA%A9%D8%AA-%D9%85%D8%B9%D8%AF%D9%86%DB%8C-%D9%88-%D9%81%D9%88%D9%84%D8%A7%D8%AF%DB%8C-%D8%B3%D8%AA%D8%A7%D8%B1%D9%87-%D8%B3%D9%85%DB%8C%D9%86-%D9%87%D8%B1%D9%85%D8%B2/. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 https://web.archive.org/web/20240125053333/https://niscoir.com/?page_id=2873. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 (PDF) https://www.midrex.com/wp-content/uploads/MidrexStatsBook2024.pdf. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 https://gieco.ir/web/page/%D9%BE%D8%B1%D9%88%DA%98%D9%87-%D9%85%DA%AF%D8%A7%D9%85%D8%AF%D9%88%D9%84-%D8%A7%D8%AD%DB%8C%D8%A7%D8%A1-%D9%85%D8%B3%D8%AA%D9%82%DB%8C%D9%85-%D8%B3%D8%AA%D8%A7%D8%B1%D9%87-%D8%B3%DB%8C%D9%85%DB%8C%D9%86-%D9%87%D8%B1%D9%85%D8%B2. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 https://www.instagram.com/p/DGic0TNCoDE/. {{cite web}}: Missing or empty |title= (help)

Resources