Shakambhari Ispat and Power Purulia steel plant is a steel plant in Raghunathpur, Bartoria, Purulia, West Bengal, India that operates blast furnace (BF), direct reduced iron (DRI), and induction furnace (IF) technology.

Location

The map below shows the exact location of the plant in Raghunathpur, Bartoria, Purulia, West Bengal, India:

Loading map...
  • Location: Village: Parvatpur, Madanih, Radhamadabpur
  • Coordinates (WGS 84): 23.613861, 86.789527 (exact)

Background

Shakambhari Ispat & Power Limited (SIPL) was incorporated in 2001 as Ma Chhinnamastika Steel & Power Pvt. Ltd.[1] The plant was shut down in August 2010 as it was making loss.[2] Later in December 2010, the company was acquired by Shakambhari Group and the name of the company was changed to Shakambhari Ispat & Power Limited.[1] The company has proposed to expand its capacity from 523.95 ttpa to 787.5 ttpa.[3] The environmental clearance for the expansion was submitted on 24 March 2023, and granted on 19 July 2023.[4] Shakambhari Group plans to invest INR 5,000 crore for expanding capacity at the plant.[5]

As of March 2025, the plant has an installed capacity of 759 ttpa for sponge iron, 660 ttpa for billet, 660 ttpa for rolled product, 111 ttpa for ferro alloy and 83 MW of captive power plant.[6]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Plant Details

Table 1: General Plant Details

Start date Workforce size Power source Iron ore source Coal source
2001[7] 1700[8] 99 MW CPP (being enhanced to 126 MW)[9][10] unknown unknown

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent GEM entity ID Owner Owner company PermID Owner GEM entity ID
Shakambhari Group unknown E100001012203 Shakambhari Ispat & Power Ltd [100%][11] 5063329547 E100001012202 [100%]

Table 3: Process and Products

Steel product category Steel products ISO 14001 Main production equipment
semi-finished, finished rolled[12] billet, DRI, bar[12] Expired[13] BF; DRI; IF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Induction furnace steelmaking capacity Nominal crude steel capacity (total)
operating 660[14][9] 660[14][9]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Blast furnace capacity Sponge iron/DRI capacity Nominal iron capacity (total)
announced 415[9] 415[9]
operating 759[14][9] 759[14][9]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter Pellets
198[9] 198[10]

Table 7: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)

Year DRI production
2019 unknown
2020 unknown
2021 unknown
2022 unknown
2023 unknown
2024 unknown

Unit Details

Table 8: Blast Furnace Details

Unit name Status Announced date Current size Current capacity (ttpa) Decarbonization technology
unknown BF (1) announced[15] 2013[16] 350.0 m3[9] 415[9] unknown

Table 9: Direct Reduced Iron Furnace Details

Unit name Status Announced date Furnace manufacturer and model Furnace type Current capacity (ttpa)
DRI 1 operating[9][15] German SL/RN Technology[17] rotary kiln[9] 32[9]
DRI 2 operating[9][15] German SL/RN Technology[17] rotary kiln[9] 32[9]
DRI 3 operating[9][15] German SL/RN Technology[17] rotary kiln[9] 32[9]
DRI 4 operating[9][15] German SL/RN Technology[17] rotary kiln[9] 32[9]
DRI 5 operating[9][15] 2013[16] rotary kiln[9] 112[9]
DRI 6 operating[9][15] 2013[16] rotary kiln[9] 112[9]
DRI 7 operating[9][15] 2013[16] rotary kiln[9] 192[9]
unknown DRI (1) operating[14][9] 2016[9] rotary kiln[18] 215[14][9]

Table 10: Direct Reduced Iron Furnace Reductant Details

Unit name Current or initial reductant
DRI 1 coal (solid)[17]
DRI 2 coal (solid)[17]
DRI 3 coal (solid)[17]
DRI 4 coal (solid)[17]
DRI 5 coal (solid)[19]
DRI 6 coal (solid)[19]
DRI 7 coal (solid)[19]
unknown DRI (1) coal (solid)[19]

Table 11: Induction Furnace Details

Unit name Status Current capacity (ttpa) Current size
unknown IF (1) operating[9] 73[14][9] 25.0 tonnes[9]
unknown IF (2) operating[9] 73[14][9] 25.0 tonnes[9]
unknown IF (3) operating[9] 73[14][9] 25.0 tonnes[9]
unknown IF (4) operating[9] 73[14][9] 25.0 tonnes[9]
unknown IF (5) operating[9] 73[14][9] 25.0 tonnes[9]
unknown IF (6) operating[9] 73[14][9] 25.0 tonnes[9]
unknown IF (7) operating[9] 74[14][9] 25.0 tonnes[9]
unknown IF (8) operating[9] 74[14][9] 25.0 tonnes[9]
unknown IF (9) operating[9] 74[14][9] 25.0 tonnes[9]

Table 12: Induction Furnace Feedstock Details

Unit name Scrap-based % scrap % DRI % granulated pig iron
unknown IF (1) yes 8.47[9] 83.05[9] 8.47[9]
unknown IF (2) yes 8.47[9] 83.05[9] 8.47[9]
unknown IF (3) yes 8.47[9] 83.05[9] 8.47[9]
unknown IF (4) yes 8.47[9] 83.05[9] 8.47[9]
unknown IF (5) yes 8.47[9] 83.05[9] 8.47[9]
unknown IF (6) yes 8.47[9] 83.05[9] 8.47[9]
unknown IF (7) yes 8.47[9] 83.05[9] 8.47[9]
unknown IF (8) yes 8.47[9] 83.05[9] 8.47[9]
unknown IF (9) yes 8.47[9] 83.05[9] 8.47[9]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 "Press Release" (PDF). Acuite. 02 September 2022. Retrieved 12 January 2024. {{cite web}}: Check date values in: |date= (help)CS1 maint: url-status (link)
  2. "Rating Advisory" (PDF). CRISIL. 22 December 2022. Retrieved 12 January 2024.{{cite web}}: CS1 maint: url-status (link)
  3. Cite error: Invalid <ref> tag; no text was provided for refs named :0
  4. "Grant of Environmental Clearance (EC) to the proposed Project Activity under the provision of EIA Notification 2006-regarding" (PDF). shakambhariispat.com. 2023-07-19. Retrieved 2024-12-12.{{cite web}}: CS1 maint: url-status (link)
  5. "Bengal steel industry to get Rs8,000cr investment over 5 years | Kolkata News - Times of India". The Times of India. Retrieved 2025-10-29.
  6. "Press Release". connect.acuite.in. Retrieved 2025-10-29.
  7. (PDF) https://web.archive.org/web/20240911162225/https://www.crisil.com/mnt/winshare/Ratings/RatingList/RatingDocs/Shakambhari%2520Ispat%2520and%2520Power%2520Limited-RA-22-12-2022.pdf. Archived from the original (PDF) on 2024-09-11. {{cite web}}: Missing or empty |title= (help)
  8. (PDF) https://environmentclearance.nic.in/writereaddata/Online/TOR/12_Jul_2021_17555975374314830PFR_SIPL.pdf. {{cite web}}: Missing or empty |title= (help)
  9. 9.00 9.01 9.02 9.03 9.04 9.05 9.06 9.07 9.08 9.09 9.10 9.11 9.12 9.13 9.14 9.15 9.16 9.17 9.18 9.19 9.20 9.21 9.22 9.23 9.24 9.25 9.26 9.27 9.28 9.29 9.30 9.31 9.32 9.33 9.34 9.35 9.36 9.37 9.38 9.39 9.40 9.41 9.42 9.43 9.44 9.45 9.46 9.47 9.48 9.49 9.50 9.51 9.52 9.53 9.54 9.55 9.56 9.57 9.58 9.59 9.60 9.61 9.62 9.63 9.64 9.65 9.66 9.67 9.68 9.69 9.70 9.71 9.72 9.73 9.74 9.75 9.76 9.77 9.78 9.79 9.80 9.81 9.82 9.83 9.84 9.85 9.86 9.87 (PDF) https://web.archive.org/web/20240115051422/https://shakambhariispat.com/assets/uploads/documents/SIPL_apr23_sept23.pdf. Archived from the original (PDF) on 2024-01-15. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 (PDF) http://shakambhariispat.com/assets/uploads/documents/SIPL_oct23_mar24.pdf. {{cite web}}: Missing or empty |title= (help)
  11. https://web.archive.org/web/20240115050821/https://shakambhariispat.com/about-us. Archived from the original on 2024-01-15. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 (PDF) https://web.archive.org/web/20240806152907/https://www.acuite.in/documents/ratings/revised/28005-RR-20220902.pdf. Archived from the original (PDF) on 06 August 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  13. http://shakambhariispat.com/statutory-certificates. {{cite web}}: Missing or empty |title= (help)
  14. 14.00 14.01 14.02 14.03 14.04 14.05 14.06 14.07 14.08 14.09 14.10 14.11 14.12 14.13 14.14 https://connect.acuite.in/fcompany-details/SHAKAMBHARI_ISPAT_AND_POWER_LIMITED/27th_Mar_25. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 15.2 15.3 15.4 15.5 15.6 15.7 (PDF) https://web.archive.org/web/20240115081224/https://shakambhariispat.com/assets/uploads/documents/SIPLEC2_19072023.pdf. Archived from the original (PDF) on 2024-01-15. {{cite web}}: Missing or empty |title= (help)
  16. 16.0 16.1 16.2 16.3 (PDF) https://web.archive.org/web/20240913171859/https://shakambhariispat.com/assets/uploads/documents/SIPLEC2_21122016.pdf. Archived from the original (PDF) on 2024-09-13. {{cite web}}: Missing or empty |title= (help)
  17. 17.0 17.1 17.2 17.3 17.4 17.5 17.6 17.7 https://web.archive.org/web/20240513202535/http://shakambhariispat.com/sponge-iron. Archived from the original on 2024-05-13. {{cite web}}: Missing or empty |title= (help)
  18. (PDF) https://www.bseindia.com/downloads/ipo/2018917104439DRHP_Shri%20Bajrang%20Power%20and%20Ispat%20Limited.pdf. {{cite web}}: Missing or empty |title= (help)
  19. 19.0 19.1 19.2 19.3 (PDF) https://web.archive.org/web/20240513204112/https://www.wbpcb.gov.in/writereaddata/files/Executive%2520summary%2520Shakambhari.pdf. Archived from the original (PDF) on 2024-05-13. {{cite web}}: Missing or empty |title= (help)

Resources