Shandong IRON&STEEL Group Rizhao Co Ltd

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Shandong IRON&STEEL Group Rizhao Co Ltd (山东钢铁集团日照有限公司(一期)) is a blast furnace-basic oxygen furnace (BF-BOF) steel plant operating in Rizhao, Shandong, China.

Location

The map below shows the exact location of the plant in Rizhao, Shandong, China:

Loading map...
  • Location: No.1 Lingang Road, Donggang District, Rizhao City, Shandong Province, China.
  • Coordinates (WGS 84): 35.188969, 119.383723 (exact)

Background

In 2022, it is planned to build a 160-ton electric arc furnace with a production capacity of 1.3 million tons, which is expected to be completed and put into operation in 2024.[1]

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Start date Workforce size Power source
Main plant Operating[2] 2019[2] 5725[3]
Expansion Announced[4] 2022-01[4] 2024[4] Self-owned Energy and Power Plant[5]

Table 2: Ownership and Parent Company Information

Phase Parent company Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Main plant Shandong Iron and Steel Co Ltd [50.6%]; Shandong Iron and Steel Group Co Ltd [34.0%]; Shandong Guohui Investment Co Ltd [9.7%]; Shandong Caixin Asset Operation Co Ltd [4.9%]; other [0.8%] E100000126101 [50.6%]; E100000125551 [43.7%]; E100000125675 [4.9%]; E100000001753 [0.8%] Shandong IRON&STEEL Group Rizhao Co., Ltd.[3] 5044174307 E100000126308

Table 3: Process and Products

Phase Steel product category Steel products Steel sector end users ISO 14001 ISO 50001 Main production equipment Detailed production equipment
Main plant finished rolled[6] Medium and heavy plates, hot-rolled coils, cold-rolled coils, H-beams, special steels, hot-rolled ribbed steel bars[3] automotive; building and infrastructure; energy; tools and machinery; transport[3] 1905-07-13 00:00:00[7] 1905-07-13 00:00:00[7] BF, BOF[8] 4 BOF (4x210-tonne)[9]
Expansion finished rolled[6] Medium and heavy plates, hot-rolled coils, cold-rolled coils, H-beams, special steels, hot-rolled ribbed steel bars[3] automotive; building and infrastructure; energy; tools and machinery; transport[3] EAF[10] 1 EAF (1x160-tonne)[10]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Basic oxygen furnace steelmaking capacity Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
Main plant operating 8500 TTPA[11][11][11][11] 8500 TTPA[11][11][11][11]
Expansion announced 1300 TTPA[4] 1300 TTPA[4]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Blast furnace capacity Nominal iron capacity (total)
Main plant operating 8100 TTPA[12][12] 8100 TTPA[12][12]
Expansion announced

Blast Furnace Details

Table 6: Blast Furnace Details

Unit name Status Announced date Construction date Start date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
1 operating[13] unknown unknown 2017[12] 5100 m³[12] 4050[12] unknown unknown
2 operating[13] unknown unknown 2019-04-11[12] 5100 m³[12] 4050[12] unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 日照钢铁精品基地短流程绿色智慧示范项目产能置换方案公告,山东省工信厅,January 11, 2022
  2. 2.0 2.1 https://www.sohu.com/a/335425321_611198. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 https://web.archive.org/web/20220112150514/https://www.qcc.com/firm/5c7a72d621dfa55ded465fead2c1a110.html. Archived from the original on 12 January 2022. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 https://m.mysteel.com/22/0111/16/35CDCFFCF2611C2D_abc.html. {{cite web}}: Missing or empty |title= (help)
  5. http://www.chinapower.com.cn/jnhb/zhxw/20230802/211646.html. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20200201232213/http://www.shansteelrz.com:80/weblist1.jsp?pid=689. Archived from the original on 01 February 2020. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. 7.0 7.1 http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E5%B1%B1%E4%B8%9C%E9%92%A2%E9%93%81%E9%9B%86%E5%9B%A2%E6%97%A5%E7%85%A7%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. {{cite web}}: Missing or empty |title= (help)
  8. https://www.sohu.com/a/335425321_611198,http://www.shandongyejian.com/thread-41-1-1.html. {{cite web}}: Missing or empty |title= (help)
  9. https://web.archive.org/web/20221111064445/https://huanbao.bjx.com.cn/news/20221026/1263911.shtml. Archived from the original on 11 November 2022. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 https://gc.mysteel.com/21/1213/19/944AAAA91DBE794C.html. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 11.3 11.4 11.5 11.6 11.7 https://web.archive.org/web/20220119152506/http://finance.eastmoney.com/a/202006091515228144.html. Archived from the original on 19 January 2022. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 12.2 12.3 12.4 12.5 12.6 12.7 12.8 12.9 https://read01.com/zh-my/7RNDNm7.html#.Y-2eGOxBxhE. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml,http://www.shandongyejian.com/thread-41-1-1.html. {{cite web}}: Missing or empty |title= (help)

Resources