Shandong Luli Steel Co Ltd (山东鲁丽钢铁有限公司) is a steel plant in Hou, Shouguang, Weifang, Shandong, China that operates basic oxygen furnace (BOF), blast furnace (BF), and direct reduced iron (DRI) technology.
Location
The map below shows the exact location of the plant in Hou, Shouguang, Weifang, Shandong, China:
Location:
Coordinates (WGS 84 ): 36.970875, 118.955444 (exact)
Background
The company was fined for violations discovered during a safety risk and hazard inspection conducted by the Shandong Province Emergency Management Department.[ 1]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker , a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
Table 2: Ownership and Parent Company Information
Parent company
Parent company PermID
Parent GEM entity ID
Owner
Owner company PermID
Owner GEM entity ID
Luli Group Co Ltd [49.0%]; unknown [39.6%]; natural person(s) [11.4%]
unknown [49.0%]; not applicable [39.6%]; not applicable [11.4%]
E100000127670 [49.0%]; E100000132388 [39.6%]; E100000123261 [11.4%]
Shandong Luli Steel Co Ltd [100%][ 4]
unknown
E100000126856 [100%]
Table 3: Process and Products
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
1 Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1
Basic oxygen furnace steelmaking capacity
Nominal crude steel capacity (total)
operating
1400[ 7]
1400[ 7]
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
1 Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1
Blast furnace capacity
Sponge iron/DRI capacity
Nominal iron capacity (total)
operating
2080[ 8]
600[ 9]
2680[ 8] [ 9]
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Ferronickel
Sinter
Coke
Pellets
NF
NF
NF
NF
Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year
BOF production
Other/unknown steel production
2019
unknown
unknown
2020
unknown
unknown
2021
unknown
unknown
2022
unknown
unknown
2023
unknown
unknown
2024
unknown
unknown
Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
Year
BF production
Other/unknown iron production
2019
unknown
unknown
2020
unknown
unknown
2021
unknown
unknown
2022
unknown
unknown
2023
unknown
unknown
2024
unknown
unknown
Unit Details
Table 9: Blast Furnace Details
Unit name
Status
Current size
Current capacity (ttpa)
Decarbonization technology
Most recent relining
BF 1
operating[ 10]
1080.0 m3[ 11]
1040[ 8]
unknown
2021-01-30[ 12]
BF 2
operating[ 13]
1080.0 m3[ 11]
1040[ 8]
unknown
2021-01-26[ 14]
Table 10: Direct Reduced Iron Furnace Details
Unit name
Status
Start date
Current capacity (ttpa)
unknown DRI (1)
operating[ 9]
2016[ 9]
600[ 9]
Table 11: Basic Oxygen Furnace Details
Unit name
Status
Current capacity (ttpa)
Current size
unknown BOF (1)
operating[ 2]
1400[ 7]
120.0 tonnes[ 11]
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
Resources